A3499/24
11/05/2024 17:00
12/03/2024 16:59
APCH LIGHTING SYSTEM PALS CAT 1 RWY 07R SPACING IN CREASED
TO BE 60M DUE TO 1 CIRCUIT U/S
RMK: OPS BUT CTN ADZ DUE TO WIP
Start Date UTC
11/05/2024 17:00
End Date UTC
12/03/2024 16:59
Conditions
APCH LIGHTING SYSTEM PALS CAT 1 RWY 07R SPACING IN CREASED
TO BE 60M DUE TO 1 CIRCUIT U/S
RMK: OPS BUT CTN ADZ DUE TO WIP
A3376/24
11/01/2024 00:00
11/30/2024 23:59
RWY CENTRE LINE LGT ON RWY 07R/25L U/S DUE TO WIP
Start Date UTC
11/01/2024 00:00
End Date UTC
11/30/2024 23:59
Conditions
RWY CENTRE LINE LGT ON RWY 07R/25L U/S DUE TO WIP
A3377/24
11/01/2024 00:00
11/30/2024 23:59
INSET RWY EDGE LGT ON RWY 07R/25L U/S DUE TO WIP
RMK: ELEVATED RWY EDGE LGT AVBL
Start Date UTC
11/01/2024 00:00
End Date UTC
11/30/2024 23:59
Conditions
INSET RWY EDGE LGT ON RWY 07R/25L U/S DUE TO WIP
RMK: ELEVATED RWY EDGE LGT AVBL
A3378/24
11/01/2024 00:00
11/30/2024 23:59
TWY CENTRE LINE LGT ON TWY
(S1, S2, S3, S4, S5, S6, S7, S8 AND S9.) U/S DUE TO WIP
Start Date UTC
11/01/2024 00:00
End Date UTC
11/30/2024 23:59
Conditions
TWY CENTRE LINE LGT ON TWY
(S1, S2, S3, S4, S5, S6, S7, S8 AND S9.) U/S DUE TO WIP
A3379/24
11/01/2024 00:00
11/30/2024 23:59
INSET THR LGT ON RWY 07R/25L U/S DUE TO WIP
RMK: ELEVATED THR LGT AVBL
Start Date UTC
11/01/2024 00:00
End Date UTC
11/30/2024 23:59
Conditions
INSET THR LGT ON RWY 07R/25L U/S DUE TO WIP
RMK: ELEVATED THR LGT AVBL
A3296/24
10/23/2024 01:00
11/30/2024 10:00
STRIP RWY 06/24 WIP PSN AS FLW:
-80M NORTH FM EDGE RWY 24
-75M BEFORE THR RWY 24
-80M NORTH FM EDGE RWY 06
RMK: ALL TFC CTN ADZ
Start Date UTC
10/23/2024 01:00
End Date UTC
11/30/2024 10:00
Conditions
STRIP RWY 06/24 WIP PSN AS FLW:
-80M NORTH FM EDGE RWY 24
-75M BEFORE THR RWY 24
-80M NORTH FM EDGE RWY 06
RMK: ALL TFC CTN ADZ
A3297/24
10/23/2024 01:00
11/30/2024 10:00
TWY WIP PSN AS FLW:
-TWY M1 PSN 20M EAST OF TWY EDGE
-TWY NP3 BTN TWY M1 AND TWY M2 PSN 30M SOUTH OF TWY EDGE
-TWY M8 PSN 200M WEST OF TWY EDGE
RMK: ALL TFC CTN ADZ
Start Date UTC
10/23/2024 01:00
End Date UTC
11/30/2024 10:00
Conditions
TWY WIP PSN AS FLW:
-TWY M1 PSN 20M EAST OF TWY EDGE
-TWY NP3 BTN TWY M1 AND TWY M2 PSN 30M SOUTH OF TWY EDGE
-TWY M8 PSN 200M WEST OF TWY EDGE
RMK: ALL TFC CTN ADZ
A3298/24
10/23/2024 01:00
11/30/2024 10:00
STRIP RWY 07L/25R WIP PSN 150M NORTH OF RWY 07L
RMK: ALL TFC CTN ADZ
Start Date UTC
10/23/2024 01:00
End Date UTC
11/30/2024 10:00
Conditions
STRIP RWY 07L/25R WIP PSN 150M NORTH OF RWY 07L
RMK: ALL TFC CTN ADZ
A3405/24
10/31/2024 01:00
11/17/2024 11:00
TWY SP1 (TWY SHOULDER) WIP PSN BTN TWY WC1 AND TWY SC5
RMK:ALL TFC CTN ADZ
Start Date UTC
10/31/2024 01:00
End Date UTC
11/17/2024 11:00
Conditions
TWY SP1 (TWY SHOULDER) WIP PSN BTN TWY WC1 AND TWY SC5
RMK:ALL TFC CTN ADZ
A3278/24
10/22/2024 15:00
11/10/2024 23:00
RWY 07R/25L CLSD DUE TO OVERLAY WIP
Start Date UTC
10/22/2024 15:00
End Date UTC
11/10/2024 23:00
Conditions
RWY 07R/25L CLSD DUE TO OVERLAY WIP
A3277/24
11/06/2024 22:01
11/10/2024 22:00
TWY NP1 BTN INTERSECTION TWY NC3 UNTIL TWY NC4 CLSD DUE TO WIP
RMK : TWY NC3 AND TWY NC4 OPEN
Start Date UTC
11/06/2024 22:01
End Date UTC
11/10/2024 22:00
Conditions
TWY NP1 BTN INTERSECTION TWY NC3 UNTIL TWY NC4 CLSD DUE TO WIP
RMK : TWY NC3 AND TWY NC4 OPEN
A3498/24
11/05/2024 16:00
11/10/2024 22:00
TWY EC1 BTN TWY S1 UNTIL TWY SPE CLSD DUE TO WIP
Start Date UTC
11/05/2024 16:00
End Date UTC
11/10/2024 22:00
Conditions
TWY EC1 BTN TWY S1 UNTIL TWY SPE CLSD DUE TO WIP
A3509/24
11/06/2024 23:00
11/08/2024 23:00
TWY S2 CLSD DUE TO WIP
Start Date UTC
11/06/2024 23:00
End Date UTC
11/08/2024 23:00
Conditions
TWY S2 CLSD DUE TO WIP
A3094/24
10/03/2024 03:20
PERM
AD DATA OF SOEKARNO HATTA INTL AP CHANGES AS FLW:
FLGHT PROCEDURE
-3.C.1 SPEED RESTRICTION SHALL BE AFTER IAF PILOT
ARE REQUESTED TO ADJUST AIRCRAFT SPEED TO 180 KTS
BY 8NM FROM TOUCHDOWN AND THE REAFTER 150 KTS BY
4NM FROM TOUCHDOWN
REF AIRAC AIP AMDT 140 DATED 25 JAN 2024
SUBSECTION WIII AD 2.22
INSTRUMENT FLIGHT PROCEDURE
-VISIBILITY LNAV WITH ALS SHALL BE READ 1400M
-VISIBILITY LNAV WITHOUT ALS SHALL BE READ 2300M
REF AIRAC AIP AMDT 151 DATED 03 OCT 2024
SUBSECTION WIII AD 2.24-11J1
Start Date UTC
10/03/2024 03:20
Conditions
AD DATA OF SOEKARNO HATTA INTL AP CHANGES AS FLW:
FLGHT PROCEDURE
-3.C.1 SPEED RESTRICTION SHALL BE AFTER IAF PILOT
ARE REQUESTED TO ADJUST AIRCRAFT SPEED TO 180 KTS
BY 8NM FROM TOUCHDOWN AND THE REAFTER 150 KTS BY
4NM FROM TOUCHDOWN
REF AIRAC AIP AMDT 140 DATED 25 JAN 2024
SUBSECTION WIII AD 2.22
INSTRUMENT FLIGHT PROCEDURE
-VISIBILITY LNAV WITH ALS SHALL BE READ 1400M
-VISIBILITY LNAV WITHOUT ALS SHALL BE READ 2300M
REF AIRAC AIP AMDT 151 DATED 03 OCT 2024
SUBSECTION WIII AD 2.24-11J1