A1395/24
11/06/2024 20:20
02/04/2025 20:20
GROOVING FOR RWY 16R/34L PARTLY ERASED DUE TO CONST
LEN: 20.0M (BTN 16.4M AND 36.4M FM RWY34L THR)
WID: 3.0M (BTN 21.5M AND 24.5M ON THE EAST SIDE OF RCL
Start Date UTC
11/06/2024 20:20
End Date UTC
02/04/2025 20:20
Conditions
GROOVING FOR RWY 16R/34L PARTLY ERASED DUE TO CONST
LEN: 20.0M (BTN 16.4M AND 36.4M FM RWY34L THR)
WID: 3.0M (BTN 21.5M AND 24.5M ON THE EAST SIDE OF RCL
A1360/24
10/31/2024 16:10
01/30/2025 14:00
OBST DAY MARKING FOR POWER LINE TOWER ERASED
PSN : 355353.1N1403111.6E (KATORI-SHI IN CHIBA)
Start Date UTC
10/31/2024 16:10
End Date UTC
01/30/2025 14:00
Conditions
OBST DAY MARKING FOR POWER LINE TOWER ERASED
PSN : 355353.1N1403111.6E (KATORI-SHI IN CHIBA)
A1263/24
10/15/2024 03:59
01/10/2025 08:00
OBST LGT ON POWER LINE TOWER-U/S
PSN : 353945.0N1401048.0E (YOTSUKAIDO-SHI IN CHIBA)
Start Date UTC
10/15/2024 03:59
End Date UTC
01/10/2025 08:00
Conditions
OBST LGT ON POWER LINE TOWER-U/S
PSN : 353945.0N1401048.0E (YOTSUKAIDO-SHI IN CHIBA)
A1264/24
10/15/2024 03:59
01/10/2025 08:00
OBST LGT ON POWER LINE TOWER-U/S
PSN : 354124.0N1401134.0E (YOTSUKAIDO-SHI IN CHIBA)
RMK/OBST LGT IN PLACE OF OBST DAY MARKING FOR POWER LINE TOWER
Start Date UTC
10/15/2024 03:59
End Date UTC
01/10/2025 08:00
Conditions
OBST LGT ON POWER LINE TOWER-U/S
PSN : 354124.0N1401134.0E (YOTSUKAIDO-SHI IN CHIBA)
RMK/OBST LGT IN PLACE OF OBST DAY MARKING FOR POWER LINE TOWER
A1218/24
09/30/2024 00:00
12/25/2024 08:00
OBST LGT ON POWER LINE TOWER-U/S
PSN : 355419.6N1403104.0E (KATORI-SHI IN CHIBA)
Start Date UTC
09/30/2024 00:00
End Date UTC
12/25/2024 08:00
Conditions
OBST LGT ON POWER LINE TOWER-U/S
PSN : 355419.6N1403104.0E (KATORI-SHI IN CHIBA)
A1219/24
09/30/2024 00:00
12/25/2024 08:00
OBST DAY MARKING FOR POWER LINE TOWER ERASED
PSN : 355419.6N1403104.0E (KATORI-SHI IN CHIBA)
Start Date UTC
09/30/2024 00:00
End Date UTC
12/25/2024 08:00
Conditions
OBST DAY MARKING FOR POWER LINE TOWER ERASED
PSN : 355419.6N1403104.0E (KATORI-SHI IN CHIBA)
A1334/24
10/28/2024 06:04
12/14/2024 09:00
SPOT 17-CLSD DUE TO CONST
Start Date UTC
10/28/2024 06:04
End Date UTC
12/14/2024 09:00
Conditions
SPOT 17-CLSD DUE TO CONST
A1105/24
09/19/2024 07:02
12/13/2024 12:33
OBST LGT ON BLDG-U/S
PSN : 354406.0N1402412.0E (SANBU-GUN IN CHIBA)
Start Date UTC
09/19/2024 07:02
End Date UTC
12/13/2024 12:33
Conditions
OBST LGT ON BLDG-U/S
PSN : 354406.0N1402412.0E (SANBU-GUN IN CHIBA)
A1375/24
11/15/2024 09:00
12/12/2024 21:00
SPOT 82-CLSD DUE TO CONST
Start Date UTC
11/15/2024 09:00
End Date UTC
12/12/2024 21:00
Conditions
SPOT 82-CLSD DUE TO CONST
A1327/24
12/10/2024 14:30
12/10/2024 20:00
SPOT 102,100A,100B-CLSD DUE TO CONST
Start Date UTC
12/10/2024 14:30
End Date UTC
12/10/2024 20:00
Conditions
SPOT 102,100A,100B-CLSD DUE TO CONST
A1326/24
12/09/2024 14:30
12/09/2024 20:00
SPOT 902-CLSD DUE TO CONST
Start Date UTC
12/09/2024 14:30
End Date UTC
12/09/2024 20:00
Conditions
SPOT 902-CLSD DUE TO CONST
A1325/24
12/06/2024 14:30
12/06/2024 20:00
SPOT 904-CLSD DUE TO CONST
Start Date UTC
12/06/2024 14:30
End Date UTC
12/06/2024 20:00
Conditions
SPOT 904-CLSD DUE TO CONST
A1392/24
12/02/2024 15:30
12/06/2024 20:00
TWY C(BTN E2 AND P),E3(BTN K AND C),P3(BTN C AND SPOT
100A),E3-GWY-CLSD DUE TO CONST
Start Date UTC
12/02/2024 15:30
End Date UTC
12/06/2024 20:00
Conditions
TWY C(BTN E2 AND P),E3(BTN K AND C),P3(BTN C AND SPOT
100A),E3-GWY-CLSD DUE TO CONST
A1179/24
09/24/2024 23:18
12/06/2024 08:00
OBST LGT ON POWER LINE TOWER-U/S
PSN : 354319.0N1401026.0E (SAKURA-SHI IN CHIBA)
Start Date UTC
09/24/2024 23:18
End Date UTC
12/06/2024 08:00
Conditions
OBST LGT ON POWER LINE TOWER-U/S
PSN : 354319.0N1401026.0E (SAKURA-SHI IN CHIBA)
A1180/24
09/24/2024 23:23
12/06/2024 08:00
OBST LGT ON POWER LINE TOWER-U/S
PSN : 354041.0N1401142.0E (YOTSUKAIDO-SHI IN CHIBA)
Start Date UTC
09/24/2024 23:23
End Date UTC
12/06/2024 08:00
Conditions
OBST LGT ON POWER LINE TOWER-U/S
PSN : 354041.0N1401142.0E (YOTSUKAIDO-SHI IN CHIBA)
A1324/24
12/05/2024 14:30
12/05/2024 20:00
SPOT 709-CLSD DUE TO CONST
Start Date UTC
12/05/2024 14:30
End Date UTC
12/05/2024 20:00
Conditions
SPOT 709-CLSD DUE TO CONST
A1323/24
12/04/2024 14:30
12/04/2024 20:00
SPOT 707,708-CLSD DUE TO CONST
Start Date UTC
12/04/2024 14:30
End Date UTC
12/04/2024 20:00
Conditions
SPOT 707,708-CLSD DUE TO CONST
A1322/24
12/03/2024 14:30
12/03/2024 20:00
SPOT 706-CLSD DUE TO CONST
Start Date UTC
12/03/2024 14:30
End Date UTC
12/03/2024 20:00
Conditions
SPOT 706-CLSD DUE TO CONST
A1321/24
12/02/2024 14:30
12/02/2024 20:00
SPOT 704-CLSD DUE TO CONST
Start Date UTC
12/02/2024 14:30
End Date UTC
12/02/2024 20:00
Conditions
SPOT 704-CLSD DUE TO CONST
A1337/24
11/01/2024 14:10
11/30/2024 20:30
RWY 16L/34R-CLSD DUE TO MAINT
Start Date UTC
11/01/2024 14:10
End Date UTC
11/30/2024 20:30
Conditions
RWY 16L/34R-CLSD DUE TO MAINT
A1338/24
11/01/2024 14:10
11/30/2024 20:30
TWY B,B1,B2,B3,B4,B5,B6,B7,B8,B9,F(BTN F1 AND F3),F(BTN F4 AND F5),
F1,F2,F3,F4,F5,K(BTN B AND E1),C(BTN B AND E1),L-CLSD
DUE TO MAINT
Start Date UTC
11/01/2024 14:10
End Date UTC
11/30/2024 20:30
Conditions
TWY B,B1,B2,B3,B4,B5,B6,B7,B8,B9,F(BTN F1 AND F3),F(BTN F4 AND F5),
F1,F2,F3,F4,F5,K(BTN B AND E1),C(BTN B AND E1),L-CLSD
DUE TO MAINT
A1335/24
10/31/2024 15:10
11/29/2024 20:30
RWY 16R/34L-CLSD DUE TO MAINT
RMK/1.EXC ACFT IN AIC 051/19 ITEM 3
2.EXC EMERG ACFT WITH PRIOR PERMISSION AT LEAST 1HR BFR
Start Date UTC
10/31/2024 15:10
End Date UTC
11/29/2024 20:30
Conditions
RWY 16R/34L-CLSD DUE TO MAINT
RMK/1.EXC ACFT IN AIC 051/19 ITEM 3
2.EXC EMERG ACFT WITH PRIOR PERMISSION AT LEAST 1HR BFR
A1336/24
10/31/2024 15:10
11/29/2024 20:30
TWY A,A1 THRU A10-CLSD DUE TO MAINT
RMK/1.EXC ACFT IN AIC 051/19 ITEM 3
2.EXC EMERG ACFT WITH PRIOR PERMISSION AT LEAST 1HR BFR
Start Date UTC
10/31/2024 15:10
End Date UTC
11/29/2024 20:30
Conditions
TWY A,A1 THRU A10-CLSD DUE TO MAINT
RMK/1.EXC ACFT IN AIC 051/19 ITEM 3
2.EXC EMERG ACFT WITH PRIOR PERMISSION AT LEAST 1HR BFR
A1339/24
10/31/2024 15:10
11/29/2024 20:30
TWY K(BTN E1 AND K1-HOLD),E1,C(BTN E1 AND V1-HOLD)-CLSD DUE TO
MAINT
Start Date UTC
10/31/2024 15:10
End Date UTC
11/29/2024 20:30
Conditions
TWY K(BTN E1 AND K1-HOLD),E1,C(BTN E1 AND V1-HOLD)-CLSD DUE TO
MAINT
A1247/24
10/09/2024 14:10
11/29/2024 20:20
HVY EQPT EXIST ABV APCH SFC FOR RWY 16L AND ABV TRANSITIONAL SFC
FOR RWY 16L/34R
1.PSN: BOUNDED BY FLW POINTS
354826.07N1402233.02E 354825.87N1402234.91E
354824.83N1402235.70E 354825.59N1402237.73E
354823.63N1402239.51E 354820.01N1402238.34E
354819.46N1402237.84E 354819.29N1402236.02E
(62M TO 299M BFR RWY 16L THR AND
41M LEFT TO 103M RIGHT EXTENDED RCL)
(NARITA-SHI IN CHIBA)
2.NUMBER : MAX 10
3.RMK : WX MNM, INSTRUMENT APCH PROC, DEP PROC NO CHANGE
Start Date UTC
10/09/2024 14:10
End Date UTC
11/29/2024 20:20
Conditions
HVY EQPT EXIST ABV APCH SFC FOR RWY 16L AND ABV TRANSITIONAL SFC
FOR RWY 16L/34R
1.PSN: BOUNDED BY FLW POINTS
354826.07N1402233.02E 354825.87N1402234.91E
354824.83N1402235.70E 354825.59N1402237.73E
354823.63N1402239.51E 354820.01N1402238.34E
354819.46N1402237.84E 354819.29N1402236.02E
(62M TO 299M BFR RWY 16L THR AND
41M LEFT TO 103M RIGHT EXTENDED RCL)
(NARITA-SHI IN CHIBA)
2.NUMBER : MAX 10
3.RMK : WX MNM, INSTRUMENT APCH PROC, DEP PROC NO CHANGE
A1315/24
10/28/2024 15:30
11/29/2024 20:00
FLW LGT-PARTLY U/S DUE TO CONST
TWY-CL-LGT FOR TWY K(BTN E2 AND E3),E2(BTN K AND C),E3(BTN K AND C)
INTERMEDIATE-HLDG-PSN-LGT FOR TWY K(BTN E2 AND E3
Start Date UTC
10/28/2024 15:30
End Date UTC
11/29/2024 20:00
Conditions
FLW LGT-PARTLY U/S DUE TO CONST
TWY-CL-LGT FOR TWY K(BTN E2 AND E3),E2(BTN K AND C),E3(BTN K AND C)
INTERMEDIATE-HLDG-PSN-LGT FOR TWY K(BTN E2 AND E3
A1329/24
11/29/2024 14:30
11/29/2024 20:00
SPOT 702-CLSD DUE TO CONST
Start Date UTC
11/29/2024 14:30
End Date UTC
11/29/2024 20:00
Conditions
SPOT 702-CLSD DUE TO CONST
A1333/24
11/18/2024 15:30
11/29/2024 20:00
TWY-CL-LGT FOR N1(BTN SPOT 600M AND SPOT 610A),D3(FM N1 TO SPOT
600M)-PARTLY U/S DUE TO CONST
Start Date UTC
11/18/2024 15:30
End Date UTC
11/29/2024 20:00
Conditions
TWY-CL-LGT FOR N1(BTN SPOT 600M AND SPOT 610A),D3(FM N1 TO SPOT
600M)-PARTLY U/S DUE TO CONST
A1351/24
11/18/2024 15:30
11/29/2024 20:00
TWY N1(FM SPOT 600M TO SPOT 610D),D3(BTN SPOT 600P AND N1)-CLSD DUE
TO CONST
Start Date UTC
11/18/2024 15:30
End Date UTC
11/29/2024 20:00
Conditions
TWY N1(FM SPOT 600M TO SPOT 610D),D3(BTN SPOT 600P AND N1)-CLSD DUE
TO CONST
A1357/24
11/05/2024 15:00
11/29/2024 20:00
HVY EQPT EXIST ABV APCH SFC FOR RWY 16R
1.PSN : BOUNDED BY FLW POINT
354647.13N1402157.47E 354642.71N1402200.66E
354640.04N1402155.10E 354644.46N1402151.91E
(462M TO 620M BFR RWY 16R THR AND
122M LEFT TO 40M RIGHT EXTENDED RCL)
(NARITA-SHI IN CHIBA)
2.NUMBER: MAX 3
3.RMK : (1)WX MNM, INSTRUMENT APCH PROC, DEP PROC NO CHANGE
(2)EXC ACFT IN AIC 051/19 ITEM 3
(3)EXC EMERG ACFT WITH PRIOR PERMISSION AT LEAST 1HR BFR
Start Date UTC
11/05/2024 15:00
End Date UTC
11/29/2024 20:00
Conditions
HVY EQPT EXIST ABV APCH SFC FOR RWY 16R
1.PSN : BOUNDED BY FLW POINT
354647.13N1402157.47E 354642.71N1402200.66E
354640.04N1402155.10E 354644.46N1402151.91E
(462M TO 620M BFR RWY 16R THR AND
122M LEFT TO 40M RIGHT EXTENDED RCL)
(NARITA-SHI IN CHIBA)
2.NUMBER: MAX 3
3.RMK : (1)WX MNM, INSTRUMENT APCH PROC, DEP PROC NO CHANGE
(2)EXC ACFT IN AIC 051/19 ITEM 3
(3)EXC EMERG ACFT WITH PRIOR PERMISSION AT LEAST 1HR BFR
A1365/24
11/05/2024 15:30
11/29/2024 20:00
TWY K(BTN K1-HOLD AND E5),E2,E3(BTN K AND C)-CLSD DUE TO CONST
Start Date UTC
11/05/2024 15:30
End Date UTC
11/29/2024 20:00
Conditions
TWY K(BTN K1-HOLD AND E5),E2,E3(BTN K AND C)-CLSD DUE TO CONST
A1301/24
11/21/2024 15:30
11/21/2024 20:00
SPOT 87-CLSD DUE TO CONST
Start Date UTC
11/21/2024 15:30
End Date UTC
11/21/2024 20:00
Conditions
SPOT 87-CLSD DUE TO CONST
A1182/24
09/30/2024 01:00
11/18/2024 06:00
LOW LVL WIND SHEAR ADVS BY DOPPLER LIDAR NOT PROVIDED
DUE TO CONST
Start Date UTC
09/30/2024 01:00
End Date UTC
11/18/2024 06:00
Conditions
LOW LVL WIND SHEAR ADVS BY DOPPLER LIDAR NOT PROVIDED
DUE TO CONST
A1391/24
11/17/2024 23:00
11/18/2024 03:00
SPOT 87-CLSD DUE TO CONST
Start Date UTC
11/17/2024 23:00
End Date UTC
11/18/2024 03:00
Conditions
SPOT 87-CLSD DUE TO CONST
A1358/24
11/05/2024 14:30
11/15/2024 20:20
HVY EQPT EXIST ABV APCH SFC FOR RWY 16L AND
ABV TRANSITIONAL SFC FOR RWY 16L/34R
1.PSN :BOUNDED BY FLW POINT
354831.00N1402240.00E 354829.00N1402232.00E
354826.00N1402222.00E 354825.00N1402223.00E
354827.00N1402230.00E 354827.00N1402232.00E
354830.00N1402241.00E
(335M TO 380M BFR RWY 16L THR AND
185M LEFT TO 325M RIGHT EXTENDED RCL)
(NARITA-SHI IN CHIBA)
2.NUMBER : 1
3.RMK : WX MNM NO CHANGE
Start Date UTC
11/05/2024 14:30
End Date UTC
11/15/2024 20:20
Conditions
HVY EQPT EXIST ABV APCH SFC FOR RWY 16L AND
ABV TRANSITIONAL SFC FOR RWY 16L/34R
1.PSN :BOUNDED BY FLW POINT
354831.00N1402240.00E 354829.00N1402232.00E
354826.00N1402222.00E 354825.00N1402223.00E
354827.00N1402230.00E 354827.00N1402232.00E
354830.00N1402241.00E
(335M TO 380M BFR RWY 16L THR AND
185M LEFT TO 325M RIGHT EXTENDED RCL)
(NARITA-SHI IN CHIBA)
2.NUMBER : 1
3.RMK : WX MNM NO CHANGE
A1397/24
11/13/2024 15:45
11/15/2024 16:45
NARITA ATIS BCST 128.25MHZ-U/S DUE TO MAINT
RMK/DATA LINK INFO SER AVBL
Start Date UTC
11/13/2024 15:45
End Date UTC
11/15/2024 16:45
Conditions
NARITA ATIS BCST 128.25MHZ-U/S DUE TO MAINT
RMK/DATA LINK INFO SER AVBL
A1373/24
11/05/2024 00:00
11/15/2024 09:00
SPOT 82-CLSD DUE TO CONST
RMK/EXC ACFT WITH PRIOR PERMISSION
Start Date UTC
11/05/2024 00:00
End Date UTC
11/15/2024 09:00
Conditions
SPOT 82-CLSD DUE TO CONST
RMK/EXC ACFT WITH PRIOR PERMISSION
A1359/24
11/11/2024 15:00
11/14/2024 20:00
LOW LVL WIND SHEAR ADVS BY DOPPLER RADAR NOT PROVIDED DUE TO MAINT
Start Date UTC
11/11/2024 15:00
End Date UTC
11/14/2024 20:00
Conditions
LOW LVL WIND SHEAR ADVS BY DOPPLER RADAR NOT PROVIDED DUE TO MAINT
A1386/24
11/06/2024 14:30
11/14/2024 20:00
HVY EQPT EXIST ABV APCH SFC FOR RWY 16L AND
ABV TRANSITIONAL SFC FOR RWY 16L/34R
1.PSN:(1) BOUNDED BY FLW POINT(ABV APCH SFC FOR RWY 16L)
354828.29N1402238.71E 354826.69N1402239.86E
354825.85N1402238.10E 354822.69N1402240.38E
354821.73N1402238.39E 354824.00N1402235.71E
354826.11N1402234.18E
(116M TO 286M BFR RWY 16L THR AND
97M LEFT TO 35M RIGHT EXTENDED RCL)
HGT:181FT AMSL
(2) BOUNDED BY FLW POINT(ABV APCH SFC FOR RWY 16L)
354828.80N1402238.34E 354826.69N1402239.86E
354826.82N1402240.12E 354828.28N1402239.45E
354828.75N1402238.84E 354828.84N1402238.54E
(229M TO 304M BFR RWY 16L THR AND
97M TO 113M LEFT EXTENDED RCL)
HGT:239FT AMSL
(3) BOUNDED BY FLW POINT
(ABV TRANSITIONAL SFC FOR RWY 16L/34R)
354826.82N1402240.12E 354827.19N1402240.89E
354828.28N1402239.45E
(229M TO 277M BFR RWY 16L THR AND
104M TO 127M LEFT EXTENDED RCL)
HGT:239FT AMSL
(4) BOUNDED BY FLW POINT(ABV APCH SFC FOR RWY 16L)
354828.80N1402238.34E 354828.58N1402238.50E
354828.05N1402237.38E 354828.45N1402237.09E
354828.59N1402237.38E
(296M TO 311M BFR RWY 16L THR AND
64M TO 97M LEFT EXTENDED RCL)
HGT:178FT AMSL
(NARITA-SHI IN CHIBA)
2.NUMBER : MAX 3
3.RMK : WX MNM, INSTRUMENT APCH PROC, DEP PROC NO CHANGE
Start Date UTC
11/06/2024 14:30
End Date UTC
11/14/2024 20:00
Conditions
HVY EQPT EXIST ABV APCH SFC FOR RWY 16L AND
ABV TRANSITIONAL SFC FOR RWY 16L/34R
1.PSN:(1) BOUNDED BY FLW POINT(ABV APCH SFC FOR RWY 16L)
354828.29N1402238.71E 354826.69N1402239.86E
354825.85N1402238.10E 354822.69N1402240.38E
354821.73N1402238.39E 354824.00N1402235.71E
354826.11N1402234.18E
(116M TO 286M BFR RWY 16L THR AND
97M LEFT TO 35M RIGHT EXTENDED RCL)
HGT:181FT AMSL
(2) BOUNDED BY FLW POINT(ABV APCH SFC FOR RWY 16L)
354828.80N1402238.34E 354826.69N1402239.86E
354826.82N1402240.12E 354828.28N1402239.45E
354828.75N1402238.84E 354828.84N1402238.54E
(229M TO 304M BFR RWY 16L THR AND
97M TO 113M LEFT EXTENDED RCL)
HGT:239FT AMSL
(3) BOUNDED BY FLW POINT
(ABV TRANSITIONAL SFC FOR RWY 16L/34R)
354826.82N1402240.12E 354827.19N1402240.89E
354828.28N1402239.45E
(229M TO 277M BFR RWY 16L THR AND
104M TO 127M LEFT EXTENDED RCL)
HGT:239FT AMSL
(4) BOUNDED BY FLW POINT(ABV APCH SFC FOR RWY 16L)
354828.80N1402238.34E 354828.58N1402238.50E
354828.05N1402237.38E 354828.45N1402237.09E
354828.59N1402237.38E
(296M TO 311M BFR RWY 16L THR AND
64M TO 97M LEFT EXTENDED RCL)
HGT:178FT AMSL
(NARITA-SHI IN CHIBA)
2.NUMBER : MAX 3
3.RMK : WX MNM, INSTRUMENT APCH PROC, DEP PROC NO CHANGE
A1401/24
11/08/2024 15:30
11/13/2024 20:20
TWY K(BTN E5 AND E6),K(INT OF E5),E5(BTN K AND C)-CLSD DUE TO CONST
Start Date UTC
11/08/2024 15:30
End Date UTC
11/13/2024 20:20
Conditions
TWY K(BTN E5 AND E6),K(INT OF E5),E5(BTN K AND C)-CLSD DUE TO CONST
A1354/24
10/30/2024 15:00
11/13/2024 15:00
TRIGGER NOTAM-PERM AIP AMDT NR14/2024
WEF 31 OCT 2024
REVISION OF INS CHECKPOINTS
Start Date UTC
10/30/2024 15:00
End Date UTC
11/13/2024 15:00
Conditions
TRIGGER NOTAM-PERM AIP AMDT NR14/2024
WEF 31 OCT 2024
REVISION OF INS CHECKPOINTS
A1398/24
11/12/2024 14:00
11/12/2024 20:20
SPOT 63,63R-CLSD DUE TO CONST
Start Date UTC
11/12/2024 14:00
End Date UTC
11/12/2024 20:20
Conditions
SPOT 63,63R-CLSD DUE TO CONST
A1387/24
11/11/2024 14:00
11/11/2024 20:20
SPOT 38,47-CLSD DUE TO CONST
Start Date UTC
11/11/2024 14:00
End Date UTC
11/11/2024 20:20
Conditions
SPOT 38,47-CLSD DUE TO CONST
A1384/24
11/10/2024 14:35
11/10/2024 15:30
DEPARTURE CLEARANCE BY DATA LINK (DCL)-U/S DUE TO MAINT
RMK/USE VOICE COM DRG THIS PERIOD
Start Date UTC
11/10/2024 14:35
End Date UTC
11/10/2024 15:30
Conditions
DEPARTURE CLEARANCE BY DATA LINK (DCL)-U/S DUE TO MAINT
RMK/USE VOICE COM DRG THIS PERIOD
A1400/24
11/07/2024 06:18
11/10/2024 06:18
A1400/24 NOTAMC A1394/24
Q) RJJJ/QMXXX/IV/M/A/000/999/3546N14023E005
A) RJAA B) 2411070618
E) TWY K(BTN E5 AND E6),K(INT OF E5),E5(BTN K AND C)
NEW NOTAM TO FLW
Start Date UTC
11/07/2024 06:18
End Date UTC
11/10/2024 06:18
Conditions
A1400/24 NOTAMC A1394/24
Q) RJJJ/QMXXX/IV/M/A/000/999/3546N14023E005
A) RJAA B) 2411070618
E) TWY K(BTN E5 AND E6),K(INT OF E5),E5(BTN K AND C)
NEW NOTAM TO FLW
A1393/24
11/06/2024 08:05
11/09/2024 08:05
A1393/24 NOTAMC A1363/24
Q) RJJJ/QMXXX/IV/M/A/000/999/3546N14023E005
A) RJAA B) 2411060804
E) TWY K(BTN E5 AND E6),K(INT OF E5),E5(BTN K AND C)
NEW NOTAM TO FLW
Start Date UTC
11/06/2024 08:05
End Date UTC
11/09/2024 08:05
Conditions
A1393/24 NOTAMC A1363/24
Q) RJJJ/QMXXX/IV/M/A/000/999/3546N14023E005
A) RJAA B) 2411060804
E) TWY K(BTN E5 AND E6),K(INT OF E5),E5(BTN K AND C)
NEW NOTAM TO FLW
A1399/24
11/08/2024 15:30
11/08/2024 16:30
SPOT 23-CLSD DUE TO CONST
Start Date UTC
11/08/2024 15:30
End Date UTC
11/08/2024 16:30
Conditions
SPOT 23-CLSD DUE TO CONST
A1383/24
11/08/2024 14:20
11/08/2024 15:30
DEPARTURE CLEARANCE BY DATA LINK (DCL)-U/S DUE TO MAINT
RMK/USE VOICE COM DRG THIS PERIOD
Start Date UTC
11/08/2024 14:20
End Date UTC
11/08/2024 15:30
Conditions
DEPARTURE CLEARANCE BY DATA LINK (DCL)-U/S DUE TO MAINT
RMK/USE VOICE COM DRG THIS PERIOD
A1396/24
11/07/2024 04:10
11/08/2024 08:00
REF AIC 002/22
SEISMIC INTENSITY INFORMATION NOT PROVIDED DUE TO TROUBLE
Start Date UTC
11/07/2024 04:10
End Date UTC
11/08/2024 08:00
Conditions
REF AIC 002/22
SEISMIC INTENSITY INFORMATION NOT PROVIDED DUE TO TROUBLE
A1385/24
11/05/2024 05:38
11/08/2024 05:38
A1385/24 NOTAMC A1345/24
Q) RJJJ/QOBXX/IV/M/A/000/003/3546N14023E005
A) RJAA B) 2411050537
E) HVY EQPT EXIST ABV APCH SFC FOR RWY 16L AND
ABV TRANSITIONAL SFC FOR RWY 16L/34R
NEW NOTAM TO FLW
Start Date UTC
11/05/2024 05:38
End Date UTC
11/08/2024 05:38
Conditions
A1385/24 NOTAMC A1345/24
Q) RJJJ/QOBXX/IV/M/A/000/003/3546N14023E005
A) RJAA B) 2411050537
E) HVY EQPT EXIST ABV APCH SFC FOR RWY 16L AND
ABV TRANSITIONAL SFC FOR RWY 16L/34R
NEW NOTAM TO FLW
A1388/24
11/07/2024 14:00
11/07/2024 20:20
SPOT 38-CLSD DUE TO CONST
Start Date UTC
11/07/2024 14:00
End Date UTC
11/07/2024 20:20
Conditions
SPOT 38-CLSD DUE TO CONST
A1390/24
11/07/2024 14:30
11/07/2024 16:00
SPOT 12-CLSD DUE TO CONST
Start Date UTC
11/07/2024 14:30
End Date UTC
11/07/2024 16:00
Conditions
SPOT 12-CLSD DUE TO CONST
A1382/24
11/07/2024 13:20
11/07/2024 15:30
DEPARTURE CLEARANCE BY DATA LINK (DCL)-U/S DUE TO MAINT
RMK/USE VOICE COM DRG THIS PERIOD
Start Date UTC
11/07/2024 13:20
End Date UTC
11/07/2024 15:30
Conditions
DEPARTURE CLEARANCE BY DATA LINK (DCL)-U/S DUE TO MAINT
RMK/USE VOICE COM DRG THIS PERIOD
A1389/24
11/07/2024 13:00
11/07/2024 14:30
SPOT 11-CLSD DUE TO CONST
Start Date UTC
11/07/2024 13:00
End Date UTC
11/07/2024 14:30
Conditions
SPOT 11-CLSD DUE TO CONST
A1106/24
09/19/2024 07:43
PERM
REF AIP PAGE RJAA AD2-6 (CHANGE TO READ)
RJAA AD 2.8 APRONS, TAXIWAYS AND CHECK LOCATIONS DATA
5.INS CHECKPOINTS
CHANGE TO READ
SPOT NR
101 : 354646.42N 1402322.79E
INSTEAD OF
SPOT NR
101 : 354645.73N 1402321.30E
Start Date UTC
09/19/2024 07:43
Conditions
REF AIP PAGE RJAA AD2-6 (CHANGE TO READ)
RJAA AD 2.8 APRONS, TAXIWAYS AND CHECK LOCATIONS DATA
5.INS CHECKPOINTS
CHANGE TO READ
SPOT NR
101 : 354646.42N 1402322.79E
INSTEAD OF
SPOT NR
101 : 354645.73N 1402321.30E