4/0345
03/22/2024 13:45
03/22/2026 13:45
IAP NORFOLK INTL, NORFOLK, VA.
ILS OR LOC RWY 23, AMDT 8A...
ILS OR LOC RWY 5, AMDT 26G...
RNAV (GPS) RWY 14, AMDT 1...
RNAV (GPS) Z RWY 23, AMDT 2...
RNAV (GPS) Z RWY 5, AMDT 2A...
VOR RWY 14, AMDT 3...
CIRCLING RWY 32 NA AT NIGHT.
2403221345-2603221345EST
Start Date UTC
03/22/2024 13:45
End Date UTC
03/22/2026 13:45
Conditions
IAP NORFOLK INTL, NORFOLK, VA.
ILS OR LOC RWY 23, AMDT 8A...
ILS OR LOC RWY 5, AMDT 26G...
RNAV (GPS) RWY 14, AMDT 1...
RNAV (GPS) Z RWY 23, AMDT 2...
RNAV (GPS) Z RWY 5, AMDT 2A...
VOR RWY 14, AMDT 3...
CIRCLING RWY 32 NA AT NIGHT.
2403221345-2603221345EST
4/0346
03/22/2024 13:45
03/22/2026 13:45
IAP NORFOLK INTL, NORFOLK, VA.
RNAV (GPS) RWY 32, ORIG-F...
VOR/DME RWY 32, AMDT 4F...
RWY 32 HELICOPTER VISIBILITY REDUCTION BELOW 1 SM NA.
PROCEDURE NA AT NIGHT.
2403221345-2603221345EST
Start Date UTC
03/22/2024 13:45
End Date UTC
03/22/2026 13:45
Conditions
IAP NORFOLK INTL, NORFOLK, VA.
RNAV (GPS) RWY 32, ORIG-F...
VOR/DME RWY 32, AMDT 4F...
RWY 32 HELICOPTER VISIBILITY REDUCTION BELOW 1 SM NA.
PROCEDURE NA AT NIGHT.
2403221345-2603221345EST
4/2486
04/18/2024 13:11
11/30/2025 13:11
IAP NORFOLK INTL, NORFOLK, VA.
ILS OR LOC RWY 5, AMDT 26G...
RNAV (GPS) Z RWY 5, AMDT 2A...
RNAV (RNP) Y RWY 5, AMDT 1...
PROCEDURES NA, RWY 05 CONSTRUCTION PROJECT.
2404181311-2511301311EST
Start Date UTC
04/18/2024 13:11
End Date UTC
11/30/2025 13:11
Conditions
IAP NORFOLK INTL, NORFOLK, VA.
ILS OR LOC RWY 5, AMDT 26G...
RNAV (GPS) Z RWY 5, AMDT 2A...
RNAV (RNP) Y RWY 5, AMDT 1...
PROCEDURES NA, RWY 05 CONSTRUCTION PROJECT.
2404181311-2511301311EST
4/2487
04/18/2024 13:11
11/30/2025 13:11
IAP NORFOLK INTL, NORFOLK, VA.
ILS OR LOC RWY 23, AMDT 8A...
RNAV (GPS) RWY 14, AMDT 1...
RNAV (GPS) RWY 32, ORIG-F...
RNAV (GPS) Z RWY 23, AMDT 2...
VOR RWY 14, AMDT 3...
VOR/DME RWY 32, AMDT 4F...
CIRCLING RWY 05 NA, RWY 05 CONSTRUCTION PROJECT.
2404181311-2511301311EST
Start Date UTC
04/18/2024 13:11
End Date UTC
11/30/2025 13:11
Conditions
IAP NORFOLK INTL, NORFOLK, VA.
ILS OR LOC RWY 23, AMDT 8A...
RNAV (GPS) RWY 14, AMDT 1...
RNAV (GPS) RWY 32, ORIG-F...
RNAV (GPS) Z RWY 23, AMDT 2...
VOR RWY 14, AMDT 3...
VOR/DME RWY 32, AMDT 4F...
CIRCLING RWY 05 NA, RWY 05 CONSTRUCTION PROJECT.
2404181311-2511301311EST
4/2488
04/18/2024 13:11
11/30/2025 13:11
ODP NORFOLK INTL, NORFOLK, VA.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT ...
TAKEOFF MINIMUMS: RWY 23, WITH STANDARD TAKEOFF MINIMUMS AND A NORMAL 200 FT PER NM CLIMB GRADIENT, TAKEOFF MUST OCCUR NO LATER THAN TEMPORARY RWY 05 THLD. TAKEOFF OBSTACLE NOTES: RWY 23, CONSTRUCTION EQUIPMENT, 1000 FT FROM TEMPORARY DER, ON CENTERLINE, UP TO 15 FT AGL/36 FT MSL. MULTIPLE TOWERS BEGINNING 166 FT FROM DER AND 396 FT LEFT OF CENTERLINE UP TO 31 FT AGL/55 FT MSL, POLE 314 FT FROM DER 528 FT LEFT OF CENTERLINE 16 FT AGL/40 FT MSL., MULTIPLE POLES BEGINNING 894 FT FROM DER AND 642 FT RIGHT OF CENTERLINE UP TO 73 FT AGL/97 FT MSL, MULTIPLE TREES BEGINNING 1263 FT FROM DER AND 765 FT RIGHT OF CENTERLINE UP TO 77 FT AGL/101 FT MSL, TREE 1664 FT FROM DER 932 FT LEFT OF CENTERLINE 43 FT AGL/67 FT MSL., MULTIPLE TREES BEGINNING 2312 FT FROM DER AND 760 FT RIGHT OF CENTERLINE UP TO 95 FT AGL/119 FT MSL, MULTIPLE TREES BEGINNING 2750 FT FROM DER AND 897 FT LEFT OF CENTERLINE UP TO 84 FT AGL/108 FT MSL ALL OTHER DATA REMAINS AS PUBLISHED. 2404181311-2511301311EST
Start Date UTC
04/18/2024 13:11
End Date UTC
11/30/2025 13:11
Conditions
ODP NORFOLK INTL, NORFOLK, VA.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT ...
TAKEOFF MINIMUMS: RWY 23, WITH STANDARD TAKEOFF MINIMUMS AND A NORMAL 200 FT PER NM CLIMB GRADIENT, TAKEOFF MUST OCCUR NO LATER THAN TEMPORARY RWY 05 THLD. TAKEOFF OBSTACLE NOTES: RWY 23, CONSTRUCTION EQUIPMENT, 1000 FT FROM TEMPORARY DER, ON CENTERLINE, UP TO 15 FT AGL/36 FT MSL. MULTIPLE TOWERS BEGINNING 166 FT FROM DER AND 396 FT LEFT OF CENTERLINE UP TO 31 FT AGL/55 FT MSL, POLE 314 FT FROM DER 528 FT LEFT OF CENTERLINE 16 FT AGL/40 FT MSL., MULTIPLE POLES BEGINNING 894 FT FROM DER AND 642 FT RIGHT OF CENTERLINE UP TO 73 FT AGL/97 FT MSL, MULTIPLE TREES BEGINNING 1263 FT FROM DER AND 765 FT RIGHT OF CENTERLINE UP TO 77 FT AGL/101 FT MSL, TREE 1664 FT FROM DER 932 FT LEFT OF CENTERLINE 43 FT AGL/67 FT MSL., MULTIPLE TREES BEGINNING 2312 FT FROM DER AND 760 FT RIGHT OF CENTERLINE UP TO 95 FT AGL/119 FT MSL, MULTIPLE TREES BEGINNING 2750 FT FROM DER AND 897 FT LEFT OF CENTERLINE UP TO 84 FT AGL/108 FT MSL ALL OTHER DATA REMAINS AS PUBLISHED. 2404181311-2511301311EST
4/4520
09/12/2024 18:08
11/29/2025 18:08
SID NORFOLK INTL, NORFOLK, VA.
KISRR THREE DEPARTURE...
TAKE-OFF MINIMUMS: RWY 05, 300-1 1/4 OR STANDARD WITH MINIMUM CLIMB OF 307FT PER NM TO 300. TEMPORARY CRANE 1.03NM FROM DER, 1306FT RIGHT OF CENTERLINE, 187FT AGL/187FT MSL (2024-AEA-1290-OE).
ALL OTHER DATA REMAINS AS PUBLISHED. 2409121808-2511291808EST
Start Date UTC
09/12/2024 18:08
End Date UTC
11/29/2025 18:08
Conditions
SID NORFOLK INTL, NORFOLK, VA.
KISRR THREE DEPARTURE...
TAKE-OFF MINIMUMS: RWY 05, 300-1 1/4 OR STANDARD WITH MINIMUM CLIMB OF 307FT PER NM TO 300. TEMPORARY CRANE 1.03NM FROM DER, 1306FT RIGHT OF CENTERLINE, 187FT AGL/187FT MSL (2024-AEA-1290-OE).
ALL OTHER DATA REMAINS AS PUBLISHED. 2409121808-2511291808EST
4/4518
09/12/2024 18:07
11/29/2025 18:06
ODP NORFOLK INTL, NORFOLK, VA.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 1...
TAKE-OFF MINIMUMS: RWY 05, 300-1 1/4 OR STANDARD WITH MINIMUM CLIMB OF 307FT PER NM TO 300. TEMPORARY CRANE 1.03NM FROM DER, 1306FT RIGHT OF CENTERLINE, 187FT AGL/187FT MSL (2024-AEA-1290-OE). ADD TAKEOFF OBSTACLE NOTE: RWY 5, TEMPORARY CRANE 1.47NM FROM DER, 831FT RIGHT OF CENTERLINE, 181FT AGL/190FT MSL (2022-AEA-16714-OE).
ALL OTHER DATA REMAINS AS PUBLISHED. 2409121807-2511291806EST
Start Date UTC
09/12/2024 18:07
End Date UTC
11/29/2025 18:06
Conditions
ODP NORFOLK INTL, NORFOLK, VA.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 1...
TAKE-OFF MINIMUMS: RWY 05, 300-1 1/4 OR STANDARD WITH MINIMUM CLIMB OF 307FT PER NM TO 300. TEMPORARY CRANE 1.03NM FROM DER, 1306FT RIGHT OF CENTERLINE, 187FT AGL/187FT MSL (2024-AEA-1290-OE). ADD TAKEOFF OBSTACLE NOTE: RWY 5, TEMPORARY CRANE 1.47NM FROM DER, 831FT RIGHT OF CENTERLINE, 181FT AGL/190FT MSL (2022-AEA-16714-OE).
ALL OTHER DATA REMAINS AS PUBLISHED. 2409121807-2511291806EST
4/4771
08/07/2024 18:25
10/31/2025 18:23
IAP NORFOLK INTL, NORFOLK, VA.
RNAV (RNP) Y RWY 23, AMDT 1...
RNP 0.10 DA 444/HAT 418 ALL CATS. RNP 0.30 DA 512/HAT 486 ALL CATS. TEMPORARY CRANE 190FT MSL 1.18NM NORTHEAST OF RWY 23 (2022-AEA-16713-OE). TEMPORARY CRANE 187FT MSL 1.03NM NORTHEAST OF RWY 23 (2024-AEA-1290-OE).
2408071825-2510311823EST
Start Date UTC
08/07/2024 18:25
End Date UTC
10/31/2025 18:23
Conditions
IAP NORFOLK INTL, NORFOLK, VA.
RNAV (RNP) Y RWY 23, AMDT 1...
RNP 0.10 DA 444/HAT 418 ALL CATS. RNP 0.30 DA 512/HAT 486 ALL CATS. TEMPORARY CRANE 190FT MSL 1.18NM NORTHEAST OF RWY 23 (2022-AEA-16713-OE). TEMPORARY CRANE 187FT MSL 1.03NM NORTHEAST OF RWY 23 (2024-AEA-1290-OE).
2408071825-2510311823EST
4/8685
08/14/2024 14:15
05/16/2025 14:15
IAP NORFOLK INTL, NORFOLK, VA.
ILS OR LOC RWY 23, AMDT 8A...
ILS OR LOC RWY 5, AMDT 26G...
RNAV (GPS) RWY 14, AMDT 1...
RNAV (GPS) Z RWY 5, AMDT 2A...
VOR RWY 14, AMDT 3...
VOR/DME RWY 32, AMDT 4F...
CIRCLING MDA 560/HAA 533 CAT A/B/C. TEMPORARY CRANE 187FT MSL 1.88NM NORTHEAST OF ORF AIRPORT (2024-AEA-1290-OE). TEMPORARY CRANE 190FT MSL 2.01NM NORTHEAST OF ORF AIRPORT (2022-AEA-16713-OE). TEMPORARY CRANE 190FT MSL 2.02NM NORTHEAST OF ORF AIRPORT (2022-AEA-16714-OE). TEMPORARY CRANE 210FT MSL 1.88NM NORTHEAST OF ORF AIRPORT (2023-AEA-4246-NRA).
2408141415-2505161415EST
Start Date UTC
08/14/2024 14:15
End Date UTC
05/16/2025 14:15
Conditions
IAP NORFOLK INTL, NORFOLK, VA.
ILS OR LOC RWY 23, AMDT 8A...
ILS OR LOC RWY 5, AMDT 26G...
RNAV (GPS) RWY 14, AMDT 1...
RNAV (GPS) Z RWY 5, AMDT 2A...
VOR RWY 14, AMDT 3...
VOR/DME RWY 32, AMDT 4F...
CIRCLING MDA 560/HAA 533 CAT A/B/C. TEMPORARY CRANE 187FT MSL 1.88NM NORTHEAST OF ORF AIRPORT (2024-AEA-1290-OE). TEMPORARY CRANE 190FT MSL 2.01NM NORTHEAST OF ORF AIRPORT (2022-AEA-16713-OE). TEMPORARY CRANE 190FT MSL 2.02NM NORTHEAST OF ORF AIRPORT (2022-AEA-16714-OE). TEMPORARY CRANE 210FT MSL 1.88NM NORTHEAST OF ORF AIRPORT (2023-AEA-4246-NRA).
2408141415-2505161415EST
4/8683
08/14/2024 14:14
05/16/2025 14:14
IAP NORFOLK INTL, NORFOLK, VA.
RNAV (GPS) RWY 32, ORIG-F...
LNAV MDA 520/HAT 495 ALL CATS. LNAV VISIBILITY CAT C/D 1 3/8. CIRCLING MDA 560/HAA 534 CAT A/B/C. VDP NA. TEMPORARY CRANE 187FT MSL 1.88NM NORTHEAST OF ORF AIRPORT (2024-AEA-1290-OE). TEMPORARY CRANE 190FT MSL 2.01NM NORTHEAST OF ORF AIRPORT (2022-AEA-16713-OE). TEMPORARY CRANE 190FT MSL 2.02NM NORTHEAST OF ORF AIRPORT (2022-AEA-16714-OE). TEMPORARY CRANE 210FT MSL 1.88NM NORTHEAST OF ORF AIRPORT (2023-AEA-4246-NRA).
2408141414-2505161414EST
Start Date UTC
08/14/2024 14:14
End Date UTC
05/16/2025 14:14
Conditions
IAP NORFOLK INTL, NORFOLK, VA.
RNAV (GPS) RWY 32, ORIG-F...
LNAV MDA 520/HAT 495 ALL CATS. LNAV VISIBILITY CAT C/D 1 3/8. CIRCLING MDA 560/HAA 534 CAT A/B/C. VDP NA. TEMPORARY CRANE 187FT MSL 1.88NM NORTHEAST OF ORF AIRPORT (2024-AEA-1290-OE). TEMPORARY CRANE 190FT MSL 2.01NM NORTHEAST OF ORF AIRPORT (2022-AEA-16713-OE). TEMPORARY CRANE 190FT MSL 2.02NM NORTHEAST OF ORF AIRPORT (2022-AEA-16714-OE). TEMPORARY CRANE 210FT MSL 1.88NM NORTHEAST OF ORF AIRPORT (2023-AEA-4246-NRA).
2408141414-2505161414EST
10/021
10/04/2024 00:22
04/03/2025 23:59
OBST TOWER LGT (ASR 1016345) 370104.00N0762012.00W (9.7NM NW ORF) 211.9FT (203.1FT AGL) U/S
Start Date UTC
10/04/2024 00:22
End Date UTC
04/03/2025 23:59
Conditions
OBST TOWER LGT (ASR 1016345) 370104.00N0762012.00W (9.7NM NW ORF) 211.9FT (203.1FT AGL) U/S
09/055
09/23/2024 02:27
01/23/2025 23:59
OBST TOWER LGT (ASR 1043704) 365119.00N0761726.00W (4.9NM WSW ORF) 268.0FT (257.9FT AGL) U/S
Start Date UTC
09/23/2024 02:27
End Date UTC
01/23/2025 23:59
Conditions
OBST TOWER LGT (ASR 1043704) 365119.00N0761726.00W (4.9NM WSW ORF) 268.0FT (257.9FT AGL) U/S
07/024
07/09/2024 01:38
12/24/2024 23:59
RWY 23 RAI LGT U/S
Start Date UTC
07/09/2024 01:38
End Date UTC
12/24/2024 23:59
Conditions
RWY 23 RAI LGT U/S
07/025
07/09/2024 02:12
12/17/2024 23:59
RWY 05 ALS 1000FT BAR U/S
Start Date UTC
07/09/2024 02:12
End Date UTC
12/17/2024 23:59
Conditions
RWY 05 ALS 1000FT BAR U/S
09/038
09/15/2024 13:56
12/14/2024 04:00
OBST TOWER LGT (ASR 1207603) 364700.50N0761202.00W (6.7NM S ORF) 470.1FT (453.1FT AGL) U/S
Start Date UTC
09/15/2024 13:56
End Date UTC
12/14/2024 04:00
Conditions
OBST TOWER LGT (ASR 1207603) 364700.50N0761202.00W (6.7NM S ORF) 470.1FT (453.1FT AGL) U/S
09/028
09/11/2024 14:59
12/10/2024 04:00
OBST TOWER LGT (ASR 1016563) 364940.40N0761506.50W (4.8NM SSW ORF) 536.1FT (519.0FT AGL) U/S
Start Date UTC
09/11/2024 14:59
End Date UTC
12/10/2024 04:00
Conditions
OBST TOWER LGT (ASR 1016563) 364940.40N0761506.50W (4.8NM SSW ORF) 536.1FT (519.0FT AGL) U/S
10/011
10/03/2024 04:02
11/17/2024 04:01
OBST TOWER LGT (ASR 1322263) 365710.68N0761802.11W (5.8NM NW ORF) 33FT (30FT AGL) U/S
Start Date UTC
10/03/2024 04:02
End Date UTC
11/17/2024 04:01
Conditions
OBST TOWER LGT (ASR 1322263) 365710.68N0761802.11W (5.8NM NW ORF) 33FT (30FT AGL) U/S
04/128
04/23/2024 09:47
11/15/2024 23:59
AD AP RVR ALL U/S
Start Date UTC
04/23/2024 09:47
End Date UTC
11/15/2024 23:59
Conditions
AD AP RVR ALL U/S
10/004
10/01/2024 06:48
11/15/2024 06:47
OBST TOWER LGT (ASR 1017447) 364327.00N0760118.00W (13.2NM SE ORF) 273.0FT (265.1FT AGL) U/S
Start Date UTC
10/01/2024 06:48
End Date UTC
11/15/2024 06:47
Conditions
OBST TOWER LGT (ASR 1017447) 364327.00N0760118.00W (13.2NM SE ORF) 273.0FT (265.1FT AGL) U/S
04/080
04/18/2024 04:00
11/15/2024 00:01
NAV ILS RWY 05 U/S
Start Date UTC
04/18/2024 04:00
End Date UTC
11/15/2024 00:01
Conditions
NAV ILS RWY 05 U/S
04/081
04/18/2024 04:00
11/15/2024 00:01
NAV ILS RWY 23 U/S
Start Date UTC
04/18/2024 04:00
End Date UTC
11/15/2024 00:01
Conditions
NAV ILS RWY 23 U/S
04/084
04/18/2024 04:00
11/15/2024 00:01
RWY 05 ALS U/S
Start Date UTC
04/18/2024 04:00
End Date UTC
11/15/2024 00:01
Conditions
RWY 05 ALS U/S
09/030
09/12/2024 17:59
11/01/2024 23:00
RWY 05/23 SW 2201FT CLSD
Start Date UTC
09/12/2024 17:59
End Date UTC
11/01/2024 23:00
Conditions
RWY 05/23 SW 2201FT CLSD
09/031
09/12/2024 18:53
11/01/2024 23:00
TWY A BTN RWY 05/23 AND GA OUTER APN ACCESS CLSD
Start Date UTC
09/12/2024 18:53
End Date UTC
11/01/2024 23:00
Conditions
TWY A BTN RWY 05/23 AND GA OUTER APN ACCESS CLSD
09/032
09/12/2024 18:54
11/01/2024 23:00
TWY A BTN RWY 05/23 AND TWY C CLSD
Start Date UTC
09/12/2024 18:54
End Date UTC
11/01/2024 23:00
Conditions
TWY A BTN RWY 05/23 AND TWY C CLSD
06/077
06/29/2024 10:26
11/01/2024 16:00
RWY 14 RWY END ID LGT U/S
Start Date UTC
06/29/2024 10:26
End Date UTC
11/01/2024 16:00
Conditions
RWY 14 RWY END ID LGT U/S
06/078
06/29/2024 10:26
11/01/2024 16:00
RWY 32 RWY END ID LGT U/S
Start Date UTC
06/29/2024 10:26
End Date UTC
11/01/2024 16:00
Conditions
RWY 32 RWY END ID LGT U/S
08/004
08/01/2024 14:37
11/01/2024 16:00
TWY C HLDG PSN MARKINGS FOR ILS FOR APCH END RWY 23 FADED
Start Date UTC
08/01/2024 14:37
End Date UTC
11/01/2024 16:00
Conditions
TWY C HLDG PSN MARKINGS FOR ILS FOR APCH END RWY 23 FADED
04/096
04/18/2024 04:15
11/01/2024 09:15
TWY C1 CLSD
Start Date UTC
04/18/2024 04:15
End Date UTC
11/01/2024 09:15
04/094
04/18/2024 04:15
11/01/2024 09:15
TWY C2 CLSD
Start Date UTC
04/18/2024 04:15
End Date UTC
11/01/2024 09:15
04/095
04/18/2024 04:15
11/01/2024 09:15
TWY C BTN TWY V AND TWY C1 CLSD
Start Date UTC
04/18/2024 04:15
End Date UTC
11/01/2024 09:15
Conditions
TWY C BTN TWY V AND TWY C1 CLSD
04/098
04/18/2024 04:15
11/01/2024 09:15
TWY J CLSD
Start Date UTC
04/18/2024 04:15
End Date UTC
11/01/2024 09:15
04/097
04/18/2024 04:15
11/01/2024 09:15
TWY C BTN TWY V AND TWY C1 WIP CONST LGTD AND BARRICADED
Start Date UTC
04/18/2024 04:15
End Date UTC
11/01/2024 09:15
Conditions
TWY C BTN TWY V AND TWY C1 WIP CONST LGTD AND BARRICADED
05/064
05/25/2024 09:05
11/01/2024 09:15
RWY 05 TDZ MARKINGS NOT MARKED
Start Date UTC
05/25/2024 09:05
End Date UTC
11/01/2024 09:15
Conditions
RWY 05 TDZ MARKINGS NOT MARKED
04/063
04/18/2024 04:15
11/01/2024 09:00
RWY 05 DECLARED DIST: TORA 6800FT TODA 6800FT ASDA 6608FT LDA 6608FT.
Start Date UTC
04/18/2024 04:15
End Date UTC
11/01/2024 09:00
Conditions
RWY 05 DECLARED DIST: TORA 6800FT TODA 6800FT ASDA 6608FT LDA 6608FT.
04/060
04/18/2024 04:15
11/01/2024 09:00
RWY 23 DECLARED DIST: TORA 6800FT TODA 6800FT ASDA 6800FT LDA 6800FT.
Start Date UTC
04/18/2024 04:15
End Date UTC
11/01/2024 09:00
Conditions
RWY 23 DECLARED DIST: TORA 6800FT TODA 6800FT ASDA 6800FT LDA 6800FT.
4/4743
08/07/2024 17:45
10/31/2024 17:43
IAP NORFOLK INTL, NORFOLK, VA.
RNAV (GPS) Z RWY 23, AMDT 2...
LNAV/VNAV DA 491/HAT 465 ALL CATS. VISIBILITY ALL CATS 1. CIRCLING MDA 560/HAA 533 CAT A/B/C. TEMPORARY CRANE 190FT MSL 1.15NM NORTHEAST OF RWY 23 (2022-AEA-16714-OE). . TEMPORARY CRANE 205FT MSL 5899FT SOUTH OF RWY 23 (2023-AEA-4246-NRA).
2408071745-2410311743EST
Start Date UTC
08/07/2024 17:45
End Date UTC
10/31/2024 17:43
Conditions
IAP NORFOLK INTL, NORFOLK, VA.
RNAV (GPS) Z RWY 23, AMDT 2...
LNAV/VNAV DA 491/HAT 465 ALL CATS. VISIBILITY ALL CATS 1. CIRCLING MDA 560/HAA 533 CAT A/B/C. TEMPORARY CRANE 190FT MSL 1.15NM NORTHEAST OF RWY 23 (2022-AEA-16714-OE). . TEMPORARY CRANE 205FT MSL 5899FT SOUTH OF RWY 23 (2023-AEA-4246-NRA).
2408071745-2410311743EST
10/025
10/11/2024 04:15
10/25/2024 09:15
TWY E BTN RWY 05/23 AND TWY C CLSD
Start Date UTC
10/11/2024 04:15
End Date UTC
10/25/2024 09:15
Conditions
TWY E BTN RWY 05/23 AND TWY C CLSD
10/026
10/07/2024 04:15
10/13/2024 09:15
RWY 05/23 CLSD EXC XNG DLY 0415-0915
Start Date UTC
10/07/2024 04:15
End Date UTC
10/13/2024 09:15
Conditions
RWY 05/23 CLSD EXC XNG DLY 0415-0915
10/023
10/04/2024 09:46
10/11/2024 21:00
OBST POLE (ASN UNKNOWN) 365320N0761228W (0.469NM SSW ORF)
97FT (78FT AGL) NOT LGTD
Start Date UTC
10/04/2024 09:46
End Date UTC
10/11/2024 21:00
Conditions
OBST POLE (ASN UNKNOWN) 365320N0761228W (0.469NM SSW ORF)
97FT (78FT AGL) NOT LGTD
10/024
10/07/2024 04:15
10/11/2024 09:15
TWY F BTN RWY 05/23 AND PRIVATE HANGAR APN CLSD
Start Date UTC
10/07/2024 04:15
End Date UTC
10/11/2024 09:15
Conditions
TWY F BTN RWY 05/23 AND PRIVATE HANGAR APN CLSD
08/076
08/24/2024 20:38
10/08/2024 20:37
OBST TOWER LGT (ASR 1017885) 364945.00N0761225.00W (4.0NM S ORF) 538.1FT (534.8FT AGL) U/S
Start Date UTC
08/24/2024 20:38
End Date UTC
10/08/2024 20:37
Conditions
OBST TOWER LGT (ASR 1017885) 364945.00N0761225.00W (4.0NM S ORF) 538.1FT (534.8FT AGL) U/S
08/065
08/19/2024 10:43
PERM
COM REMOTE COM OUTLET 122.1 U/S
Start Date UTC
08/19/2024 10:43
Conditions
COM REMOTE COM OUTLET 122.1 U/S