V0431/24
08/27/2024 12:29
04/17/2025 09:01
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED ILS RWY 26L AMDT 3, MINIMA; S-ILS 26L CAT ABCD 2566-800M 200 (200-800). S-LOC 26L CAT AB 2980-1500M 614 (600-1500M) CAT CD 2980-2100M 614 (600-2100). S-ILS 26L: WHEN ALS INOP INCREASE VIS TO 1200M. S-LOC 26L: WHEN ALS INOP INCREASE CAT CD VIS TO 2400M.
Start Date UTC
08/27/2024 12:29
End Date UTC
04/17/2025 09:01
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED ILS RWY 26L AMDT 3, MINIMA; S-ILS 26L CAT ABCD 2566-800M 200 (200-800). S-LOC 26L CAT AB 2980-1500M 614 (600-1500M) CAT CD 2980-2100M 614 (600-2100). S-ILS 26L: WHEN ALS INOP INCREASE VIS TO 1200M. S-LOC 26L: WHEN ALS INOP INCREASE CAT CD VIS TO 2400M.
A0375/24
10/04/2024 18:20
01/03/2025 16:00
CRANES ARE ERECTED DURING DAYLIGHT WI AREA BOUNDED BY THE FLW
COORD
360032.2574E 314330.0108N
360042.1056E 314331.4677N
360033.9113E 314320.3628N
360044.00889E 314321.8028N
-CRANES WILL BE EQUIPPED WITH OBSTRUCTION LIGHT FLASHING WHITE
DURING DAYLIGHT.
-PILOTS TO FOLLOW ATC INSTRUCTIONS
-CRANES MAX HGT 45 METERS
Start Date UTC
10/04/2024 18:20
End Date UTC
01/03/2025 16:00
Conditions
CRANES ARE ERECTED DURING DAYLIGHT WI AREA BOUNDED BY THE FLW
COORD
360032.2574E 314330.0108N
360042.1056E 314331.4677N
360033.9113E 314320.3628N
360044.00889E 314321.8028N
-CRANES WILL BE EQUIPPED WITH OBSTRUCTION LIGHT FLASHING WHITE
DURING DAYLIGHT.
-PILOTS TO FOLLOW ATC INSTRUCTIONS
-CRANES MAX HGT 45 METERS
V0140/24
03/18/2024 20:14
12/30/2024 23:59
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED RWY 08L/26R KIPAS 6E, 6W.
Start Date UTC
03/18/2024 20:14
End Date UTC
12/30/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED RWY 08L/26R KIPAS 6E, 6W.
A0446/24
11/23/2024 07:16
11/26/2024 07:16
A0446/24 NOTAMC A0443/24
Q) OJAC/QMXXX/IV/BO /A /000/999/3143N03600E005
A) OJAI B) 2411230715
E) NOTAM CANCELLED
Start Date UTC
11/23/2024 07:16
End Date UTC
11/26/2024 07:16
Conditions
A0446/24 NOTAMC A0443/24
Q) OJAC/QMXXX/IV/BO /A /000/999/3143N03600E005
A) OJAI B) 2411230715
E) NOTAM CANCELLED
A0445/24
11/23/2024 07:15
11/26/2024 07:15
A0445/24 NOTAMC A0442/24
Q) OJAC/QMRXX/IV/NBO/A /000/999/3143N03600E005
A) OJAI B) 2411230714
E) NOTAM CANCELLED
Start Date UTC
11/23/2024 07:15
End Date UTC
11/26/2024 07:15
Conditions
A0445/24 NOTAMC A0442/24
Q) OJAC/QMRXX/IV/NBO/A /000/999/3143N03600E005
A) OJAI B) 2411230714
E) NOTAM CANCELLED
A0447/24
11/23/2024 10:00
11/23/2024 16:00
RWY 26L/08R CLSD DUE TO MAINT
Start Date UTC
11/23/2024 10:00
End Date UTC
11/23/2024 16:00
Conditions
RWY 26L/08R CLSD DUE TO MAINT
A0448/24
11/23/2024 10:00
11/23/2024 16:00
TWY B, C AND D CLSD DUE TO MAINT
Start Date UTC
11/23/2024 10:00
End Date UTC
11/23/2024 16:00
Conditions
TWY B, C AND D CLSD DUE TO MAINT
A0423/22
12/01/2022 00:00
PERM
FLW IAC TO BE READ:
1-RNP RWY 26L INSTEAD OF RNAV(GNSS)RWY 26L
2-RNP RWY 08R INSTEAD OF RNAV(GNSS)RWY 08R
REF AIP:AD 2.24.8-8,AD 2.24.8-10,SUP 01/22 AND SUP 06/18
Start Date UTC
12/01/2022 00:00
Conditions
FLW IAC TO BE READ:
1-RNP RWY 26L INSTEAD OF RNAV(GNSS)RWY 26L
2-RNP RWY 08R INSTEAD OF RNAV(GNSS)RWY 08R
REF AIP:AD 2.24.8-8,AD 2.24.8-10,SUP 01/22 AND SUP 06/18
A0030/23
02/09/2023 10:00
PERM
TO REDUCE AIRCRAFT ENGINES EMISSION AT QAIA, THE USAGE OF THE
AIRCRAFT AUXILIARY POWER UNIT (APU) IS RESTRICTED.
ALL AIRCRAFTS PARKED ON ANY PARKING STAND MUST HAVE THEIR APU
SWITCHED OFF, ALL MOVEMENT TYPES CONCERNED, MEANING, BUT NOT LIMITED
TO, COMMERCIAL, CARGO, TECHNICAL, GENERAL AVIATION, ETC.
AT CONTACT AND REMOTE PARKING STAND, APU USAGE IS AUTHORIZED WITHIN
10 MINUTES MAXIMUM AFTER BLOC IN TO ALLOW THE GROUND HANDLER TO
CONNECT THE AIRCRAFT TO THE BRIDGE MOUNTED 400HZ, OR TO THE MOBILE
GPU UNIT, AND IF NEEDED TO THE BRIDGE MOUNTED PCA, OR TO THE MOBILE
ACU UNIT.
APU IS AUTHORIZED 10 MINUTES MAXIMUM PRIOR TO TOBT TO ALLOW THE
GROUND HANDLER TO DISCONNECT 400HZ/PCA/GPU/ACU FROM THE AIRCRAFT.
APU MIGHT BE USED, IN CASE OF VERY HIGH TEMPERATURE REQUESTING
ADDITIONAL POWER, OR IN CASE OF NONE AVAILABLE GPU/ACU UNIT ON
REMOTE STAND, IF SHARED WITH ATC AND AIRPORT GROUND OPERATIONS.
Start Date UTC
02/09/2023 10:00
Conditions
TO REDUCE AIRCRAFT ENGINES EMISSION AT QAIA, THE USAGE OF THE
AIRCRAFT AUXILIARY POWER UNIT (APU) IS RESTRICTED.
ALL AIRCRAFTS PARKED ON ANY PARKING STAND MUST HAVE THEIR APU
SWITCHED OFF, ALL MOVEMENT TYPES CONCERNED, MEANING, BUT NOT LIMITED
TO, COMMERCIAL, CARGO, TECHNICAL, GENERAL AVIATION, ETC.
AT CONTACT AND REMOTE PARKING STAND, APU USAGE IS AUTHORIZED WITHIN
10 MINUTES MAXIMUM AFTER BLOC IN TO ALLOW THE GROUND HANDLER TO
CONNECT THE AIRCRAFT TO THE BRIDGE MOUNTED 400HZ, OR TO THE MOBILE
GPU UNIT, AND IF NEEDED TO THE BRIDGE MOUNTED PCA, OR TO THE MOBILE
ACU UNIT.
APU IS AUTHORIZED 10 MINUTES MAXIMUM PRIOR TO TOBT TO ALLOW THE
GROUND HANDLER TO DISCONNECT 400HZ/PCA/GPU/ACU FROM THE AIRCRAFT.
APU MIGHT BE USED, IN CASE OF VERY HIGH TEMPERATURE REQUESTING
ADDITIONAL POWER, OR IN CASE OF NONE AVAILABLE GPU/ACU UNIT ON
REMOTE STAND, IF SHARED WITH ATC AND AIRPORT GROUND OPERATIONS.
A0171/23
08/01/2023 00:00
PERM
REF AIP JORDAN OJAI AD 2.24.8-16 CHART. OJAI INSTRUMENT APPROACH
CHART NDB RWY 08R WILL BE SUSPENDED.
ALL ACFT ARE EXPECTED TO OPERATE EITHER VISUAL APP OR RNP APP FOR
RWY 08R
Start Date UTC
08/01/2023 00:00
Conditions
REF AIP JORDAN OJAI AD 2.24.8-16 CHART. OJAI INSTRUMENT APPROACH
CHART NDB RWY 08R WILL BE SUSPENDED.
ALL ACFT ARE EXPECTED TO OPERATE EITHER VISUAL APP OR RNP APP FOR
RWY 08R
A0172/23
08/01/2023 00:00
PERM
REF AIP JORDAN ENR 1.5-11 PARA 2.3.2.2 AND ENR 1.5-12 PARA
2.3.3.2 TO READ:
IN CASE OF COMMUNICATION FAILURE EASTERLY OPERATION FLY TO THE
CLEARED RUNWAY RNAV(GNSS) ARRIVAL IN ACCORDANCE WITH LOSAR1G LUDAN1G
OSAMA1G QTR011G ELOXI1G EGLOT1G PROFILE TO CARRY OUT (INSTRUMENT APP
PROCEDURE)AND LAND IF POSSIBLE WITHIN 30 MINTS OF THE LAST
ACKNOWLEDGED EAT OR ETA WHICHEVER IS LATER
Start Date UTC
08/01/2023 00:00
Conditions
REF AIP JORDAN ENR 1.5-11 PARA 2.3.2.2 AND ENR 1.5-12 PARA
2.3.3.2 TO READ:
IN CASE OF COMMUNICATION FAILURE EASTERLY OPERATION FLY TO THE
CLEARED RUNWAY RNAV(GNSS) ARRIVAL IN ACCORDANCE WITH LOSAR1G LUDAN1G
OSAMA1G QTR011G ELOXI1G EGLOT1G PROFILE TO CARRY OUT (INSTRUMENT APP
PROCEDURE)AND LAND IF POSSIBLE WITHIN 30 MINTS OF THE LAST
ACKNOWLEDGED EAT OR ETA WHICHEVER IS LATER