B0900/24
11/28/2024 06:38
02/27/2025 06:15
A CANAL EXCAVATION ALONG AND RIGHT SIDR OF RWY 12:
DIST FM THR RWY 12: 556 M
DIST FM RCL: 135 M
LEN: 1800 M, WID: 1.75 M, DPT: 1.75 M
MOUND HGT: 5 FT
Start Date UTC
11/28/2024 06:38
End Date UTC
02/27/2025 06:15
Conditions
A CANAL EXCAVATION ALONG AND RIGHT SIDR OF RWY 12:
DIST FM THR RWY 12: 556 M
DIST FM RCL: 135 M
LEN: 1800 M, WID: 1.75 M, DPT: 1.75 M
MOUND HGT: 5 FT
B0901/24
11/28/2024 10:33
02/27/2025 06:15
A CANAL EXCAVATION ALONG AND RIGHT SIDE OF RWY 12:
DIST FM THR RWY 12: 556 M
DIST FM RCL: 135 M
LEN: 1800 M, WID: 1.75 M, DPT: 1.75 M
MOUND HGT: 5 FT
Start Date UTC
11/28/2024 10:33
End Date UTC
02/27/2025 06:15
Conditions
A CANAL EXCAVATION ALONG AND RIGHT SIDE OF RWY 12:
DIST FM THR RWY 12: 556 M
DIST FM RCL: 135 M
LEN: 1800 M, WID: 1.75 M, DPT: 1.75 M
MOUND HGT: 5 FT