A4057/24
01/23/2025 00:00
02/05/2025 23:59
TRIGGER NOTAM - PERM AIRAC AIP AMDT 01/25 WEF 23 JAN 2025
AD 2-VVDN-1 ADJUSTMENT OF FUELLING FACILITIES AND TABLE OF
FRICTION COEFFICIENTS.
Start Date UTC
01/23/2025 00:00
End Date UTC
02/05/2025 23:59
Conditions
TRIGGER NOTAM - PERM AIRAC AIP AMDT 01/25 WEF 23 JAN 2025
AD 2-VVDN-1 ADJUSTMENT OF FUELLING FACILITIES AND TABLE OF
FRICTION COEFFICIENTS.
A3879/24
11/30/2024 06:11
12/31/2024 12:00
DOPPLER WX RADAR SYSTEM (METEOR 60DX10-S) U/S FOR REPAIR
RMK: LOW-LEVEL WS ALERT SYSTEM (LLWAS) NML OPS.
Start Date UTC
11/30/2024 06:11
End Date UTC
12/31/2024 12:00
Conditions
DOPPLER WX RADAR SYSTEM (METEOR 60DX10-S) U/S FOR REPAIR
RMK: LOW-LEVEL WS ALERT SYSTEM (LLWAS) NML OPS.
V0812/24
11/26/2024 23:34
12/28/2024 10:00
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS W RWY 35R
Start Date UTC
11/26/2024 23:34
End Date UTC
12/28/2024 10:00
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS W RWY 35R
V0813/24
11/26/2024 23:36
12/28/2024 10:00
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED VOR X RWY 35R
Start Date UTC
11/26/2024 23:36
End Date UTC
12/28/2024 10:00
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED VOR X RWY 35R
A4018/24
12/12/2024 10:30
12/28/2024 10:00
REF AIP SUP 34/24 WEF 05 OCT 2024 ITEM 2.2, ITEM 2.3 AND
LAYOUT OF CONSTRUCTION AREA
THE AREAS WILL RESUME NML OPS FM 1030 ON 12 DEC 2024, DETAIL AS FLW:
- RWY 35R/17L
- TAXIWAYS E2, E3, E4
- ILS OF RWY 35R, APP LGT SYSTEM, PAPI LGT, RWY 35R/17L LGT.
Start Date UTC
12/12/2024 10:30
End Date UTC
12/28/2024 10:00
Conditions
REF AIP SUP 34/24 WEF 05 OCT 2024 ITEM 2.2, ITEM 2.3 AND
LAYOUT OF CONSTRUCTION AREA
THE AREAS WILL RESUME NML OPS FM 1030 ON 12 DEC 2024, DETAIL AS FLW:
- RWY 35R/17L
- TAXIWAYS E2, E3, E4
- ILS OF RWY 35R, APP LGT SYSTEM, PAPI LGT, RWY 35R/17L LGT.
A1161/24
06/03/2024 04:30
PERM
PAX BOARDING BRIDGE AT ACFT STAND 27 RESUMED NML OPS
REF AIP VIET NAM PAGE AD 2-VVDN-4-1 DATED 30 APR 2024.
Start Date UTC
06/03/2024 04:30
Conditions
PAX BOARDING BRIDGE AT ACFT STAND 27 RESUMED NML OPS
REF AIP VIET NAM PAGE AD 2-VVDN-4-1 DATED 30 APR 2024.
A2932/24
10/09/2024 08:55
PERM
REVISION OF LIMITATIONS, NOTES AT APN, DETAIL AS FLW:
ACFT IS NOT ALLOWED TO OPERATE ON TXL D BEHIND OF STAND 30/31
AMEND TO READ: WHEN THERE IS ACFT CODE D/E OPERATING AT
STAND 30/31: ACFT IS NOT ALLOWED TO OPERATE ON TXL D BEHIND
OF STAND 30/31
REF AIP VIET NAM PAGE AD 2-VVDN-1-24 ITEM 4 DATED 03 OCT 2024.
Start Date UTC
10/09/2024 08:55
Conditions
REVISION OF LIMITATIONS, NOTES AT APN, DETAIL AS FLW:
ACFT IS NOT ALLOWED TO OPERATE ON TXL D BEHIND OF STAND 30/31
AMEND TO READ: WHEN THERE IS ACFT CODE D/E OPERATING AT
STAND 30/31: ACFT IS NOT ALLOWED TO OPERATE ON TXL D BEHIND
OF STAND 30/31
REF AIP VIET NAM PAGE AD 2-VVDN-1-24 ITEM 4 DATED 03 OCT 2024.
A4027/24
12/31/2024 17:00
PERM
NEW D-ATIS WILL BE OPR WITH CHARACTERISTICS AS FLW:
- CALL SIGN: DA NANG
- HOURS OF OPR: H24
- FREQ: 128.525MHZ
- PWR: 50W.
Start Date UTC
12/31/2024 17:00
Conditions
NEW D-ATIS WILL BE OPR WITH CHARACTERISTICS AS FLW:
- CALL SIGN: DA NANG
- HOURS OF OPR: H24
- FREQ: 128.525MHZ
- PWR: 50W.
A4140/24
12/24/2024 17:00
PERM
AUTOMATIC WEATHER OBSERVING SYSTEM MIDAS 600 CMPL WITHDRAW
REF AIP VIET NAM PAGES GEN 3.5-12, GEN 3.5-13 DATED 05 SEP 2024.
Start Date UTC
12/24/2024 17:00
Conditions
AUTOMATIC WEATHER OBSERVING SYSTEM MIDAS 600 CMPL WITHDRAW
REF AIP VIET NAM PAGES GEN 3.5-12, GEN 3.5-13 DATED 05 SEP 2024.
A4141/24
12/24/2024 17:00
PERM
MANUAL EQUIPMENT CMPL WITHDRAW
REF AIP VIET NAM PAGES GEN 3.5-12, GEN 3.5-13 DATED 05 SEP 2024.
Start Date UTC
12/24/2024 17:00
Conditions
MANUAL EQUIPMENT CMPL WITHDRAW
REF AIP VIET NAM PAGES GEN 3.5-12, GEN 3.5-13 DATED 05 SEP 2024.