Y1640/24
01/22/2025 16:00
02/19/2025 15:59
REFER TO AIP CHINA AMENDMENT NR.1/2025(2024-12-15) ZYHB
AD2.24-2, PUBLICATION DATE CHANGE FROM 2024-10-15 TO 2024-12-15,
EFFECTIVE TIME CHANGE FROM 2411271600 TO 2501221600.
OTHERS REMAIN UNCHANGED.
Start Date UTC
01/22/2025 16:00
End Date UTC
02/19/2025 15:59
Conditions
REFER TO AIP CHINA AMENDMENT NR.1/2025(2024-12-15) ZYHB
AD2.24-2, PUBLICATION DATE CHANGE FROM 2024-10-15 TO 2024-12-15,
EFFECTIVE TIME CHANGE FROM 2411271600 TO 2501221600.
OTHERS REMAIN UNCHANGED.
Y1554/24
11/21/2024 11:06
01/22/2025 15:59
AD OPERATION MINIMA CHANGED AS FLW:
1. IAC RNAV ILS/DME Z RWY05L:ACFT TYPE A,B,C,D:HUD SPECIAL CAT II
U/S.
2. IAC ILS/DME Y RWY05L:ACFT TYPE A,B,C,D:HUD SPECIAL CAT II U/S.
Start Date UTC
11/21/2024 11:06
End Date UTC
01/22/2025 15:59
Conditions
AD OPERATION MINIMA CHANGED AS FLW:
1. IAC RNAV ILS/DME Z RWY05L:ACFT TYPE A,B,C,D:HUD SPECIAL CAT II
U/S.
2. IAC ILS/DME Y RWY05L:ACFT TYPE A,B,C,D:HUD SPECIAL CAT II U/S.
Y1619/24
12/05/2024 07:49
01/22/2025 15:59
REF AIP ZYHB AD2.20 2.12 RULES FOR THE USE OF VERTICAL TWY A1
CHANGED AS FLW:
2.12.1 WHEN DEPARTURE ACFT HOLDING AT TWY A1,OTHER ACFT ARE
FORBIDDEN TO PASS BEHIND.
Start Date UTC
12/05/2024 07:49
End Date UTC
01/22/2025 15:59
Conditions
REF AIP ZYHB AD2.20 2.12 RULES FOR THE USE OF VERTICAL TWY A1
CHANGED AS FLW:
2.12.1 WHEN DEPARTURE ACFT HOLDING AT TWY A1,OTHER ACFT ARE
FORBIDDEN TO PASS BEHIND.
Y1621/24
12/09/2024 06:47
01/22/2025 15:59
ADD NEW OBSTACLES WITHIN A CIRCLE WITH A RADIUS OF 15KM
CENTERED ON THE CENTER OF RWY05L/23R:
OBSTACLE ID/DESIGNATION TYPE POSITION MAG BRG(DEGREE)/DIST(M)
ELEVATION(M)OBSTACLE MARKING/LIGHTING TYPE AND
COLOURFLIGHTPROCEDURE/TAKE-OFF PATH AREA AFFECTED&REMARKS
01 CRANE 288/1,537
261.0 LGT
-
ARM LENGTH 60M.
Start Date UTC
12/09/2024 06:47
End Date UTC
01/22/2025 15:59
Conditions
ADD NEW OBSTACLES WITHIN A CIRCLE WITH A RADIUS OF 15KM
CENTERED ON THE CENTER OF RWY05L/23R:
OBSTACLE ID/DESIGNATION TYPE POSITION MAG BRG(DEGREE)/DIST(M)
ELEVATION(M)OBSTACLE MARKING/LIGHTING TYPE AND
COLOURFLIGHTPROCEDURE/TAKE-OFF PATH AREA AFFECTED&REMARKS
01 CRANE 288/1,537
261.0 LGT
-
ARM LENGTH 60M.
Y1622/24
12/09/2024 07:02
01/22/2025 15:59
DUE TO MAINT,AD OPERATION MINIMA CHANGED AS FLW:
1.IAC RNAV ILS/DME Z RWY05L: A/B/C/D
GP INOP
MDA/H 275M(136M)
RVR/VIS 1,900M/1,900M
2.IAC ILS/DME Y RWY05L: A/B/C/D
GP INOP
MDA/H 275M(136M)
RVR/VIS 1,900M/1,900M
3.IAC VOR/DME RWY05L: A/B/C/D
MDA/H 290M(151M)
RVR/VIS 2,200M/2,200M
4.IAC NDB/DME RWY05L: A/B/C/D
MDA/H 310M(171M)
RVR/VIS 2,600M/2,600M
5.IAC NDB/DME RWY23R: A/B/C/D
MDA/H 265M(131M)
RVR/VIS 1,700M/1,700M
6. CIRCLING:
RWY05L/23R A B C
D
MDA/H 355M(216M) 355M(216M) 385M(246M)
385M(246M)
VIS 2,600M 2,600M 3,200M
3,600M
Start Date UTC
12/09/2024 07:02
End Date UTC
01/22/2025 15:59
Conditions
DUE TO MAINT,AD OPERATION MINIMA CHANGED AS FLW:
1.IAC RNAV ILS/DME Z RWY05L: A/B/C/D
GP INOP
MDA/H 275M(136M)
RVR/VIS 1,900M/1,900M
2.IAC ILS/DME Y RWY05L: A/B/C/D
GP INOP
MDA/H 275M(136M)
RVR/VIS 1,900M/1,900M
3.IAC VOR/DME RWY05L: A/B/C/D
MDA/H 290M(151M)
RVR/VIS 2,200M/2,200M
4.IAC NDB/DME RWY05L: A/B/C/D
MDA/H 310M(171M)
RVR/VIS 2,600M/2,600M
5.IAC NDB/DME RWY23R: A/B/C/D
MDA/H 265M(131M)
RVR/VIS 1,700M/1,700M
6. CIRCLING:
RWY05L/23R A B C
D
MDA/H 355M(216M) 355M(216M) 385M(246M)
385M(246M)
VIS 2,600M 2,600M 3,200M
3,600M
Y1639/24
12/23/2024 09:44
01/22/2025 15:59
TWY B11,B12,B13 ONLY AVBL FOR ACFT WITH WINGSPAN LESS THAN 36M.
Start Date UTC
12/23/2024 09:44
End Date UTC
01/22/2025 15:59
Conditions
TWY B11,B12,B13 ONLY AVBL FOR ACFT WITH WINGSPAN LESS THAN 36M.
Y1224/24
10/02/2024 16:00
01/03/2025 08:00
AD OPERATION MINIMA CHANGED AS FLW:
1. IAC RNAV ILS/DME Z RWY05L:
ACFT TYPE A,B,C,D:HUD SPECIAL CAT II U/S.
2. IAC ILS/DME Y RWY05L:
ACFT TYPE A,B,C,D:HUD SPECIAL CAT II U/S.
3. TAKE-OFF MINIMA RWY05L/23R HUD RVR150 U/S.
Start Date UTC
10/02/2024 16:00
End Date UTC
01/03/2025 08:00
Conditions
AD OPERATION MINIMA CHANGED AS FLW:
1. IAC RNAV ILS/DME Z RWY05L:
ACFT TYPE A,B,C,D:HUD SPECIAL CAT II U/S.
2. IAC ILS/DME Y RWY05L:
ACFT TYPE A,B,C,D:HUD SPECIAL CAT II U/S.
3. TAKE-OFF MINIMA RWY05L/23R HUD RVR150 U/S.
Y1225/24
10/02/2024 16:00
01/03/2025 08:00
DUE TO MAINT,AD OPERATION MINIMA CHANGED AS FLW:
1.IAC RNAV ILS/DME Z RWY05L: A/B/C/D
GP INOP
MDA/H 275M(136M)
RVR/VIS 1,900M/1,900M
2.IAC ILS/DME Y RWY05L: A/B/C/D
GP INOP
MDA/H 275M(136M)
RVR/VIS 1,900M/1,900M
3.IAC VOR/DME RWY05L: A/B/C/D
MDA/H 290M(151M)
RVR/VIS 2,200M/2,200M
4.IAC NDB/DME RWY05L: A/B/C/D
MDA/H 310M(171M)
RVR/VIS 2,600M/2,600M
5.IAC NDB/DME RWY23R: A/B/C/D
MDA/H 265M(131M)
RVR/VIS 1,700M/1,700M
6. CIRCLING:
RWY05L/23R A B C
D
MDA/H 355M(216M) 355M(216M) 385M(246M)
)
// END PART 01 OF 02 //
Start Date UTC
10/02/2024 16:00
End Date UTC
01/03/2025 08:00
Conditions
DUE TO MAINT,AD OPERATION MINIMA CHANGED AS FLW:
1.IAC RNAV ILS/DME Z RWY05L: A/B/C/D
GP INOP
MDA/H 275M(136M)
RVR/VIS 1,900M/1,900M
2.IAC ILS/DME Y RWY05L: A/B/C/D
GP INOP
MDA/H 275M(136M)
RVR/VIS 1,900M/1,900M
3.IAC VOR/DME RWY05L: A/B/C/D
MDA/H 290M(151M)
RVR/VIS 2,200M/2,200M
4.IAC NDB/DME RWY05L: A/B/C/D
MDA/H 310M(171M)
RVR/VIS 2,600M/2,600M
5.IAC NDB/DME RWY23R: A/B/C/D
MDA/H 265M(131M)
RVR/VIS 1,700M/1,700M
6. CIRCLING:
RWY05L/23R A B C
D
MDA/H 355M(216M) 355M(216M) 385M(246M)
)
// END PART 01 OF 02 //
Y1588/24
11/29/2024 18:20
12/30/2024 20:40
RWY05L/23R CLSD DUE TO WIP.
Start Date UTC
11/29/2024 18:20
End Date UTC
12/30/2024 20:40
Conditions
RWY05L/23R CLSD DUE TO WIP.
Y0036/24
01/27/2024 16:01
PERM
RWY END SAFETY AREA SET UP:
1.RWY05: LENGTH 240M WIDTH 150M.
2.RWY23: LENGTH 240M WIDTH 150M.
Start Date UTC
01/27/2024 16:01
Conditions
RWY END SAFETY AREA SET UP:
1.RWY05: LENGTH 240M WIDTH 150M.
2.RWY23: LENGTH 240M WIDTH 150M.
Y0433/24
04/10/2024 08:00
PERM
NEW OBST ERECTED AS FLW,ALL THE DATA BASED ON CENTER OF
RWY05/23,OBST WITH LIGHT:
NR. OBSTACLE TYPE BRG(MAG) (DEG) DIST(M) ELEVATION(M)
01 CRANE 288 1,537 261.0
ARM LENGTH 60M.
Start Date UTC
04/10/2024 08:00
Conditions
NEW OBST ERECTED AS FLW,ALL THE DATA BASED ON CENTER OF
RWY05/23,OBST WITH LIGHT:
NR. OBSTACLE TYPE BRG(MAG) (DEG) DIST(M) ELEVATION(M)
01 CRANE 288 1,537 261.0
ARM LENGTH 60M.
Y0572/24
05/11/2024 16:00
PERM
DURING AD RWY05 IN OPERATION,ARRIVAL ACFT FM HEIHE VIA A588
SHALL PREPARE WITH BUBDI-08A(BY ATC) PROCEDURE,ACFT FM QIQIHAR VIA
B451
SHALL PREPARE WITH ONINA-01A PROCEDURE. ACFT NEED TO APPLY
TO ATC IN ADVANCE IF CANNOT PERFORM.
DURING AD RWY23 IN OPERATION,ARRIVAL ACFT FM HEIHE VIA A588
SHALL PREPARE WITH BUBDI-11A PROCEDURE, ACFT FM QIQIHAR VIA B451
SHALL PREPARE WITH ONINA-18A(BY ATC) PROCEDURE. ACFT NEED TO
APPLY TO ATC IN ADVANCE IF CANNOT PERFORM.
Start Date UTC
05/11/2024 16:00
Conditions
DURING AD RWY05 IN OPERATION,ARRIVAL ACFT FM HEIHE VIA A588
SHALL PREPARE WITH BUBDI-08A(BY ATC) PROCEDURE,ACFT FM QIQIHAR VIA
B451
SHALL PREPARE WITH ONINA-01A PROCEDURE. ACFT NEED TO APPLY
TO ATC IN ADVANCE IF CANNOT PERFORM.
DURING AD RWY23 IN OPERATION,ARRIVAL ACFT FM HEIHE VIA A588
SHALL PREPARE WITH BUBDI-11A PROCEDURE, ACFT FM QIQIHAR VIA B451
SHALL PREPARE WITH ONINA-18A(BY ATC) PROCEDURE. ACFT NEED TO
APPLY TO ATC IN ADVANCE IF CANNOT PERFORM.