A0091/24
09/01/2024 17:00
11/30/2024 16:59
ACFT STAND NR 209L 209R 210L 210R 211L 211R 212L 212R CLSD DUE TO
WIP
Start Date UTC
09/01/2024 17:00
End Date UTC
11/30/2024 16:59
Conditions
ACFT STAND NR 209L 209R 210L 210R 211L 211R 212L 212R CLSD DUE TO
WIP
A0082/23
10/16/2023 00:01
PERM
REF AIRAC AIP SUP A5-A6-A7-A8/23 DATED 10 AUG 2023
THE EFFECTIVE DATE WILL REMAIN FM 05 OCT 2023 AT 0001 UTC
EXCEPT AIRAC AIP SUP A9/23 DATED 10 AUG 2023 EFFECTIVE DATE
WILL BE CHANGED TO 16 OCT 2023 AT 0001 UTC
RMK:-SIEM REAP INTERNATIONAL AIRPORT (VDSR) STILL OPEN UNTIL 15 OCT 2023
AT 2000 UTC
-ALL AIRCRAFT INTENDING TO LAND AND DEPART FM VDSR WILL BE
PROVIDED WITH RADAR VECTOR SERVICE BY ATC FOR ROUTING TO STANDARD
INSTRUMENT ARRIVAL (STAR) AND INSTRUMENT APPROACH PROCEDURE (IAP) AND
FOR CONNECTING FM STANDARD INSTRUMENT DEPARTURE (SID) TO THE NEXT FLIGHT
PLANNED ROUTE.
Start Date UTC
10/16/2023 00:01
Conditions
REF AIRAC AIP SUP A5-A6-A7-A8/23 DATED 10 AUG 2023
THE EFFECTIVE DATE WILL REMAIN FM 05 OCT 2023 AT 0001 UTC
EXCEPT AIRAC AIP SUP A9/23 DATED 10 AUG 2023 EFFECTIVE DATE
WILL BE CHANGED TO 16 OCT 2023 AT 0001 UTC
RMK:-SIEM REAP INTERNATIONAL AIRPORT (VDSR) STILL OPEN UNTIL 15 OCT 2023
AT 2000 UTC
-ALL AIRCRAFT INTENDING TO LAND AND DEPART FM VDSR WILL BE
PROVIDED WITH RADAR VECTOR SERVICE BY ATC FOR ROUTING TO STANDARD
INSTRUMENT ARRIVAL (STAR) AND INSTRUMENT APPROACH PROCEDURE (IAP) AND
FOR CONNECTING FM STANDARD INSTRUMENT DEPARTURE (SID) TO THE NEXT FLIGHT
PLANNED ROUTE.