A0434/24
11/11/2024 11:55
02/08/2025 23:59
SPORADIC LASER ILLUMINATION MAY TAKE PLACE FROM UNKNOWN SOURCES
OF NEARBY POPULATED AREA OF THE AIRFIELD. ALL PILOTS ARE
REQUESTED TO EXERCISE CAUTION DURING THE DIFFERENT APPROACH
PHASES AND INITIAL CLIMBING PHASE WITHIN 12NM DAC VOR
Start Date UTC
11/11/2024 11:55
End Date UTC
02/08/2025 23:59
Conditions
SPORADIC LASER ILLUMINATION MAY TAKE PLACE FROM UNKNOWN SOURCES
OF NEARBY POPULATED AREA OF THE AIRFIELD. ALL PILOTS ARE
REQUESTED TO EXERCISE CAUTION DURING THE DIFFERENT APPROACH
PHASES AND INITIAL CLIMBING PHASE WITHIN 12NM DAC VOR
A0006/25
01/08/2025 06:00
01/12/2025 11:00
PORTION OF TWY 'S' IN BTN 'S3' AND 'S1' INTERSECTION SHALL REMAIN
CLSD DUE TO LINE MARKING WORKS ON THE TWY. ALL ARR ACFT USING
RWY-14 SHALL VACATE THE RWY VIA TWY 'C' OR TWY 'S1' OR AFTER
LANDING PROCEED END OF THE RWY AND MAKE 180 DEG TURN FOR BACK
TRACK TO EXIT RWY VIA TWY 'C'. ALL DEPARTING ACFT USING RYW-32
WILL ENTER RWY VIA TWY 'C' AND PROCEED BEGINNING OF THE RWY-32
TO MAKE 180 DEG TURN FOR LINE-UP
Start Date UTC
01/08/2025 06:00
End Date UTC
01/12/2025 11:00
Conditions
PORTION OF TWY 'S' IN BTN 'S3' AND 'S1' INTERSECTION SHALL REMAIN
CLSD DUE TO LINE MARKING WORKS ON THE TWY. ALL ARR ACFT USING
RWY-14 SHALL VACATE THE RWY VIA TWY 'C' OR TWY 'S1' OR AFTER
LANDING PROCEED END OF THE RWY AND MAKE 180 DEG TURN FOR BACK
TRACK TO EXIT RWY VIA TWY 'C'. ALL DEPARTING ACFT USING RYW-32
WILL ENTER RWY VIA TWY 'C' AND PROCEED BEGINNING OF THE RWY-32
TO MAKE 180 DEG TURN FOR LINE-UP
A0122/22
06/02/2022 08:00
PERM
BAY-1 WILL NOT BE AVAILABLE DUE TO EXTENSION OF 3RD TERMINAL
WORK WILL BE IN PROGRESS
Start Date UTC
06/02/2022 08:00
Conditions
BAY-1 WILL NOT BE AVAILABLE DUE TO EXTENSION OF 3RD TERMINAL
WORK WILL BE IN PROGRESS
A0017/23
01/23/2023 09:55
PERM
THE CERTIFICATION STATUS OF VGHS HAS BEEN RENEWED ON
20/10/2022,VALIDITY FROM: 27/10/2022 TO 26/10/24,PLEASE MAKE HAND
AMENDMENT IN AIP BANGLADESH PAGE AD 1.4-1, SUBSECTION AD 1.5
Start Date UTC
01/23/2023 09:55
Conditions
THE CERTIFICATION STATUS OF VGHS HAS BEEN RENEWED ON
20/10/2022,VALIDITY FROM: 27/10/2022 TO 26/10/24,PLEASE MAKE HAND
AMENDMENT IN AIP BANGLADESH PAGE AD 1.4-1, SUBSECTION AD 1.5
A0134/23
04/09/2023 08:00
PERM
BAY-2, BAY-2A AND BAY-3 WILL NOT BE AVAILABLE DUE TO EXTENSION OF
THIRD TERMINAL WORK
Start Date UTC
04/09/2023 08:00
Conditions
BAY-2, BAY-2A AND BAY-3 WILL NOT BE AVAILABLE DUE TO EXTENSION OF
THIRD TERMINAL WORK
A0006/24
01/10/2024 10:25
PERM
DHAKA APPROACH(RADAR)FREQUENCY PRI 121.3 MHZ AND SRY 120.375 MHZ
WILL BE AVAILABLE FOR 24 HOUR BASIS. PLEASE MAKE HAND CORRECTION
AIP BANGLADESH PAGE VGHS AD 2-8, ROW NO.7(SEVEN) AND COLUMN 4(FOUR
Start Date UTC
01/10/2024 10:25
Conditions
DHAKA APPROACH(RADAR)FREQUENCY PRI 121.3 MHZ AND SRY 120.375 MHZ
WILL BE AVAILABLE FOR 24 HOUR BASIS. PLEASE MAKE HAND CORRECTION
AIP BANGLADESH PAGE VGHS AD 2-8, ROW NO.7(SEVEN) AND COLUMN 4(FOUR
A0244/24
06/19/2024 10:10
PERM
SOME PARKING STANDS HAS BEEN ESTABLISHED AT CARGO APRON AND NORTH
OF FIRE STATION. PARKING STANDS 'D-13,D-12' ARE LOCATED AT THE
CARGO APRON ON THE LEFT SIDE OF ECHO TAXIWAY (AFTER ENTERING VIA
TAXIWAY 'E') AND PARKING STANDS 'D-14, D-15, D-16, D-17, D-18' ARE
LOCATED RIGHT SIDE OF THE ECHO TAXIWAY AT THE APRON AREA OF NORTH
OF FIRE STATION. MARKINGS ARE AVAILABLE. CHART WILL BE PUBLISHED BY
AIP SUPPLEMENT
Start Date UTC
06/19/2024 10:10
Conditions
SOME PARKING STANDS HAS BEEN ESTABLISHED AT CARGO APRON AND NORTH
OF FIRE STATION. PARKING STANDS 'D-13,D-12' ARE LOCATED AT THE
CARGO APRON ON THE LEFT SIDE OF ECHO TAXIWAY (AFTER ENTERING VIA
TAXIWAY 'E') AND PARKING STANDS 'D-14, D-15, D-16, D-17, D-18' ARE
LOCATED RIGHT SIDE OF THE ECHO TAXIWAY AT THE APRON AREA OF NORTH
OF FIRE STATION. MARKINGS ARE AVAILABLE. CHART WILL BE PUBLISHED BY
AIP SUPPLEMENT
A0437/24
11/17/2024 05:00
PERM
NDB RREQ 298 KHZ INDENT 'DCN' TRANSMISSION U/S DUE ANTENNA
UNAVAILABILITY
Start Date UTC
11/17/2024 05:00
Conditions
NDB RREQ 298 KHZ INDENT 'DCN' TRANSMISSION U/S DUE ANTENNA
UNAVAILABILITY
A0438/24
11/17/2024 05:00
PERM
HF/RT (LONG RANGE RT) TRANSMISSION UNSERVICEABLE DUE ANTENNA
DISMANTLE
Start Date UTC
11/17/2024 05:00
Conditions
HF/RT (LONG RANGE RT) TRANSMISSION UNSERVICEABLE DUE ANTENNA
DISMANTLE