A0478/25
02/12/2025 07:49
05/12/2025 23:59
HELICOPTER FLIGHTS TO/FROM HELICOPTER LANDING AREAS/PLATFORMS
IN COORDINATES,
375648.54N 0235411.66E (SUPERIOR AIR),
375302.70N 0235519.70E (BELLAVIA AVIATION),
375307.00N 0235438.50E (JETWAY AVIATION),
WITHIN LGAV ATZ, ARE SUSPENDED.
Start Date UTC
02/12/2025 07:49
End Date UTC
05/12/2025 23:59
Conditions
HELICOPTER FLIGHTS TO/FROM HELICOPTER LANDING AREAS/PLATFORMS
IN COORDINATES,
375648.54N 0235411.66E (SUPERIOR AIR),
375302.70N 0235519.70E (BELLAVIA AVIATION),
375307.00N 0235438.50E (JETWAY AVIATION),
WITHIN LGAV ATZ, ARE SUSPENDED.
A0308/25
02/03/2025 12:26
05/04/2025 21:00
REF AIP GREECE AD2 LGAV AOC A-2 MOBILE OBJECTS(CRANES) ERECTED:
-CRANE 1 COORD: 375219.50N 0235115.29E 58M AGL 202M AMSL ROTATING
JIB 45M
-CRANE 2 COORD: 375218.85N 0235216.79E MAX HGT 72M AGL 215M AMSL.
Start Date UTC
02/03/2025 12:26
End Date UTC
05/04/2025 21:00
Conditions
REF AIP GREECE AD2 LGAV AOC A-2 MOBILE OBJECTS(CRANES) ERECTED:
-CRANE 1 COORD: 375219.50N 0235115.29E 58M AGL 202M AMSL ROTATING
JIB 45M
-CRANE 2 COORD: 375218.85N 0235216.79E MAX HGT 72M AGL 215M AMSL.
V0040/25
02/20/2025 00:01
04/17/2025 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 21R BIBEX 1G, DDM 1G, KEA 2G, KOR 1G, KRO 1G, ROPOX 1G; RENAME KRO 1G TO KRO 2G IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION. ON PLANVIEW, DMM 1G TO DDM VOR/DME SHOULD READ DDM 1G.
Start Date UTC
02/20/2025 00:01
End Date UTC
04/17/2025 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 21R BIBEX 1G, DDM 1G, KEA 2G, KOR 1G, KRO 1G, ROPOX 1G; RENAME KRO 1G TO KRO 2G IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION. ON PLANVIEW, DMM 1G TO DDM VOR/DME SHOULD READ DDM 1G.
V0041/25
02/20/2025 00:01
04/17/2025 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED RWY 21L BIBEX 2F, DDM 1F, KEA 2F, KOR 1F, KRO 1F, ROPOX 1F DEP; RENAME KRO 1F TO KRO 2F IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION.
Start Date UTC
02/20/2025 00:01
End Date UTC
04/17/2025 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED RWY 21L BIBEX 2F, DDM 1F, KEA 2F, KOR 1F, KRO 1F, ROPOX 1F DEP; RENAME KRO 1F TO KRO 2F IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION.
V0042/25
02/20/2025 00:01
04/17/2025 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 03R BIBEX 2T, DDM 2T, KEA 2T, KOR 2T, KRO 2T, ROPOX 2T DEP; RENAME KRO 2T TO KRO 3T IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION.
Start Date UTC
02/20/2025 00:01
End Date UTC
04/17/2025 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 03R BIBEX 2T, DDM 2T, KEA 2T, KOR 2T, KRO 2T, ROPOX 2T DEP; RENAME KRO 2T TO KRO 3T IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION.
V0050/25
02/20/2025 15:15
04/17/2025 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 21R BIBEX 1G, DDM 1G, KEA 2G, KOR 1G, KRO 1G, ROPOX 1G; RENAME KRO 1G TO KRO 2G IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION. ON PLANVIEW, DMM 1G TO DDM VOR/DME SHOULD READ DDM 1G.
Start Date UTC
02/20/2025 15:15
End Date UTC
04/17/2025 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 21R BIBEX 1G, DDM 1G, KEA 2G, KOR 1G, KRO 1G, ROPOX 1G; RENAME KRO 1G TO KRO 2G IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION. ON PLANVIEW, DMM 1G TO DDM VOR/DME SHOULD READ DDM 1G.
V0051/25
02/20/2025 15:16
04/17/2025 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 21L BIBEX 2F, DDM 1F, KEA 2F, KOR 1F, KRO 1F, ROPOX 1F DEP; RENAME KRO 1F TO KRO 2F IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION.
Start Date UTC
02/20/2025 15:16
End Date UTC
04/17/2025 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 21L BIBEX 2F, DDM 1F, KEA 2F, KOR 1F, KRO 1F, ROPOX 1F DEP; RENAME KRO 1F TO KRO 2F IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION.
V0052/25
02/20/2025 15:18
04/17/2025 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 03R BIBEX 2T, DDM 2T, KEA 2T, KOR 2T, KRO 2T, ROPOX 2T DEP; RENAME KRO 2T TO KRO 3T IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION.
Start Date UTC
02/20/2025 15:18
End Date UTC
04/17/2025 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 03R BIBEX 2T, DDM 2T, KEA 2T, KOR 2T, KRO 2T, ROPOX 2T DEP; RENAME KRO 2T TO KRO 3T IN PROCEDURE TITLE, ON PLANVIEW, AND WITHIN DEPARTURE ROUTE DESCRIPTION.
A0030/25
01/08/2025 08:12
04/09/2025 06:00
VENIZELOS RADIO G/A/G FREQ 5637KHZ AND 2989KHZ U/S
Start Date UTC
01/08/2025 08:12
End Date UTC
04/09/2025 06:00
Conditions
VENIZELOS RADIO G/A/G FREQ 5637KHZ AND 2989KHZ U/S
A0358/25
03/20/2025 00:00
04/02/2025 23:59
TRIGGER NOTAM-PERM AIP AIRAC AMDT 02/25 WEF 20 MAR 25.
UPDATED INFO IN:
- AD 2-LGAV-ASMAC
- AD 2-LGAV-STAR-1
- AD 2-LGAV-STAR-3.
Start Date UTC
03/20/2025 00:00
End Date UTC
04/02/2025 23:59
Conditions
TRIGGER NOTAM-PERM AIP AIRAC AMDT 02/25 WEF 20 MAR 25.
UPDATED INFO IN:
- AD 2-LGAV-ASMAC
- AD 2-LGAV-STAR-1
- AD 2-LGAV-STAR-3.
A4880/24
01/01/2025 00:00
03/31/2025 23:59
CONCENTRATION OF BIRDS INCLUDING FALCONS, BUZZARDS, HARRIERS,
GULLS, WATERFOWL, WADERS, DOVES, STARLINGS AND OTHERS SMALL
PASSERINES IN THE VICINITY OF THE AIRPORT. FOR DETAILS REF AIP
GREECE ENR 5.6 AND AD2-LGAV PARAG 2.23.
Start Date UTC
01/01/2025 00:00
End Date UTC
03/31/2025 23:59
Conditions
CONCENTRATION OF BIRDS INCLUDING FALCONS, BUZZARDS, HARRIERS,
GULLS, WATERFOWL, WADERS, DOVES, STARLINGS AND OTHERS SMALL
PASSERINES IN THE VICINITY OF THE AIRPORT. FOR DETAILS REF AIP
GREECE ENR 5.6 AND AD2-LGAV PARAG 2.23.
A4983/24
12/31/2024 10:54
03/31/2025 23:59
ADVANCED METHODS (HANDHELD AVIAN LASER DETTERENT) ARE USED FOR
WILDLIFE DISPRESAL.
Start Date UTC
12/31/2024 10:54
End Date UTC
03/31/2025 23:59
Conditions
ADVANCED METHODS (HANDHELD AVIAN LASER DETTERENT) ARE USED FOR
WILDLIFE DISPRESAL.
A4984/24
12/31/2024 10:56
03/31/2025 23:59
APRON AREAS ADJUSENT TO HANGARS ARE OPERATING UNDER THE
RESPONSIBILITY OF THE HANGAR TENANTS. FOLLOW ME GUIDANCE WILL BE
PROVIDED FROM/TO THE HANGAR APRONS BOUNDARY.
Start Date UTC
12/31/2024 10:56
End Date UTC
03/31/2025 23:59
Conditions
APRON AREAS ADJUSENT TO HANGARS ARE OPERATING UNDER THE
RESPONSIBILITY OF THE HANGAR TENANTS. FOLLOW ME GUIDANCE WILL BE
PROVIDED FROM/TO THE HANGAR APRONS BOUNDARY.
A0164/25
01/23/2025 10:47
03/23/2025 20:00
ATHINAI ILS 21R(1-EVR)LLZ 110,5 MHZ PART OF ILS IS OUT OF USABLE
LIMITS FOR ANGLES GREATER THAN 32 DEGREES FROM LINE IN THE FLY LEFT
REGION OF CLEARANCE.
Start Date UTC
01/23/2025 10:47
End Date UTC
03/23/2025 20:00
Conditions
ATHINAI ILS 21R(1-EVR)LLZ 110,5 MHZ PART OF ILS IS OUT OF USABLE
LIMITS FOR ANGLES GREATER THAN 32 DEGREES FROM LINE IN THE FLY LEFT
REGION OF CLEARANCE.
A0165/25
01/23/2025 10:49
03/23/2025 20:00
ATHINAI ILS/LLZ RWY 03L(I-ATL) 110,50MHZ PART OF ILS IS OUT OF
USABLE LIMITS FOR ANGLES GREATER THAN 33 DEGREES FROM CENTER LINE
ON BOTH FLY LEFT AND FLY RIGHT REGIONS OF CLEARANCE.
REF AIP GREECE AD 2 LGAV-9.
Start Date UTC
01/23/2025 10:49
End Date UTC
03/23/2025 20:00
Conditions
ATHINAI ILS/LLZ RWY 03L(I-ATL) 110,50MHZ PART OF ILS IS OUT OF
USABLE LIMITS FOR ANGLES GREATER THAN 33 DEGREES FROM CENTER LINE
ON BOTH FLY LEFT AND FLY RIGHT REGIONS OF CLEARANCE.
REF AIP GREECE AD 2 LGAV-9.
A0548/25
02/17/2025 10:45
03/23/2025 20:00
ATHINAI ILS RWY 21L (IEVL) LOC: 111.10MHZ OPERATIONAL WITH THE
FOLLOWING RESTRICTIONS:
1. CLEARANCE RESTRICTED APPROXIMATELY ON BOTH SIDES 32 DEGREES.
2. FALSE COURSE AT SECTOR 18 DEGREES TO 20 DEGREES (FLY LEFT)
DME CH 48X OPERATIONAL. GP 331.70 MHZ UNSERVICEABLE. AD2 LGAV-9.
Start Date UTC
02/17/2025 10:45
End Date UTC
03/23/2025 20:00
Conditions
ATHINAI ILS RWY 21L (IEVL) LOC: 111.10MHZ OPERATIONAL WITH THE
FOLLOWING RESTRICTIONS:
1. CLEARANCE RESTRICTED APPROXIMATELY ON BOTH SIDES 32 DEGREES.
2. FALSE COURSE AT SECTOR 18 DEGREES TO 20 DEGREES (FLY LEFT)
DME CH 48X OPERATIONAL. GP 331.70 MHZ UNSERVICEABLE. AD2 LGAV-9.
V0634/24
12/26/2024 15:14
03/20/2025 00:01
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z OR LOC Z RWY 03L.
Start Date UTC
12/26/2024 15:14
End Date UTC
03/20/2025 00:01
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z OR LOC Z RWY 03L.
V0635/24
12/26/2024 15:15
03/20/2025 00:01
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z OR LOC Z RWY 03R.
Start Date UTC
12/26/2024 15:15
End Date UTC
03/20/2025 00:01
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z OR LOC Z RWY 03R.
V0636/24
12/26/2024 15:16
03/20/2025 00:01
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS OR LOC RWY 21R.
Start Date UTC
12/26/2024 15:16
End Date UTC
03/20/2025 00:01
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS OR LOC RWY 21R.
A4886/24
12/13/2024 14:00
03/13/2025 21:00
REF AIP GREECE AD2 LGAV AOC B-1 MOBILE OBJECTS (CRANES) ERECTED
-CRANE 1 COORDS 0375635.58, 0235226.07 33,5M AGL 157,05M AMSL
ROTATING JIB 60,4M
-CRANE 2 COORDS 0375635.06, 0235229.63 MAX HEIGHT 23,9M AGL 147,9M
AMSL, ROTATING JIB 55M
Start Date UTC
12/13/2024 14:00
End Date UTC
03/13/2025 21:00
Conditions
REF AIP GREECE AD2 LGAV AOC B-1 MOBILE OBJECTS (CRANES) ERECTED
-CRANE 1 COORDS 0375635.58, 0235226.07 33,5M AGL 157,05M AMSL
ROTATING JIB 60,4M
-CRANE 2 COORDS 0375635.06, 0235229.63 MAX HEIGHT 23,9M AGL 147,9M
AMSL, ROTATING JIB 55M
A0389/25
02/12/2025 08:00
03/12/2025 08:00
ESTABLISHMENT OF A PERMANENT AND AUTOMATIC DATA EXCHANGE WITH THE
NETWORK MANAGEMENT OPERATIONS CENTRE AS AN AAT AIRPORT (ADVANCED ATC
TOWER ).A-DPI AND C-DPI MESSAGES ARE SENT TO NMOC AND WILL BE USED
FOR AIR TRAFFIC FLOW MANAGEMENT (ATFM)PURPOSES.AOBT(ACTUAL OFF BLOCKS
TIME)FOR ALL DEPARTING IFR FLIGHTS WILL BE AUTOMATICALLY TRANSMITTED
BY AODB (AIRPORTS OPERATIONAL DATA BASE ).
Start Date UTC
02/12/2025 08:00
End Date UTC
03/12/2025 08:00
Conditions
ESTABLISHMENT OF A PERMANENT AND AUTOMATIC DATA EXCHANGE WITH THE
NETWORK MANAGEMENT OPERATIONS CENTRE AS AN AAT AIRPORT (ADVANCED ATC
TOWER ).A-DPI AND C-DPI MESSAGES ARE SENT TO NMOC AND WILL BE USED
FOR AIR TRAFFIC FLOW MANAGEMENT (ATFM)PURPOSES.AOBT(ACTUAL OFF BLOCKS
TIME)FOR ALL DEPARTING IFR FLIGHTS WILL BE AUTOMATICALLY TRANSMITTED
BY AODB (AIRPORTS OPERATIONAL DATA BASE ).
A0474/25
02/11/2025 08:43
03/10/2025 17:00
ATHINAI ILS/DME IATR LLZ 111.10MHZ DME CH48X OPERATIONAL, GP
331.70MHZ U/S. AIP AD2 LGAV-9.
Start Date UTC
02/11/2025 08:43
End Date UTC
03/10/2025 17:00
Conditions
ATHINAI ILS/DME IATR LLZ 111.10MHZ DME CH48X OPERATIONAL, GP
331.70MHZ U/S. AIP AD2 LGAV-9.
A0187/25
02/02/2025 00:00
02/28/2025 23:59
PPR FOR LONG STAY MORE THAN 12 HR OF ANY ACFT IN ATHINAI
ELEFTHERIOS VENIZELOS INTL APT. DUE TO INCREASED NUMBER OF ACFT ON
GROUND
Start Date UTC
02/02/2025 00:00
End Date UTC
02/28/2025 23:59
Conditions
PPR FOR LONG STAY MORE THAN 12 HR OF ANY ACFT IN ATHINAI
ELEFTHERIOS VENIZELOS INTL APT. DUE TO INCREASED NUMBER OF ACFT ON
GROUND
A0283/25
01/31/2025 15:44
02/28/2025 23:59
LOCAL PRE-TRIAL A-CDM OPERATIONAL PROCEDURES ARE IN FORCE AT
AIRPORT.
-GROUND HANDLER (GH) ARE TO REPORT AND UPDATE TOBT (TARGET OFF-
BLOCK TIME).
-TSAT (TARGET START-UP APPROVAL TIME) WILL BE COMMUNICATED TO
AIRSPACE USER BY GROUND HANDLER (GH).
-WHERE A-VDGS (ADVANCED VISUAL DOCKING GUIDANCE SYSTEM) IS AVAILABLE
TOBT AND TSAT WILL BE DISPLAYED.
-THE PILOT SHALL REQUEST AN UPDATE TO THE TOBT FROM THE GROUND
HANDLER (GH) IF THE TOBT CANNOT BE MET AT ANY MOMENT.
-THE PILOT SHALL ENSURE THAT THE AIRCRAFT WILL BE READY FOR START UP
CLEARANCE AND WILL HAVE CONTACT ON THE DELIVERY FREQUENCY WITHIN THE
TSAT WINDOW (+/-5 MINS).
-DEPARTURE CLEARANCE (EXCEPT SQUAWK) SHALL BE AVAILABLE 18 MINUTES
BEFORE EOBT OR LATER.
- THE PILOT SHALL CONTACT GROUND CONTROL FOR PUSH BACK OR TAXI
WITHIN 5 MIN FROM OBTAINING START UP CLEARANCE (ASAT).
- IF NO PUSH BACK OR TAXI REQUESTED AT ASAT+5, TSAT WILL EXPIRE, AND
A NEW TOBT WILL BE REQUIRED FOR THE FLIGHT TO BE INCLUDED IN THE
DEPARTURE SEQUENCE AND RECEIVE A NEW TSAT.
-PUSH AND HOLD PROCEDURES WILL BE USED TO AVOID HOLDING ARRIVING
AIRCRAFT IN CASE OF OCCUPIED STANDS.
Start Date UTC
01/31/2025 15:44
End Date UTC
02/28/2025 23:59
Conditions
LOCAL PRE-TRIAL A-CDM OPERATIONAL PROCEDURES ARE IN FORCE AT
AIRPORT.
-GROUND HANDLER (GH) ARE TO REPORT AND UPDATE TOBT (TARGET OFF-
BLOCK TIME).
-TSAT (TARGET START-UP APPROVAL TIME) WILL BE COMMUNICATED TO
AIRSPACE USER BY GROUND HANDLER (GH).
-WHERE A-VDGS (ADVANCED VISUAL DOCKING GUIDANCE SYSTEM) IS AVAILABLE
TOBT AND TSAT WILL BE DISPLAYED.
-THE PILOT SHALL REQUEST AN UPDATE TO THE TOBT FROM THE GROUND
HANDLER (GH) IF THE TOBT CANNOT BE MET AT ANY MOMENT.
-THE PILOT SHALL ENSURE THAT THE AIRCRAFT WILL BE READY FOR START UP
CLEARANCE AND WILL HAVE CONTACT ON THE DELIVERY FREQUENCY WITHIN THE
TSAT WINDOW (+/-5 MINS).
-DEPARTURE CLEARANCE (EXCEPT SQUAWK) SHALL BE AVAILABLE 18 MINUTES
BEFORE EOBT OR LATER.
- THE PILOT SHALL CONTACT GROUND CONTROL FOR PUSH BACK OR TAXI
WITHIN 5 MIN FROM OBTAINING START UP CLEARANCE (ASAT).
- IF NO PUSH BACK OR TAXI REQUESTED AT ASAT+5, TSAT WILL EXPIRE, AND
A NEW TOBT WILL BE REQUIRED FOR THE FLIGHT TO BE INCLUDED IN THE
DEPARTURE SEQUENCE AND RECEIVE A NEW TSAT.
-PUSH AND HOLD PROCEDURES WILL BE USED TO AVOID HOLDING ARRIVING
AIRCRAFT IN CASE OF OCCUPIED STANDS.
A0388/25
02/07/2025 09:50
02/28/2025 23:59
RWY 03L/21R AND 03R/21L FOAMING EQUIPMENT U/S.
Start Date UTC
02/07/2025 09:50
End Date UTC
02/28/2025 23:59
Conditions
RWY 03L/21R AND 03R/21L FOAMING EQUIPMENT U/S.