NOTAMs for OJAQ/Aqaba/King Hussein International

Aqaba, JORDAN / ICAO - OJAQ, IATA - AQJ

NOTAMs are provided by the FAA. International NOTAM list may be incomplete. We are not responsible for NOTAM content. If no results display, there are no active NOTAMs at this location or the FAA service may be temporarily down - please check this FAA link

Order by
Count: 3
 
Number
Start Date UTC
End Date UTC
Conditions
  map
A0291/24
09/01/2024 22:00
12/31/2024 21:00
DUE TO BIRDS MIGRATION SEASON, PILOTS ARE REQ TO PAY ATTN DRG ARR AND DEP PHASES AND REP TO ATC THE DETECTED FLOCKS OF BIRDS TO ALERT OTHER FLIGHTS
Number
A0291/24
Start Date UTC
09/01/2024 22:00
End Date UTC
12/31/2024 21:00
Conditions
DUE TO BIRDS MIGRATION SEASON, PILOTS ARE REQ TO PAY ATTN DRG ARR AND DEP PHASES AND REP TO ATC THE DETECTED FLOCKS OF BIRDS TO ALERT OTHER FLIGHTS
  map
A0425/22
12/01/2022 00:00
PERM
FLW IAC TO BE READ: 1-RNP RWY 01 INSTEAD OF RNAV(GNSS)RWY 01 2-RNP RWY 19 INSTEAD OF RNAV(GNSS)RWY 19 REF AIP:AD 2.24.8-3,AD 2.24.8-5,SUP 01/22 AND SUP 08/18
Number
A0425/22
Start Date UTC
12/01/2022 00:00
End Date UTC
PERM
Conditions
FLW IAC TO BE READ: 1-RNP RWY 01 INSTEAD OF RNAV(GNSS)RWY 01 2-RNP RWY 19 INSTEAD OF RNAV(GNSS)RWY 19 REF AIP:AD 2.24.8-3,AD 2.24.8-5,SUP 01/22 AND SUP 08/18
  map
A0120/24
04/08/2024 11:53
PERM
ALL VFR OPERATIONS WITHIN AQABA CONTROL ZONE (CTR) SHALL ADHERE TO THE FOLLOWING: - TFC OPERATION ALONG V5/V6 VFR CORRIDORS WILL BE CLEARED TO THE ENTRY/EXIT OF CONTROL ZONE BOUNDARY (8NM) FROM AQB/DVOR - SUCCESSIVE VFR /ARRIVALS /DEPARTURES WILL BE SEQUENCED HORIZANTALLY 5 MIUTES SEPARATION - PILOTS ARE REQUIRED TO REPORT OPERATION NORMAL EACH 15 MINUTES WITHIN J WEST TRAINING AREA ON FREQ 119.2MHZ - VFR TFC OPERATING WITHIN J WEST TRAINING AREA SHALL SET TRANSPONDER CODE AND TO PROVIDE ESTIMATION OF REJOINING TIME ON FREQ 119.2MHZ - VFR ARRIVAL AIRCRAFT FROM OJAM SHALL REPORT OVER RAS-ENNAQAB AND TO ASK FOR FURTHER CLEARANCE TO JOIN ARRIVAL VFR CORRIDOR OR TO BE AUTHORIZED TO JOIN J WEST TRAINING AREA FOR DELAY ACTION. - DUE TO NEW PROCEDURE IMPLEMENTATION EXTRA MEASURES MAY BE IMPOSED TO/FROM J WEST TRAINING AREA AND AERODROME TRAFFIC CIRCUIT.
Number
A0120/24
Start Date UTC
04/08/2024 11:53
End Date UTC
PERM
Conditions
ALL VFR OPERATIONS WITHIN AQABA CONTROL ZONE (CTR) SHALL ADHERE TO THE FOLLOWING: - TFC OPERATION ALONG V5/V6 VFR CORRIDORS WILL BE CLEARED TO THE ENTRY/EXIT OF CONTROL ZONE BOUNDARY (8NM) FROM AQB/DVOR - SUCCESSIVE VFR /ARRIVALS /DEPARTURES WILL BE SEQUENCED HORIZANTALLY 5 MIUTES SEPARATION - PILOTS ARE REQUIRED TO REPORT OPERATION NORMAL EACH 15 MINUTES WITHIN J WEST TRAINING AREA ON FREQ 119.2MHZ - VFR TFC OPERATING WITHIN J WEST TRAINING AREA SHALL SET TRANSPONDER CODE AND TO PROVIDE ESTIMATION OF REJOINING TIME ON FREQ 119.2MHZ - VFR ARRIVAL AIRCRAFT FROM OJAM SHALL REPORT OVER RAS-ENNAQAB AND TO ASK FOR FURTHER CLEARANCE TO JOIN ARRIVAL VFR CORRIDOR OR TO BE AUTHORIZED TO JOIN J WEST TRAINING AREA FOR DELAY ACTION. - DUE TO NEW PROCEDURE IMPLEMENTATION EXTRA MEASURES MAY BE IMPOSED TO/FROM J WEST TRAINING AREA AND AERODROME TRAFFIC CIRCUIT.