W1046/24
11/27/2024 04:15
02/28/2025 15:59
THE LENGTH OF PALS CAT III FOR RWY25 CHANGED TO 750M.
Start Date UTC
11/27/2024 04:15
End Date UTC
02/28/2025 15:59
Conditions
THE LENGTH OF PALS CAT III FOR RWY25 CHANGED TO 750M.
W0989/24
11/01/2024 06:23
02/01/2025 15:59
AD OPERATION MINIMA CHANGED AS FLW:
1.CIRCLING VIS FOR CAT A/B/C CHANGED TO 3600M IN ALL IAC FOR BOTH
RWY.
2.IAC RNAV ILS/DME Z RWY25,IAC ILS/DME Y RWY25:GP INOP VIS FOR CAT
A/B/C/D CHANGED TO 3600M.
3.IAC VOR/DME Z RWY25,IAC VOR/DME Y RWY25: VOR/DME VIS FOR CAT
A/B/C/D CHANGED TO 3600M.
Start Date UTC
11/01/2024 06:23
End Date UTC
02/01/2025 15:59
Conditions
AD OPERATION MINIMA CHANGED AS FLW:
1.CIRCLING VIS FOR CAT A/B/C CHANGED TO 3600M IN ALL IAC FOR BOTH
RWY.
2.IAC RNAV ILS/DME Z RWY25,IAC ILS/DME Y RWY25:GP INOP VIS FOR CAT
A/B/C/D CHANGED TO 3600M.
3.IAC VOR/DME Z RWY25,IAC VOR/DME Y RWY25: VOR/DME VIS FOR CAT
A/B/C/D CHANGED TO 3600M.
V0778/24
11/01/2024 17:39
02/01/2025 15:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED ILS DME Y RWY 25: S-LOC 25 MINIMA CHANGED AS FOLLOWS: CAT ABCD 2860-3600M 734 (800-3600M).
Start Date UTC
11/01/2024 17:39
End Date UTC
02/01/2025 15:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED ILS DME Y RWY 25: S-LOC 25 MINIMA CHANGED AS FOLLOWS: CAT ABCD 2860-3600M 734 (800-3600M).
V0779/24
11/01/2024 17:47
02/01/2025 15:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED ILS DME Y RWY 25: CAT ABC CIRCLING VIS CHANGED TO 3600M.
Start Date UTC
11/01/2024 17:47
End Date UTC
02/01/2025 15:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED ILS DME Y RWY 25: CAT ABC CIRCLING VIS CHANGED TO 3600M.
V0780/24
11/01/2024 17:49
02/01/2025 15:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED ILS DME Y RWY 07: CIRCLING VIS FOR CAT ABC CHANGED TO 3600M.
Start Date UTC
11/01/2024 17:49
End Date UTC
02/01/2025 15:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED ILS DME Y RWY 07: CIRCLING VIS FOR CAT ABC CHANGED TO 3600M.
W0987/24
11/01/2024 02:42
02/01/2025 04:00
TWO NEW RWY UNDER CONSTRUCTION DO NOT USE.
PSN:1.PARALLEL TO RWY07/25, 1,830M NORTH OF RWY07/25.
2.PARALLEL TO RWY07/25, 2,210M NORTH OF RWY07/25.
EXERCISE CAUTION WHILE LANDING AND TAKE-OFF.
Start Date UTC
11/01/2024 02:42
End Date UTC
02/01/2025 04:00
Conditions
TWO NEW RWY UNDER CONSTRUCTION DO NOT USE.
PSN:1.PARALLEL TO RWY07/25, 1,830M NORTH OF RWY07/25.
2.PARALLEL TO RWY07/25, 2,210M NORTH OF RWY07/25.
EXERCISE CAUTION WHILE LANDING AND TAKE-OFF.
W1116/24
12/30/2024 18:00
01/13/2025 22:30
RWY07/25 CLSD DUE TO MAINT,AD AVBL FOR ALTN.
Start Date UTC
12/30/2024 18:00
End Date UTC
01/13/2025 22:30
Conditions
RWY07/25 CLSD DUE TO MAINT,AD AVBL FOR ALTN.
W1119/24
12/30/2024 18:00
01/13/2025 22:30
TWY A AND TWY B CLSD DUE TO MAINT.
Start Date UTC
12/30/2024 18:00
End Date UTC
01/13/2025 22:30
Conditions
TWY A AND TWY B CLSD DUE TO MAINT.
W1117/24
12/26/2024 07:09
12/29/2024 07:09
W1117/24 NOTAMC W1110/24
Q) ZWUQ/QMXXX//M//000/999/
A) ZWWW B) 2412260707
E) SEE NEXT NTM.
Start Date UTC
12/26/2024 07:09
End Date UTC
12/29/2024 07:09
Conditions
W1117/24 NOTAMC W1110/24
Q) ZWUQ/QMXXX//M//000/999/
A) ZWWW B) 2412260707
E) SEE NEXT NTM.
W1114/24
12/26/2024 07:04
12/29/2024 07:04
W1114/24 NOTAMC W1109/24
Q) ZWUQ/QMRXX//M//000/999/
A) ZWWW B) 2412260703
E) SEE NEXT NTM.
Start Date UTC
12/26/2024 07:04
End Date UTC
12/29/2024 07:04
Conditions
W1114/24 NOTAMC W1109/24
Q) ZWUQ/QMRXX//M//000/999/
A) ZWWW B) 2412260703
E) SEE NEXT NTM.
W0763/20
12/30/2020 16:00
PERM
RADAR CONTROL AND ADS-B MERGING OPERATION IMPLEMENTED WITHIN
URUMQI APPROACH CONTROL AREA:
1. DURING RADAR CONTROL AND ADS-B MERGING OPERATION, RADAR CONTROL
SHALL IMPLEMENT WITHIN URUMQI APPROACH CONTROL AREA, THE MINIMUM
HORIZONTAL RADAR SEPARATION IS 5.6KM.
2. IF RADAR CONTROL SERVICE FAILURE, ADS-B PROCEDURE SHALL
IMPLEMENT WITHIN URUMQI APPROACH CONTROL AREA, THE MINIMUM
HORIZONTAL SEPARATION OF AIRCRAFT ( CONTACTED WITH ADS-B) IS 10KM.
FLW PROCEDURES DO NOT USE: RADAR CONTROL WITHIN URUMQI APP HAS
BEEN IMPLEMENTED. THE MINIMUM HORIZONTAL RADAR SEPARATION 6KM.
Start Date UTC
12/30/2020 16:00
Conditions
RADAR CONTROL AND ADS-B MERGING OPERATION IMPLEMENTED WITHIN
URUMQI APPROACH CONTROL AREA:
1. DURING RADAR CONTROL AND ADS-B MERGING OPERATION, RADAR CONTROL
SHALL IMPLEMENT WITHIN URUMQI APPROACH CONTROL AREA, THE MINIMUM
HORIZONTAL RADAR SEPARATION IS 5.6KM.
2. IF RADAR CONTROL SERVICE FAILURE, ADS-B PROCEDURE SHALL
IMPLEMENT WITHIN URUMQI APPROACH CONTROL AREA, THE MINIMUM
HORIZONTAL SEPARATION OF AIRCRAFT ( CONTACTED WITH ADS-B) IS 10KM.
FLW PROCEDURES DO NOT USE: RADAR CONTROL WITHIN URUMQI APP HAS
BEEN IMPLEMENTED. THE MINIMUM HORIZONTAL RADAR SEPARATION 6KM.
W0773/24
08/31/2024 16:00
PERM
REF AIP ZWWW AD2.11 METEOROLOGICAL INFORMATION PROVIDED &
METEOROLOGICAL OBSERVATIONS AND REPORTS:
PERIODS OF VALIDITY CHANGED FROM 24H TO 9H,30H;
INTERVAL OF ISSUANCE CHANGED FROM 6H TO 3H(HO),6H.
Start Date UTC
08/31/2024 16:00
Conditions
REF AIP ZWWW AD2.11 METEOROLOGICAL INFORMATION PROVIDED &
METEOROLOGICAL OBSERVATIONS AND REPORTS:
PERIODS OF VALIDITY CHANGED FROM 24H TO 9H,30H;
INTERVAL OF ISSUANCE CHANGED FROM 6H TO 3H(HO),6H.