A3746/24
12/06/2024 15:00
03/07/2025 02:59
PRKG 8, PRKG 9 AND PRKG 10 WO LGT, CTN DURING NGT SKED
Start Date UTC
12/06/2024 15:00
End Date UTC
03/07/2025 02:59
Conditions
PRKG 8, PRKG 9 AND PRKG 10 WO LGT, CTN DURING NGT SKED
W2918/24
11/16/2024 09:00
02/17/2025 01:00
CAPTIVE BALLOON WILL TAKE PLACE 4NM SW FM AP, HUALPEN SECT
ZONE ...D... RDO 01NM WI: 364658S / 0730855W
Start Date UTC
11/16/2024 09:00
End Date UTC
02/17/2025 01:00
Conditions
CAPTIVE BALLOON WILL TAKE PLACE 4NM SW FM AP, HUALPEN SECT
ZONE ...D... RDO 01NM WI: 364658S / 0730855W
A0058/25
01/06/2025 19:59
01/31/2025 20:30
SBAR TWY GOLF WO LGT, CTN
Start Date UTC
01/06/2025 19:59
End Date UTC
01/31/2025 20:30
Conditions
SBAR TWY GOLF WO LGT, CTN
A4660/22
12/14/2022 18:51
PERM
NEW TWY INDIA AVBL CAPACITY ACFT 4D, LOC PARALLEL E TWY ALFA AND
N APN PAPA SPECS: SFC ASPH,LEN 90M, WID 23M TWY MARKINGS AND
LIGHTS: SGL TWY, TCLL, INFO SGL WITH LGT
INSTRUCTIONS: CONCEPCION GNDC 121.9MHZ
Start Date UTC
12/14/2022 18:51
Conditions
NEW TWY INDIA AVBL CAPACITY ACFT 4D, LOC PARALLEL E TWY ALFA AND
N APN PAPA SPECS: SFC ASPH,LEN 90M, WID 23M TWY MARKINGS AND
LIGHTS: SGL TWY, TCLL, INFO SGL WITH LGT
INSTRUCTIONS: CONCEPCION GNDC 121.9MHZ