A9252/24
04/02/2025 21:50
10/25/2025 01:59
RWY 06L/24R SHALL BE TEMPORARILY CLSD TO DEP AND ARR TFC DUE TO
RWY MAINTENANCE AS FOLLOWING DATES AND TIMES:
1- BTN 02 APR 2025, 2150 UTC-10 MAY 2025, 0159 UTC:
MON: 0000-0159 UTC, 2150-2359 UTC,
TUE: 0000-0249 UTC, 2150-2359 UTC,
WED: 0000-0249 UTC, 2150-2359 UTC,
THU: 0000-0249 UTC, 2300-2359 UTC,
FRI: 0000-0159 UTC, 2300-2359 UTC,
SAT: 0000-0159 UTC, 2300-2359 UTC,
SUN: 0000-0159 UTC, 2300-2359 UTC,
2- BTN 10 MAY 2025, 2300 UTC-25 OCT 2025, 0159 UTC:
MON: 0000-0159 UTC, 2300-2359 UTC,
TUE: 0000-0159 UTC, 2300-2359 UTC,
WED: 0000-0159 UTC, 2300-2359 UTC,
THU: 0000-0159 UTC, 2300-2359 UTC,
FRI: 0000-0159 UTC, 2300-2359 UTC,
SAT: 0000-0159 UTC, 2300-2359 UTC,
SUN: 0000-0159 UTC, 2300-2359 UTC,
RWY CLOSURE SHALL NOT BE APPLIED FOR THIS PERIOD AS FOLLOWING DATES
AND TIMES:
16 MAY: 2300-2359 UTC,
17 MAY: 0000-0159 UTC,
19 MAY: 2300-2359 UTC,
20 MAY: 0000-0159 UTC,
04 JUN: 2300-2359 UTC,
05 JUN: 0000-0159 UTC,
05 JUN: 2300-2359 UTC,
06 JUN: 0000-0159 UTC,
09 JUN: 2300-2359 UTC,
10 JUN: 0000-0159 UTC,
11 JUL: 2300-2359 UTC,
12 JUL: 0000-0159 UTC,
15 JUL: 2300-2359 UTC,
16 JUL: 0000-0159 UTC,
3- PILOTS OF DEP TFC SHALL REQUEST START UP AND PUSH-BACK CLEARANCE
BEFORE 25 MINUTES FROM RWY CLOSURE TIME NOT REGARDING SLOT TIME.
Start Date UTC
04/02/2025 21:50
End Date UTC
10/25/2025 01:59
Conditions
RWY 06L/24R SHALL BE TEMPORARILY CLSD TO DEP AND ARR TFC DUE TO
RWY MAINTENANCE AS FOLLOWING DATES AND TIMES:
1- BTN 02 APR 2025, 2150 UTC-10 MAY 2025, 0159 UTC:
MON: 0000-0159 UTC, 2150-2359 UTC,
TUE: 0000-0249 UTC, 2150-2359 UTC,
WED: 0000-0249 UTC, 2150-2359 UTC,
THU: 0000-0249 UTC, 2300-2359 UTC,
FRI: 0000-0159 UTC, 2300-2359 UTC,
SAT: 0000-0159 UTC, 2300-2359 UTC,
SUN: 0000-0159 UTC, 2300-2359 UTC,
2- BTN 10 MAY 2025, 2300 UTC-25 OCT 2025, 0159 UTC:
MON: 0000-0159 UTC, 2300-2359 UTC,
TUE: 0000-0159 UTC, 2300-2359 UTC,
WED: 0000-0159 UTC, 2300-2359 UTC,
THU: 0000-0159 UTC, 2300-2359 UTC,
FRI: 0000-0159 UTC, 2300-2359 UTC,
SAT: 0000-0159 UTC, 2300-2359 UTC,
SUN: 0000-0159 UTC, 2300-2359 UTC,
RWY CLOSURE SHALL NOT BE APPLIED FOR THIS PERIOD AS FOLLOWING DATES
AND TIMES:
16 MAY: 2300-2359 UTC,
17 MAY: 0000-0159 UTC,
19 MAY: 2300-2359 UTC,
20 MAY: 0000-0159 UTC,
04 JUN: 2300-2359 UTC,
05 JUN: 0000-0159 UTC,
05 JUN: 2300-2359 UTC,
06 JUN: 0000-0159 UTC,
09 JUN: 2300-2359 UTC,
10 JUN: 0000-0159 UTC,
11 JUL: 2300-2359 UTC,
12 JUL: 0000-0159 UTC,
15 JUL: 2300-2359 UTC,
16 JUL: 0000-0159 UTC,
3- PILOTS OF DEP TFC SHALL REQUEST START UP AND PUSH-BACK CLEARANCE
BEFORE 25 MINUTES FROM RWY CLOSURE TIME NOT REGARDING SLOT TIME.
A2751/24
10/28/2024 23:00
03/28/2025 02:00
SABIHA GOKCEN AERODROME,
RWY 06L/24R SHALL BE TEMPORARILY CLSD TO DEP AND ARR TFC DUE TO RWY
MAINTENANCE AS FOLLOWING DATES AND TIMES:
BTN OCT 28 2024 2300 UTC-MAR 28 2025 0200 UTC:
MON: 0000-0200 UTC, 2300-2359 UTC
TUE: 0000-0200 UTC, 2200-2359 UTC
WED: 0000-0250 UTC, 2200-2359 UTC
THU: 0000-0250 UTC, 2300-2359 UTC
FRI: 0000-0200 UTC, 2300-2359 UTC
SAT: 0000-0200 UTC, 2200-2359 UTC
SUN: 0000-0250 UTC, 2300-2359 UTC
RWY CLOSURE SHALL NOT BE APPLIED AS FOLLOWING PERIODS:
BTN OCT 29 2024 2200 UTC-OCT 30 2024 0250 UTC,
BTN DEC 27 2024 2300 UTC-DEC 28 2024 0200 UTC,
BTN JAN 01 2025 2200 UTC-JAN 02 2025 0250 UTC.
PILOTS OF DEP TFC SHALL REQUEST START UP AND PUSH-BACK CLEARANCE.
BEFORE 25 MINUTES FROM RWY CLOSURE TIME NOT REGARDING SLOT TIME.
OTHERWISE THEY SHALL NOT BE ALLOWED TO START UP AND PUSH-BACK.
Start Date UTC
10/28/2024 23:00
End Date UTC
03/28/2025 02:00
Conditions
SABIHA GOKCEN AERODROME,
RWY 06L/24R SHALL BE TEMPORARILY CLSD TO DEP AND ARR TFC DUE TO RWY
MAINTENANCE AS FOLLOWING DATES AND TIMES:
BTN OCT 28 2024 2300 UTC-MAR 28 2025 0200 UTC:
MON: 0000-0200 UTC, 2300-2359 UTC
TUE: 0000-0200 UTC, 2200-2359 UTC
WED: 0000-0250 UTC, 2200-2359 UTC
THU: 0000-0250 UTC, 2300-2359 UTC
FRI: 0000-0200 UTC, 2300-2359 UTC
SAT: 0000-0200 UTC, 2200-2359 UTC
SUN: 0000-0250 UTC, 2300-2359 UTC
RWY CLOSURE SHALL NOT BE APPLIED AS FOLLOWING PERIODS:
BTN OCT 29 2024 2200 UTC-OCT 30 2024 0250 UTC,
BTN DEC 27 2024 2300 UTC-DEC 28 2024 0200 UTC,
BTN JAN 01 2025 2200 UTC-JAN 02 2025 0250 UTC.
PILOTS OF DEP TFC SHALL REQUEST START UP AND PUSH-BACK CLEARANCE.
BEFORE 25 MINUTES FROM RWY CLOSURE TIME NOT REGARDING SLOT TIME.
OTHERWISE THEY SHALL NOT BE ALLOWED TO START UP AND PUSH-BACK.
B4508/24
11/21/2024 07:03
02/19/2025 15:00
PRESENCE SURFACE IRREGULARITIES ON RWY 06L/24R REDUCING DRIVING
QUALITY.
Start Date UTC
11/21/2024 07:03
End Date UTC
02/19/2025 15:00
Conditions
PRESENCE SURFACE IRREGULARITIES ON RWY 06L/24R REDUCING DRIVING
QUALITY.
B4509/24
11/21/2024 07:09
02/19/2025 15:00
TWY C OPENED ONLY FOR TOWING BTN PARKING POSITION 113 AND TWY V.
Start Date UTC
11/21/2024 07:09
End Date UTC
02/19/2025 15:00
Conditions
TWY C OPENED ONLY FOR TOWING BTN PARKING POSITION 113 AND TWY V.
B4510/24
11/21/2024 07:15
02/19/2025 15:00
TWY L1 AND TWY L2 AVBL ONLY FOR TOWING MOVEMENTS.
Start Date UTC
11/21/2024 07:15
End Date UTC
02/19/2025 15:00
Conditions
TWY L1 AND TWY L2 AVBL ONLY FOR TOWING MOVEMENTS.
B4468/24
11/20/2024 13:46
02/18/2025 15:00
PROCEDURES FOR NIGHT USE OF TWYS C, C6, AND C11:
1.ACFT MOVEMENTS ON TWYS C, C6, AND C11 WILL BE CONDUCTED UNDER
FOLLOW-ME GUIDANCE.
2.FOLLOW-ME SERVICE WILL NOT BE PROVIDED FOR ACFT LANDING ON RWY 06R
AND PARKING ON APRON-8 UNLESS OTHERWISE SPECIFIED.
3.ACFT LANDING ON RWY 06R OR DEPARTING FROM APRON-8 AND PROCEEDING
TO RWY 06L/24R MUST WAIT AT THE INTERSECTION OF TWYS M1/M2 AND TWY C
TO RECEIVE FOLLOW-ME SERVICE. FOLLOW-ME SERVICE WILL TERMINATE AFTER
RWY CROSSING UNLESS OTHERWISE SPECIFIED BY ATC.
4.TRAFFIC DEPARTING FROM RWY 24L OR PROCEEDING TO APRON-8 AFTER
CROSSING RWY 06L/24R WILL RECEIVE FOLLOW-ME SERVICE BY WAITING ON
TWYS G OR E ACCORDING TO ATC INSTRUCTIONS. FOLLOW-ME SERVICE WILL
TERMINATE AT THE INTERSECTION OF TWYS M1/M2 AND TWY C UNLESS
OTHERWISE SPECIFIED BY ATC.
Start Date UTC
11/20/2024 13:46
End Date UTC
02/18/2025 15:00
Conditions
PROCEDURES FOR NIGHT USE OF TWYS C, C6, AND C11:
1.ACFT MOVEMENTS ON TWYS C, C6, AND C11 WILL BE CONDUCTED UNDER
FOLLOW-ME GUIDANCE.
2.FOLLOW-ME SERVICE WILL NOT BE PROVIDED FOR ACFT LANDING ON RWY 06R
AND PARKING ON APRON-8 UNLESS OTHERWISE SPECIFIED.
3.ACFT LANDING ON RWY 06R OR DEPARTING FROM APRON-8 AND PROCEEDING
TO RWY 06L/24R MUST WAIT AT THE INTERSECTION OF TWYS M1/M2 AND TWY C
TO RECEIVE FOLLOW-ME SERVICE. FOLLOW-ME SERVICE WILL TERMINATE AFTER
RWY CROSSING UNLESS OTHERWISE SPECIFIED BY ATC.
4.TRAFFIC DEPARTING FROM RWY 24L OR PROCEEDING TO APRON-8 AFTER
CROSSING RWY 06L/24R WILL RECEIVE FOLLOW-ME SERVICE BY WAITING ON
TWYS G OR E ACCORDING TO ATC INSTRUCTIONS. FOLLOW-ME SERVICE WILL
TERMINATE AT THE INTERSECTION OF TWYS M1/M2 AND TWY C UNLESS
OTHERWISE SPECIFIED BY ATC.
B4005/24
11/08/2024 10:15
02/05/2025 12:00
USAGE OF APRON 8 AND TWY C AS FOLLOWS:
- CENTERLINE OF TWY C BTN TWY C11 AND TWY M2 ON THE COORDINATE
405406.61N0291923.65E IS DISPLACED.
- NEW INTERMEDIATE HOLDING POINT C-HP59 ALLOCATED ON TWY C
405406.61N0291924.14E
- ALL TRAFFICS DEPARTING FROM APRON 8 SHALL STOP AT C-HP59
INTERMEDIATE HOLDING POINT AND WAIT FOR ATC INSTRUCTIONS.
- ALL TRAFFICS DEPARTING FROM APRON 8 SHALL BE PREPARED FOR LONG
WAITS IN THE PARKING OR TWY.
- IF REQ FOLLOW-ME GUIDANCE SERVICE WILL BE AVBL FOR DEPARTING
TRAFFICS AT APRON 8.
- AFTER LANDING TO RWY 24R TO GO TO APRON 8, TRAFFICS SHALL VACATE
THE RWY VIA TWY C6, TWY U, TWY H OR TWY J.
- ALL TRAFFICS BE CAUTIOUS AND ADVISE ATC INSTRUCTIONS.
Start Date UTC
11/08/2024 10:15
End Date UTC
02/05/2025 12:00
Conditions
USAGE OF APRON 8 AND TWY C AS FOLLOWS:
- CENTERLINE OF TWY C BTN TWY C11 AND TWY M2 ON THE COORDINATE
405406.61N0291923.65E IS DISPLACED.
- NEW INTERMEDIATE HOLDING POINT C-HP59 ALLOCATED ON TWY C
405406.61N0291924.14E
- ALL TRAFFICS DEPARTING FROM APRON 8 SHALL STOP AT C-HP59
INTERMEDIATE HOLDING POINT AND WAIT FOR ATC INSTRUCTIONS.
- ALL TRAFFICS DEPARTING FROM APRON 8 SHALL BE PREPARED FOR LONG
WAITS IN THE PARKING OR TWY.
- IF REQ FOLLOW-ME GUIDANCE SERVICE WILL BE AVBL FOR DEPARTING
TRAFFICS AT APRON 8.
- AFTER LANDING TO RWY 24R TO GO TO APRON 8, TRAFFICS SHALL VACATE
THE RWY VIA TWY C6, TWY U, TWY H OR TWY J.
- ALL TRAFFICS BE CAUTIOUS AND ADVISE ATC INSTRUCTIONS.
B3999/24
11/08/2024 08:05
02/04/2025 14:00
ILS GP ISGB 331.85MHZ RWY 24L U/S.
Start Date UTC
11/08/2024 08:05
End Date UTC
02/04/2025 14:00
Conditions
ILS GP ISGB 331.85MHZ RWY 24L U/S.
B4000/24
11/08/2024 08:12
02/04/2025 14:00
ILS GP ISBH 330.8MHZ RWY 24R U/S.
Start Date UTC
11/08/2024 08:12
End Date UTC
02/04/2025 14:00
Conditions
ILS GP ISBH 330.8MHZ RWY 24R U/S.
B3273/24
10/24/2024 08:45
01/25/2025 09:00
FOLLOWING PROCEDURES FOR RWY 24L SUSPENDED.
- ILS Z CAT I RWY 24L (IAC-25),
- ILS Y CAT I RWY 24L (IAC-26),
- ILS X CAT I RWY 24L (IAC-27),
REF AIP AD2 LTFJ IAC25-IAC27
Start Date UTC
10/24/2024 08:45
End Date UTC
01/25/2025 09:00
Conditions
FOLLOWING PROCEDURES FOR RWY 24L SUSPENDED.
- ILS Z CAT I RWY 24L (IAC-25),
- ILS Y CAT I RWY 24L (IAC-26),
- ILS X CAT I RWY 24L (IAC-27),
REF AIP AD2 LTFJ IAC25-IAC27
B4204/24
11/13/2024 12:31
01/13/2025 17:00
APCH LIGHTING SYSTEM RWY 24R BTN 300M-450M U/S DUE TO POWER
FAILURE
Start Date UTC
11/13/2024 12:31
End Date UTC
01/13/2025 17:00
Conditions
APCH LIGHTING SYSTEM RWY 24R BTN 300M-450M U/S DUE TO POWER
FAILURE
B4293/24
12/26/2024 00:00
01/08/2025 23:59
TRIGGER NOTAM-PERM AIRAC AIP AMDT 11/24 WEF 26 DEC 2024
CHANGES OF SEASONAL AVAIABILITY-CLEARING, APRONS TWYS AND CHECK
LOCATIONS DATA, SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM AND
MARKINGS, RWY PHYSICAL CHARACTERISTICS, DECLARED DISTANCES, APPROACH
AND RWY LIGHTING, OTHER LIGHTING, LOCAK TRAFFIC REGULATIONS, MINIMUM
RWY OCCUPANCY TIME DEPARTURES, STANDARD PUSH-BACK PROCEDURES, HOT
SPOT APPLICATIONS, RWY 06R-24R LOW VISIBILITY TAKE OFF PROCEDURES,
RWY 06R DEPARTURE, AD 2 LTFJ ADC, AD 2 LTFJ PRKG, PRKG A, AD 2 LTFJ
GMC-1,GMC-2,GMC-3,GMC-4,GMC-5,GMC-6,GMC-7,GMC-8,GMC-9,GMC-10,GMC-11,G
MC-12,GMC-13 ILE ILGILI DEGISIKLIKLER
Start Date UTC
12/26/2024 00:00
End Date UTC
01/08/2025 23:59
Conditions
TRIGGER NOTAM-PERM AIRAC AIP AMDT 11/24 WEF 26 DEC 2024
CHANGES OF SEASONAL AVAIABILITY-CLEARING, APRONS TWYS AND CHECK
LOCATIONS DATA, SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM AND
MARKINGS, RWY PHYSICAL CHARACTERISTICS, DECLARED DISTANCES, APPROACH
AND RWY LIGHTING, OTHER LIGHTING, LOCAK TRAFFIC REGULATIONS, MINIMUM
RWY OCCUPANCY TIME DEPARTURES, STANDARD PUSH-BACK PROCEDURES, HOT
SPOT APPLICATIONS, RWY 06R-24R LOW VISIBILITY TAKE OFF PROCEDURES,
RWY 06R DEPARTURE, AD 2 LTFJ ADC, AD 2 LTFJ PRKG, PRKG A, AD 2 LTFJ
GMC-1,GMC-2,GMC-3,GMC-4,GMC-5,GMC-6,GMC-7,GMC-8,GMC-9,GMC-10,GMC-11,G
MC-12,GMC-13 ILE ILGILI DEGISIKLIKLER
B4013/24
11/08/2024 12:50
01/07/2025 15:00
TWY A1 CLSD TO TFC.
Start Date UTC
11/08/2024 12:50
End Date UTC
01/07/2025 15:00
Conditions
TWY A1 CLSD TO TFC.
B4316/24
11/25/2024 21:30
12/27/2024 03:30
RWY 06L/24R SHALL BE TEMPORARILY CLSD TO DEP AND ARR TFC AS
FOLLOWING DATES AND TIMES:
MON: 0000-0330 UTC, 2130-2359 UTC
TUE: 0000-0330 UTC, 2130-2359 UTC
WED: 0000-0330 UTC, 2130-2359 UTC
THU: 0000-0330 UTC, 2130-2359 UTC
FRI: 0000-0330 UTC, 2130-2359 UTC
SAT: 0000-0330 UTC, 2130-2359 UTC
SUN: 0000-0330 UTC, 2130-2359 UTC
SEE NOTAM: A2751/24
Start Date UTC
11/25/2024 21:30
End Date UTC
12/27/2024 03:30
Conditions
RWY 06L/24R SHALL BE TEMPORARILY CLSD TO DEP AND ARR TFC AS
FOLLOWING DATES AND TIMES:
MON: 0000-0330 UTC, 2130-2359 UTC
TUE: 0000-0330 UTC, 2130-2359 UTC
WED: 0000-0330 UTC, 2130-2359 UTC
THU: 0000-0330 UTC, 2130-2359 UTC
FRI: 0000-0330 UTC, 2130-2359 UTC
SAT: 0000-0330 UTC, 2130-2359 UTC
SUN: 0000-0330 UTC, 2130-2359 UTC
SEE NOTAM: A2751/24
B2242/24
09/27/2024 08:30
12/26/2024 14:00
RWY 06R LOW VISIBILITY OPERATION NOT AVBL.
Start Date UTC
09/27/2024 08:30
End Date UTC
12/26/2024 14:00
Conditions
RWY 06R LOW VISIBILITY OPERATION NOT AVBL.
A8926/24
09/13/2024 13:17
12/13/2024 14:00
IRREGULAR PARKING AT ACFT STANDS NUMBERED 114.
-DUE TO CONSTRUCTION WORK-
Start Date UTC
09/13/2024 13:17
End Date UTC
12/13/2024 14:00
Conditions
IRREGULAR PARKING AT ACFT STANDS NUMBERED 114.
-DUE TO CONSTRUCTION WORK-
A8927/24
09/13/2024 13:34
12/13/2024 14:00
IRREGULAR PARKING AT PARKING AREAS 103, 104, 105, 106, 107, 108,
109 AND 110 ON CARGO APRON WITHIN FOLLOWING COORDINATES:
-DUE TO CONSTRUCTION WORKS-
405345.50N0291838.14E
405348.13N0291836.46E
405340.82N0291815.50E
405337.73N0291817.47E
Start Date UTC
09/13/2024 13:34
End Date UTC
12/13/2024 14:00
Conditions
IRREGULAR PARKING AT PARKING AREAS 103, 104, 105, 106, 107, 108,
109 AND 110 ON CARGO APRON WITHIN FOLLOWING COORDINATES:
-DUE TO CONSTRUCTION WORKS-
405345.50N0291838.14E
405348.13N0291836.46E
405340.82N0291815.50E
405337.73N0291817.47E
A8928/24
09/13/2024 13:40
12/13/2024 14:00
IRREGULAR PARKING SHALL BE MADE ON APRON 7 AT FOLLOWING
COORDINATES:
405354.49N0291854.96E
405357.09N0291902.09E
405350.94N0291906.01E
405348.33N0291858.84E
Start Date UTC
09/13/2024 13:40
End Date UTC
12/13/2024 14:00
Conditions
IRREGULAR PARKING SHALL BE MADE ON APRON 7 AT FOLLOWING
COORDINATES:
405354.49N0291854.96E
405357.09N0291902.09E
405350.94N0291906.01E
405348.33N0291858.84E
A8929/24
09/13/2024 13:44
12/13/2024 14:00
PARKING POSITIONS -811- AND -811R- CLSD TO TFC DUE TO CONST.
Start Date UTC
09/13/2024 13:44
End Date UTC
12/13/2024 14:00
Conditions
PARKING POSITIONS -811- AND -811R- CLSD TO TFC DUE TO CONST.
B4384/24
11/19/2024 02:00
11/30/2024 17:00
APCH LIGHTING SYSTEM SIDE ROW BARS RWY 06L EVERY SECOND WORKING
Start Date UTC
11/19/2024 02:00
End Date UTC
11/30/2024 17:00
Conditions
APCH LIGHTING SYSTEM SIDE ROW BARS RWY 06L EVERY SECOND WORKING
B3704/24
11/01/2024 12:00
11/29/2024 14:00
GRASS CUTTING ON RWY 06R/24L AND ALL TWYS.
ADVISE ATC INSTRUCTION
Start Date UTC
11/01/2024 12:00
End Date UTC
11/29/2024 14:00
Conditions
GRASS CUTTING ON RWY 06R/24L AND ALL TWYS.
ADVISE ATC INSTRUCTION
B4179/24
11/13/2024 08:15
11/27/2024 15:00
CARGO APRON AND APRON CENTERLINE CLSD TO TFC IN COORDINATES GIVEN
BELOW:
405340.82N0291815.50E
405342.49N0291814.52E
405350.11N0291835.20E
405346.13N0291836.46E
-DUE TO AUDIT AND CONTROL-
Start Date UTC
11/13/2024 08:15
End Date UTC
11/27/2024 15:00
Conditions
CARGO APRON AND APRON CENTERLINE CLSD TO TFC IN COORDINATES GIVEN
BELOW:
405340.82N0291815.50E
405342.49N0291814.52E
405350.11N0291835.20E
405346.13N0291836.46E
-DUE TO AUDIT AND CONTROL-
B4180/24
11/13/2024 08:16
11/27/2024 15:00
TWY B BTN HOLDING POINT B-HP26 AND HOLDING POINT B-HP32 CLSD TO
TFC DUE TO CHECK AND CONTROL.
TWY B6 CLSD TO
TFC DUE TO CHECK AND CONTROL.
Start Date UTC
11/13/2024 08:16
End Date UTC
11/27/2024 15:00
Conditions
TWY B BTN HOLDING POINT B-HP26 AND HOLDING POINT B-HP32 CLSD TO
TFC DUE TO CHECK AND CONTROL.
TWY B6 CLSD TO
TFC DUE TO CHECK AND CONTROL.
B4181/24
11/13/2024 08:17
11/27/2024 15:00
PRESENCE OF 5M HEIGHT MOBILE VEHICLES ON CARGO APRON AT FOLLOWING
COORDINATES:
405342.49N0291814.52E
405346.28N0291824.82E
405348.64N0291825.21E
405348.98N0291826.13E
405347.77N0291828.85E
405350.11N0291835.20E
405348.13N0291836.46E
405340.82N0291815.50E
Start Date UTC
11/13/2024 08:17
End Date UTC
11/27/2024 15:00
Conditions
PRESENCE OF 5M HEIGHT MOBILE VEHICLES ON CARGO APRON AT FOLLOWING
COORDINATES:
405342.49N0291814.52E
405346.28N0291824.82E
405348.64N0291825.21E
405348.98N0291826.13E
405347.77N0291828.85E
405350.11N0291835.20E
405348.13N0291836.46E
405340.82N0291815.50E
B4182/24
11/13/2024 08:16
11/27/2024 15:00
PART OF APRON 7 CLSD TO TFC COORDINATES GIVEN BELOW DUE TO CHECK
AND CONTROL
405348.33N0291858.84E
405350.94N0291906.01E
405342.29N0291911.52E
405339.72N0291904.36E
Start Date UTC
11/13/2024 08:16
End Date UTC
11/27/2024 15:00
Conditions
PART OF APRON 7 CLSD TO TFC COORDINATES GIVEN BELOW DUE TO CHECK
AND CONTROL
405348.33N0291858.84E
405350.94N0291906.01E
405342.29N0291911.52E
405339.72N0291904.36E
B4183/24
11/13/2024 08:17
11/27/2024 15:00
TWY C5 CLOSED TO TFC DUE TO AUDIT AND CONTROL
Start Date UTC
11/13/2024 08:17
End Date UTC
11/27/2024 15:00
Conditions
TWY C5 CLOSED TO TFC DUE TO AUDIT AND CONTROL
B4184/24
11/13/2024 08:17
11/27/2024 15:00
TWYS B1,B2,B3,B4,B5,R1,R2 CLSD.
PART OF TWY B AT COORDINATES GIVEN BELOW CLSD.
405331.34N0291847.47E
405330.13N0291848.18E
405314.47N0291758.85E
405313.28N0291759.62E
-DUE TO CHECK AND CONTROL-
Start Date UTC
11/13/2024 08:17
End Date UTC
11/27/2024 15:00
Conditions
TWYS B1,B2,B3,B4,B5,R1,R2 CLSD.
PART OF TWY B AT COORDINATES GIVEN BELOW CLSD.
405331.34N0291847.47E
405330.13N0291848.18E
405314.47N0291758.85E
405313.28N0291759.62E
-DUE TO CHECK AND CONTROL-
B4185/24
11/13/2024 08:18
11/27/2024 15:00
TWY C CLSD TO TFC BTN HOLDING POINT C-HP64 AND PARKING POSITION
113
Start Date UTC
11/13/2024 08:18
End Date UTC
11/27/2024 15:00
Conditions
TWY C CLSD TO TFC BTN HOLDING POINT C-HP64 AND PARKING POSITION
113
B4186/24
11/13/2024 08:19
11/27/2024 15:00
TWY C IS PARTLY CLOSED AT BELOW COORDINATES:
405332.45N0291746.26E
405331.26N0291749.20E
405327.65N0291739.49E
405326.91N0291736.70E
-DUE TO CHECK AND CONTROL-
Start Date UTC
11/13/2024 08:19
End Date UTC
11/27/2024 15:00
Conditions
TWY C IS PARTLY CLOSED AT BELOW COORDINATES:
405332.45N0291746.26E
405331.26N0291749.20E
405327.65N0291739.49E
405326.91N0291736.70E
-DUE TO CHECK AND CONTROL-
B4187/24
11/13/2024 08:20
11/27/2024 15:00
APRON 6 CLSD TO TFC DUE TO CHECK AND CONTROL
Start Date UTC
11/13/2024 08:20
End Date UTC
11/27/2024 15:00
Conditions
APRON 6 CLSD TO TFC DUE TO CHECK AND CONTROL
B4188/24
11/13/2024 08:20
11/27/2024 15:00
TWY L3, L4, K1, K2, K3 AND K4 CLOSED.
Start Date UTC
11/13/2024 08:20
End Date UTC
11/27/2024 15:00
Conditions
TWY L3, L4, K1, K2, K3 AND K4 CLOSED.
B4478/24
11/20/2024 16:35
11/26/2024 14:00
RWY 24R APCH LIGHTS EVERY SECOND WORKING.
Start Date UTC
11/20/2024 16:35
End Date UTC
11/26/2024 14:00
Conditions
RWY 24R APCH LIGHTS EVERY SECOND WORKING.
A9553/24
11/21/2024 07:17
11/24/2024 07:17
A9553/24 NOTAMC A8195/24
Q) LTBB/QMXXX/IV/M /A /000/999/4054N02919E005
A) LTFJ B) 2411210716
E) TWY L1 AND TWY L2,NOTAM CANCELLED.NEW NOTAM ISSUED AS B4510/24.
Start Date UTC
11/21/2024 07:17
End Date UTC
11/24/2024 07:17
Conditions
A9553/24 NOTAMC A8195/24
Q) LTBB/QMXXX/IV/M /A /000/999/4054N02919E005
A) LTFJ B) 2411210716
E) TWY L1 AND TWY L2,NOTAM CANCELLED.NEW NOTAM ISSUED AS B4510/24.
A9552/24
11/21/2024 07:11
11/24/2024 07:11
A9552/24 NOTAMC A8196/24
Q) LTBB/QMXXX/IV/BO /A /000/999/4054N02919E005
A) LTFJ B) 2411210711
E) TWY C,NOTAM CANCELLED.NEW NOTAM ISSUED AS B4509/24
Start Date UTC
11/21/2024 07:11
End Date UTC
11/24/2024 07:11
Conditions
A9552/24 NOTAMC A8196/24
Q) LTBB/QMXXX/IV/BO /A /000/999/4054N02919E005
A) LTFJ B) 2411210711
E) TWY C,NOTAM CANCELLED.NEW NOTAM ISSUED AS B4509/24
A9551/24
11/21/2024 07:10
11/24/2024 07:10
A9551/24 NOTAMC A8194/24
Q) LTBB/QMRXX/IV/BO /A /000/999/4054N02919E005
A) LTFJ B) 2411210710
E) PRESENCE SURFACE IRREGULARITIES, NEW NOTAM ISSUED AS B4508/24
Start Date UTC
11/21/2024 07:10
End Date UTC
11/24/2024 07:10
Conditions
A9551/24 NOTAMC A8194/24
Q) LTBB/QMRXX/IV/BO /A /000/999/4054N02919E005
A) LTFJ B) 2411210710
E) PRESENCE SURFACE IRREGULARITIES, NEW NOTAM ISSUED AS B4508/24
B4477/24
11/20/2024 16:38
11/23/2024 16:38
B4477/24 NOTAMC B4470/24
Q) LTBB/QLAAK/IV/NBO/A /000/999/4054N02919E005
A) LTFJ B) 2411201636
E) RWY 06L APCH LIGHTS RESUMED NORMAL OPERATION.
Start Date UTC
11/20/2024 16:38
End Date UTC
11/23/2024 16:38
Conditions
B4477/24 NOTAMC B4470/24
Q) LTBB/QLAAK/IV/NBO/A /000/999/4054N02919E005
A) LTFJ B) 2411201636
E) RWY 06L APCH LIGHTS RESUMED NORMAL OPERATION.
A9549/24
11/20/2024 13:46
11/23/2024 13:46
A9549/24 NOTAMC A8768/24
Q) LTBB/QMXXX/IV/M /A /000/999/4054N02919E005
A) LTFJ B) 2411201346
E) TWYS C, C6, AND C11-NOTAM CANCELLED. NEW NOTAM TO FOLLOW.
Start Date UTC
11/20/2024 13:46
End Date UTC
11/23/2024 13:46
Conditions
A9549/24 NOTAMC A8768/24
Q) LTBB/QMXXX/IV/M /A /000/999/4054N02919E005
A) LTFJ B) 2411201346
E) TWYS C, C6, AND C11-NOTAM CANCELLED. NEW NOTAM TO FOLLOW.
B4016/24
11/08/2024 16:00
11/22/2024 04:00
RWY 06R/24L RUBBER REMOVAL WORK IN PROGRESS.
Start Date UTC
11/08/2024 16:00
End Date UTC
11/22/2024 04:00
Conditions
RWY 06R/24L RUBBER REMOVAL WORK IN PROGRESS.
B4017/24
11/08/2024 16:00
11/22/2024 04:00
RWY 06L/24R RUBBER REMOVAL WORK IN PROGRESS.
Start Date UTC
11/08/2024 16:00
End Date UTC
11/22/2024 04:00
Conditions
RWY 06L/24R RUBBER REMOVAL WORK IN PROGRESS.
G4334/13
10/17/2013 00:00
PERM
SABIHA GOKCEN HAVALIMANI'NDAKI RNAV (GNSS) SID VE STAR'LARIN
UYGULANMA GEREKSINIMLERI ILE ILGILI HUSUSLAR ASAGIDAKI GIBIDIR:
THESE PROCEDURES ARE MANDATORY FOR P-RNAV APPROVED AIRCRAFT.
THEREFORE, THE P-RNAV APPROVED AIRCRAFT ARRIVING/DEPARTING TO/FROM
LTFJ ARE REQUIRED TO FLIGHT PLAN OR SUBMIT A MODIFICATION MESSAGE
(CHG) CONCERNING THE ROUTE SECTION OF THEIR RPLS AS DESCRIBED BELOW:
1-GNSS BASED RNAV STARS FOR LTFJ STARTS FROM THE WAYPOINTS/FIXES,
DESIGNATED AS TETSA, PAZAR, OTSAN, ELVON, DEKEK, TURKO, GELBU AND
ATVEP.
THESE WAYPOINTS/FIXES SHALL BE THE LAST ELEMENT OF THE FLIGHT
PLANNED ROUTES FOR THE P-RNAV APPROVED AIRCRAFT AS ILLUSTRATED BELOW:
-A FLIGHT PLANNED ROUTE FOR THE ARRIVALS TO LTFJ VIA RIXEN,
EXAMPLE:..... RIXEN UN616 TETSA
2- GNSS BASED RNAV SIDS FOR LTFJ ENDS AT THE WAYPOINTS/FIXES,
DESIGNATED AS MARMA, GOLDO, VADEN, IBLAL, MAKOL,MOPIN, PIMAV AND
EDASA.
THESE WAYPOINTS/FIXES SHALL BE THE FIRST ELEMENT OF THE FLIGHT
PLANNED ROUTES FOR THE P-RNAV APPROVED AIRCRAFT AS ILLUSTRATED BELOW:
-A FLIGHT PLANNED ROUTE FOR THE DEPARTURES FROM LTFJ VIA MAKOL,
EXAMPLE:MAKOL UN617 ......
Start Date UTC
10/17/2013 00:00
Conditions
SABIHA GOKCEN HAVALIMANI'NDAKI RNAV (GNSS) SID VE STAR'LARIN
UYGULANMA GEREKSINIMLERI ILE ILGILI HUSUSLAR ASAGIDAKI GIBIDIR:
THESE PROCEDURES ARE MANDATORY FOR P-RNAV APPROVED AIRCRAFT.
THEREFORE, THE P-RNAV APPROVED AIRCRAFT ARRIVING/DEPARTING TO/FROM
LTFJ ARE REQUIRED TO FLIGHT PLAN OR SUBMIT A MODIFICATION MESSAGE
(CHG) CONCERNING THE ROUTE SECTION OF THEIR RPLS AS DESCRIBED BELOW:
1-GNSS BASED RNAV STARS FOR LTFJ STARTS FROM THE WAYPOINTS/FIXES,
DESIGNATED AS TETSA, PAZAR, OTSAN, ELVON, DEKEK, TURKO, GELBU AND
ATVEP.
THESE WAYPOINTS/FIXES SHALL BE THE LAST ELEMENT OF THE FLIGHT
PLANNED ROUTES FOR THE P-RNAV APPROVED AIRCRAFT AS ILLUSTRATED BELOW:
-A FLIGHT PLANNED ROUTE FOR THE ARRIVALS TO LTFJ VIA RIXEN,
EXAMPLE:..... RIXEN UN616 TETSA
2- GNSS BASED RNAV SIDS FOR LTFJ ENDS AT THE WAYPOINTS/FIXES,
DESIGNATED AS MARMA, GOLDO, VADEN, IBLAL, MAKOL,MOPIN, PIMAV AND
EDASA.
THESE WAYPOINTS/FIXES SHALL BE THE FIRST ELEMENT OF THE FLIGHT
PLANNED ROUTES FOR THE P-RNAV APPROVED AIRCRAFT AS ILLUSTRATED BELOW:
-A FLIGHT PLANNED ROUTE FOR THE DEPARTURES FROM LTFJ VIA MAKOL,
EXAMPLE:MAKOL UN617 ......
G4445/14
09/18/2014 14:52
PERM
ISTANBUL SABIHA GOKCEN HAVALIMANI:
AIP SUP 06/13 IPTAL EDILMISTIR.
Start Date UTC
09/18/2014 14:52
Conditions
ISTANBUL SABIHA GOKCEN HAVALIMANI:
AIP SUP 06/13 IPTAL EDILMISTIR.
A2860/23
05/18/2023 00:00
PERM
ISTANBUL SABIHA GOKCEN AIRPORT
PUBLISHED IN AIP FOR RWY 06/24,
AD 2 LTFJ AD 2.1-2.24 SECTIONS,
AD 2 LTFJ STAR-1, 1A, 2, 2A, 3, 3A, 4, 4A, 5, 5A
AD 2 LTFJ IAC-1, 2, 3, 4, 5, 6, 7, 8, 9, 10 PROCEDURES WILL NOT BE
USED.
FOR RWY 06L/24R, THE INFORMATION/CHARTS AND PROCEDURES PUBLISHED IN
AIRAC SUP 02/23 WILL BE USED.
Start Date UTC
05/18/2023 00:00
Conditions
ISTANBUL SABIHA GOKCEN AIRPORT
PUBLISHED IN AIP FOR RWY 06/24,
AD 2 LTFJ AD 2.1-2.24 SECTIONS,
AD 2 LTFJ STAR-1, 1A, 2, 2A, 3, 3A, 4, 4A, 5, 5A
AD 2 LTFJ IAC-1, 2, 3, 4, 5, 6, 7, 8, 9, 10 PROCEDURES WILL NOT BE
USED.
FOR RWY 06L/24R, THE INFORMATION/CHARTS AND PROCEDURES PUBLISHED IN
AIRAC SUP 02/23 WILL BE USED.
A7934/23
10/24/2023 06:59
PERM
ISTANBUL SABIHA GOKCEN AD,
PLEASE AMEND TO READ INFORMATION AD 2.12 RUNWAY PHYSICAL
CHARACTERISTICS AS FOLLOWS:
RWY 06 R:STRENGTH:PCN 100 R/A/W/T SURFACE CONCRETE
PCN 139 F/A/W/T SURFACE:ASPHALT (1954 M-2524 M)
RWY 24 L:STRENGHT:PCN 100 R/A/W/T SURFACE:CONCRETE
PCN 139 F/A/W/T SURFACE:ASPHALT (1016 M-1586 M)
REF AIP TURKIYE AD 2 LTFJ-6,LTFJ ADC
Start Date UTC
10/24/2023 06:59
Conditions
ISTANBUL SABIHA GOKCEN AD,
PLEASE AMEND TO READ INFORMATION AD 2.12 RUNWAY PHYSICAL
CHARACTERISTICS AS FOLLOWS:
RWY 06 R:STRENGTH:PCN 100 R/A/W/T SURFACE CONCRETE
PCN 139 F/A/W/T SURFACE:ASPHALT (1954 M-2524 M)
RWY 24 L:STRENGHT:PCN 100 R/A/W/T SURFACE:CONCRETE
PCN 139 F/A/W/T SURFACE:ASPHALT (1016 M-1586 M)
REF AIP TURKIYE AD 2 LTFJ-6,LTFJ ADC
A7640/24
08/08/2024 13:31
PERM
ISTANBUL SABIHA GOKCEN AERODROME
PLEASE AMEND TO READ THE STATEMENT 'ARP COORDINATES AND SITE AT AD:
405354N-0291833E/BTN TWY L AND TWY M' IN AIP LTFJ AD 2.2.1 AS 'ARP
COORDINATES AND SITE AT AD: 405354N-0291833E/BTN TWY C5 AND TWY C6'.
REF AIP AD 2 LTFJ-1
Start Date UTC
08/08/2024 13:31
Conditions
ISTANBUL SABIHA GOKCEN AERODROME
PLEASE AMEND TO READ THE STATEMENT 'ARP COORDINATES AND SITE AT AD:
405354N-0291833E/BTN TWY L AND TWY M' IN AIP LTFJ AD 2.2.1 AS 'ARP
COORDINATES AND SITE AT AD: 405354N-0291833E/BTN TWY C5 AND TWY C6'.
REF AIP AD 2 LTFJ-1