NOTAMs for ZSSS/Shanghai/Hongqiao International

Shanghai, 31 CHINA / ICAO - ZSSS, IATA - SHA

NOTAMs are provided by the FAA. International NOTAM list may be incomplete. We are not responsible for NOTAM content. If no results display, there are no active NOTAMs at this location or the FAA service may be temporarily down - please check this FAA link

Order by
Count: 15
 
Number
Start Date UTC
End Date UTC
Conditions
  map
F8467/24
12/23/2024 10:58
06/30/2025 15:59
LIUZAO VOR/DME 'PDL' 109.4MHZ/CH31X U/S BTN RADIAL 209DEG-213DEG CLOCKWISE.
Number
F8467/24
Start Date UTC
12/23/2024 10:58
End Date UTC
06/30/2025 15:59
Conditions
LIUZAO VOR/DME 'PDL' 109.4MHZ/CH31X U/S BTN RADIAL 209DEG-213DEG CLOCKWISE.
  map
F7427/24
11/11/2024 01:00
04/10/2025 15:59
IMPLEMENT THE LID(LANDING INFORMATON DELIVER) OPERATION TRIAL.THE BASIC LID PROCEDURE AS FOLLOW: 1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO ARRIVAL FLIGHTS TO ZSSS 60 MINUTES BEFORE LANDING; 2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE, APPROACH METHOD, AND LANDING RUNWAY; 3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC; 4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR LID INFORMATION AT LEAST INCLUDING EXPECTED ARRIVAL PROCEDURE, APPROACH METHOD, AND LANDING RUNWAY; 5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT: 6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE INSTRUCTION BY CONTROLLER FOR ANY POSSIBLE CHANGE; 7.IF PILOT DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW THE CURRENT PROCEDURE; 8.FOR BETTER IMPROVE THE LID SERVICE, PLEASE FEEL FREE TO // END PART 01 OF 02 //
Number
F7427/24
Start Date UTC
11/11/2024 01:00
End Date UTC
04/10/2025 15:59
Conditions
IMPLEMENT THE LID(LANDING INFORMATON DELIVER) OPERATION TRIAL.THE BASIC LID PROCEDURE AS FOLLOW: 1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO ARRIVAL FLIGHTS TO ZSSS 60 MINUTES BEFORE LANDING; 2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE, APPROACH METHOD, AND LANDING RUNWAY; 3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC; 4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR LID INFORMATION AT LEAST INCLUDING EXPECTED ARRIVAL PROCEDURE, APPROACH METHOD, AND LANDING RUNWAY; 5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT: 6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE INSTRUCTION BY CONTROLLER FOR ANY POSSIBLE CHANGE; 7.IF PILOT DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW THE CURRENT PROCEDURE; 8.FOR BETTER IMPROVE THE LID SERVICE, PLEASE FEEL FREE TO // END PART 01 OF 02 //
  map
F6282/24
09/21/2024 16:00
02/28/2025 15:59
ADD NEW OBSTACLE WITHIN A CIRCLE WITH A RADIUS OF 15KM CENTERED ON THE CENTER OF RWY18L/36R: OBSTACLE ID/DESIGNATION TYPE POSITION MAG BRG(DEGREE)/DIST(M) ELEVATION(M) MARKING/LIGHTING TYPE AND COLOUR CRANE CRANE 206/2,588 55.0 LGT
Number
F6282/24
Start Date UTC
09/21/2024 16:00
End Date UTC
02/28/2025 15:59
Conditions
ADD NEW OBSTACLE WITHIN A CIRCLE WITH A RADIUS OF 15KM CENTERED ON THE CENTER OF RWY18L/36R: OBSTACLE ID/DESIGNATION TYPE POSITION MAG BRG(DEGREE)/DIST(M) ELEVATION(M) MARKING/LIGHTING TYPE AND COLOUR CRANE CRANE 206/2,588 55.0 LGT
  map
F0439/25
01/31/2025 17:00
02/27/2025 22:00
RWY18R/36L CLSD,ACFT SHALL CROSS RWY18R/36L VIA TWY H4,H7.
Number
F0439/25
Start Date UTC
01/31/2025 17:00
End Date UTC
02/27/2025 22:00
Conditions
RWY18R/36L CLSD,ACFT SHALL CROSS RWY18R/36L VIA TWY H4,H7.
  map
F0441/25
01/31/2025 17:00
02/27/2025 22:00
FLW TWY CLSD: 1. TWY C1,C2,C3,C4,B7,B8. 2. TWY H1,H2,H3,H5,H6 CLSD BTN TWY B AND TWY C. 3. TWY C CLSD BTN TWY H1 AND TWY D9,BTN TWY D10 AND TWY H7.
Number
F0441/25
Start Date UTC
01/31/2025 17:00
End Date UTC
02/27/2025 22:00
Conditions
FLW TWY CLSD: 1. TWY C1,C2,C3,C4,B7,B8. 2. TWY H1,H2,H3,H5,H6 CLSD BTN TWY B AND TWY C. 3. TWY C CLSD BTN TWY H1 AND TWY D9,BTN TWY D10 AND TWY H7.
  map
F0443/25
01/31/2025 17:00
02/27/2025 22:00
RWY18L/36R NOT AVBL FOR LANDING EXCEPT ALTN.
Number
F0443/25
Start Date UTC
01/31/2025 17:00
End Date UTC
02/27/2025 22:00
Conditions
RWY18L/36R NOT AVBL FOR LANDING EXCEPT ALTN.
  map
F0440/25
02/10/2025 17:00
02/19/2025 22:00
RWY18L/36R CLSD,ACFT SHALL CROSS RWY18L/36R VIA TWY H4,H7.
Number
F0440/25
Start Date UTC
02/10/2025 17:00
End Date UTC
02/19/2025 22:00
Conditions
RWY18L/36R CLSD,ACFT SHALL CROSS RWY18L/36R VIA TWY H4,H7.
  map
F0442/25
02/10/2025 17:00
02/19/2025 22:00
FLW TWY CLSD: 1. TWY A1,A2,A3,A4,B1,B2,B3,B4,B5,B6,B7,B8,T1,T6,K1,K2,K4,K5,K6,K7. 2. TWY A,B CLSD BTN TWY H1 AND TWY H4. 3. TWY A,B CLSD BTN TWY H4 AND TWY H7. 4. TWY H2,H3,H5,H6 CLSD BTN RWY18R/36L AND TWY B. 5. TWY H1 BTN TWY A AND RWY18R/36L.
Number
F0442/25
Start Date UTC
02/10/2025 17:00
End Date UTC
02/19/2025 22:00
Conditions
FLW TWY CLSD: 1. TWY A1,A2,A3,A4,B1,B2,B3,B4,B5,B6,B7,B8,T1,T6,K1,K2,K4,K5,K6,K7. 2. TWY A,B CLSD BTN TWY H1 AND TWY H4. 3. TWY A,B CLSD BTN TWY H4 AND TWY H7. 4. TWY H2,H3,H5,H6 CLSD BTN RWY18R/36L AND TWY B. 5. TWY H1 BTN TWY A AND RWY18R/36L.
  map
F0497/25
01/28/2025 16:01
01/31/2025 16:01
F0497/25 NOTAMC F0491/25 Q) ZSHA/QMRXX//M//000/999/ A) ZSSS B) 2501281557 E) SEE NEXT NTM.
Number
F0497/25
Start Date UTC
01/28/2025 16:01
End Date UTC
01/31/2025 16:01
Conditions
F0497/25 NOTAMC F0491/25 Q) ZSHA/QMRXX//M//000/999/ A) ZSSS B) 2501281557 E) SEE NEXT NTM.
  map
F0494/25
01/28/2025 15:51
01/31/2025 15:51
F0494/25 NOTAMC F0485/25 Q) ZSHA/QMRXX//M//000/999/ A) ZSSS B) 2501281548 E) SEE NEXT NTM.
Number
F0494/25
Start Date UTC
01/28/2025 15:51
End Date UTC
01/31/2025 15:51
Conditions
F0494/25 NOTAMC F0485/25 Q) ZSHA/QMRXX//M//000/999/ A) ZSSS B) 2501281548 E) SEE NEXT NTM.
  map
F1089/24
02/29/2024 22:00
PERM
PRKG STAND NR.504,NR.506,NR.508,NR.510 ONLY AVBL FOR ACFT WITH WINGSPAN LESS THAN 65M.
Number
F1089/24
Start Date UTC
02/29/2024 22:00
End Date UTC
PERM
Conditions
PRKG STAND NR.504,NR.506,NR.508,NR.510 ONLY AVBL FOR ACFT WITH WINGSPAN LESS THAN 65M.
  map
F1795/24
03/31/2024 16:00
PERM
RWY18L,RWY36R END SAFETY AREA DIMENSIONS(M) CHANGE TO LENGTH 240M WIDTH 120M.
Number
F1795/24
Start Date UTC
03/31/2024 16:00
End Date UTC
PERM
Conditions
RWY18L,RWY36R END SAFETY AREA DIMENSIONS(M) CHANGE TO LENGTH 240M WIDTH 120M.
  map
F2001/24
04/06/2024 16:00
PERM
RWY18L/36R STRIP DIMENSIONS(M) CHANGED TO:3,320M X 300M.
Number
F2001/24
Start Date UTC
04/06/2024 16:00
End Date UTC
PERM
Conditions
RWY18L/36R STRIP DIMENSIONS(M) CHANGED TO:3,320M X 300M.
  map
F3447/24
06/01/2024 00:00
PERM
REF ZSSS AD2.11, METEOROLOGICAL INFORMATION PROVIDED: 3.PERIODS OF VALIDITY CHANGED FROM 9H,24H TO 9H,30H.
Number
F3447/24
Start Date UTC
06/01/2024 00:00
End Date UTC
PERM
Conditions
REF ZSSS AD2.11, METEOROLOGICAL INFORMATION PROVIDED: 3.PERIODS OF VALIDITY CHANGED FROM 9H,24H TO 9H,30H.
  map
F5195/24
08/09/2024 16:00
PERM
AT THE CORNER SECTION OF FOLLOWING TWYS,THE PILOTS OF B777-300,B777-300ER,A340-600,A350-900,A350-1000 ARE REQUESTED TO USE JUDGEMENTAL OVERSTEERING METHOD AT THE FOLLOWING TWYS: TWY K1 AND TWY L01, TWY K2 AND TWY L01, TWY K4 AND TWY L01, TWY K5 AND TWY L01, TWY K6 AND TWY L01, TWY K7 AND TWY L01, TWY H7 AND TWY L01, TWY K1 AND TWY A, TWY K2 AND TWY A, TWY K4 AND TWY A, TWY K5 AND TWY A, TWY K6 AND TWY A, TWY K7 AND TWY A, TWY H7 AND TWY A.
Number
F5195/24
Start Date UTC
08/09/2024 16:00
End Date UTC
PERM
Conditions
AT THE CORNER SECTION OF FOLLOWING TWYS,THE PILOTS OF B777-300,B777-300ER,A340-600,A350-900,A350-1000 ARE REQUESTED TO USE JUDGEMENTAL OVERSTEERING METHOD AT THE FOLLOWING TWYS: TWY K1 AND TWY L01, TWY K2 AND TWY L01, TWY K4 AND TWY L01, TWY K5 AND TWY L01, TWY K6 AND TWY L01, TWY K7 AND TWY L01, TWY H7 AND TWY L01, TWY K1 AND TWY A, TWY K2 AND TWY A, TWY K4 AND TWY A, TWY K5 AND TWY A, TWY K6 AND TWY A, TWY K7 AND TWY A, TWY H7 AND TWY A.