A0193/25
02/11/2025 11:30
05/05/2025 22:00
SW OF THR RWY 11 OUTSIDE OF PERIMETER FENCE BELOW APCH SFC MEN
AND EQPT OPR.
PILOTS ARE REMINDED TO USE LEAD LINE ON THR RWY 11.
Start Date UTC
02/11/2025 11:30
End Date UTC
05/05/2025 22:00
Conditions
SW OF THR RWY 11 OUTSIDE OF PERIMETER FENCE BELOW APCH SFC MEN
AND EQPT OPR.
PILOTS ARE REMINDED TO USE LEAD LINE ON THR RWY 11.
A0139/25
01/31/2025 21:41
03/31/2025 23:59
NORTHERN SHOULDER RWY 11/29 UNPAVED IN THE VCY OF THE NEW
TERMINAL BLDG CONSTRUCTION SITE DUE WIP. CTN ADZ.
Start Date UTC
01/31/2025 21:41
End Date UTC
03/31/2025 23:59
Conditions
NORTHERN SHOULDER RWY 11/29 UNPAVED IN THE VCY OF THE NEW
TERMINAL BLDG CONSTRUCTION SITE DUE WIP. CTN ADZ.
A2226/24
12/19/2024 11:00
02/28/2025 23:00
TOWER CRANES, MOBILE CRANES AND CONCRETE PUMP BOOM IN OPERATION
EAST OF ATC TOWER, MAXIMUM HEIGHT 28M.
Start Date UTC
12/19/2024 11:00
End Date UTC
02/28/2025 23:00
Conditions
TOWER CRANES, MOBILE CRANES AND CONCRETE PUMP BOOM IN OPERATION
EAST OF ATC TOWER, MAXIMUM HEIGHT 28M.
A2134/24
12/04/2024 01:00
02/25/2025 11:00
NEW TERMINAL AIRFIELD ELECTRICAL WORKS, TAXIWAY WORKS AND
LANDSCAPING IN PROGRESS.
MEN AND EQPT OPERATING NORTH OF RWY 11/29 ON A PULLBACK BASIS.
Start Date UTC
12/04/2024 01:00
End Date UTC
02/25/2025 11:00
Conditions
NEW TERMINAL AIRFIELD ELECTRICAL WORKS, TAXIWAY WORKS AND
LANDSCAPING IN PROGRESS.
MEN AND EQPT OPERATING NORTH OF RWY 11/29 ON A PULLBACK BASIS.
V0292/24
12/02/2024 13:54
02/19/2025 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE AMENDMENT RNAV (GNSS) RWY 29. PROCEDURE RENAMED RNP RWY 29. REST OF PROCEDURE UNCHANGED.
Start Date UTC
12/02/2024 13:54
End Date UTC
02/19/2025 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE AMENDMENT RNAV (GNSS) RWY 29. PROCEDURE RENAMED RNP RWY 29. REST OF PROCEDURE UNCHANGED.