A2134/24
12/04/2024 01:00
02/25/2025 11:00
NEW TERMINAL AIRFIELD ELECTRICAL WORKS, TAXIWAY WORKS AND
LANDSCAPING IN PROGRESS.
MEN AND EQPT OPERATING NORTH OF RWY 11/29 ON A PULLBACK BASIS.
Start Date UTC
12/04/2024 01:00
End Date UTC
02/25/2025 11:00
Conditions
NEW TERMINAL AIRFIELD ELECTRICAL WORKS, TAXIWAY WORKS AND
LANDSCAPING IN PROGRESS.
MEN AND EQPT OPERATING NORTH OF RWY 11/29 ON A PULLBACK BASIS.
V0292/24
12/02/2024 13:54
02/19/2025 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE AMENDMENT RNAV (GNSS) RWY 29. PROCEDURE RENAMED RNP RWY 29. REST OF PROCEDURE UNCHANGED.
Start Date UTC
12/02/2024 13:54
End Date UTC
02/19/2025 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE AMENDMENT RNAV (GNSS) RWY 29. PROCEDURE RENAMED RNP RWY 29. REST OF PROCEDURE UNCHANGED.
A2098/24
11/27/2024 19:58
02/11/2025 00:05
MEN AND EQPT OPR SW OF RWY 11 THR OUTSIDE OF PERIMETER FENCE
BELOW APCH SFC.
PILOTS ARE REMINDED TO USE LEAD LINE ON RWY 11 THR.
Start Date UTC
11/27/2024 19:58
End Date UTC
02/11/2025 00:05
Conditions
MEN AND EQPT OPR SW OF RWY 11 THR OUTSIDE OF PERIMETER FENCE
BELOW APCH SFC.
PILOTS ARE REMINDED TO USE LEAD LINE ON RWY 11 THR.
A2133/24
12/03/2024 21:00
01/31/2025 02:00
NORTHERN RWY 11/29 SHOULDER UNPAVED IN THE VCY OF NEW TERMINAL.
CONSTRUCTION WIP.
Start Date UTC
12/03/2024 21:00
End Date UTC
01/31/2025 02:00
Conditions
NORTHERN RWY 11/29 SHOULDER UNPAVED IN THE VCY OF NEW TERMINAL.
CONSTRUCTION WIP.
A1803/24
10/01/2024 16:00
12/18/2024 23:00
TOWER CRANES, MOBILE CRANES AND CONCRETE PUMP BOOM IN OPERATION
EAST OF ATC TOWER. MAXIMUM HGT 28 METERS
Start Date UTC
10/01/2024 16:00
End Date UTC
12/18/2024 23:00
Conditions
TOWER CRANES, MOBILE CRANES AND CONCRETE PUMP BOOM IN OPERATION
EAST OF ATC TOWER. MAXIMUM HGT 28 METERS