M1037/24
09/20/2024 10:18
12/18/2024 17:30
TWY E CLSD SOUTH OF F TWY
LGTD AND BARRICADED
Start Date UTC
09/20/2024 10:18
End Date UTC
12/18/2024 17:30
Conditions
TWY E CLSD SOUTH OF F TWY
LGTD AND BARRICADED
M1020/24
09/18/2024 19:17
12/04/2024 22:00
SFL RWY 28 OTS.
Start Date UTC
09/18/2024 19:17
End Date UTC
12/04/2024 22:00
Conditions
SFL RWY 28 OTS.
M1021/24
09/18/2024 19:40
12/02/2024 22:00
OBST. CRANES RAISED TO 175-260 FT MSL IVO HRBT AND WILLOUGHBY BAY. FLAGGED & LIGHTED.
Start Date UTC
09/18/2024 19:40
End Date UTC
12/02/2024 22:00
Conditions
OBST. CRANES RAISED TO 175-260 FT MSL IVO HRBT AND WILLOUGHBY BAY. FLAGGED & LIGHTED.
M1022/24
09/18/2024 20:08
12/02/2024 22:00
OBST CRANES RAISED ON PIER AREA, WEST OF RWY 10/28, RWY 28, CRANES 1.3NM FROM DER 1600 FT LEFT TO 2000 FT RIGHT OF CENTERLINE AND 1.3 NM FROM DER 2000FT TO 4000 FT RIGHT OF CENTERLINE, 260 FT MSL. CHECK ATIS FOR RESTRICTIONS.
Start Date UTC
09/18/2024 20:08
End Date UTC
12/02/2024 22:00
Conditions
OBST CRANES RAISED ON PIER AREA, WEST OF RWY 10/28, RWY 28, CRANES 1.3NM FROM DER 1600 FT LEFT TO 2000 FT RIGHT OF CENTERLINE AND 1.3 NM FROM DER 2000FT TO 4000 FT RIGHT OF CENTERLINE, 260 FT MSL. CHECK ATIS FOR RESTRICTIONS.
M1024/24
09/19/2024 00:07
12/02/2024 17:00
RWY 28 PAPI OTS.
Start Date UTC
09/19/2024 00:07
End Date UTC
12/02/2024 17:00
Conditions
RWY 28 PAPI OTS.
M1083/24
10/01/2024 21:18
12/02/2024 12:00
OBST UNLIGHTED 450 FT WEST OF S-3 HELIPAD NEAR RAMP EDGE. CAPSIZED SAIL BOAT WITH MAST STICKING OUT ABOVE THE WATER APPROX 15 FT HIGH. USE CAUTION WHILE OPERATING FROM S-3 HELIPAD.
Start Date UTC
10/01/2024 21:18
End Date UTC
12/02/2024 12:00
Conditions
OBST UNLIGHTED 450 FT WEST OF S-3 HELIPAD NEAR RAMP EDGE. CAPSIZED SAIL BOAT WITH MAST STICKING OUT ABOVE THE WATER APPROX 15 FT HIGH. USE CAUTION WHILE OPERATING FROM S-3 HELIPAD.
V0132/24
09/11/2024 15:03
12/01/2024 20:00
RWY 28 RNAV AND PAR WEATHER MINIMUMS ARE 500/1 DUE TO TREES IN THE APPROACH CORRIDOR OF RWY 28
Start Date UTC
09/11/2024 15:03
End Date UTC
12/01/2024 20:00
Conditions
RWY 28 RNAV AND PAR WEATHER MINIMUMS ARE 500/1 DUE TO TREES IN THE APPROACH CORRIDOR OF RWY 28
M0978/24
09/10/2024 19:58
11/15/2024 20:00
MIKE TAXIWAY CLOSED TO AIRCRAFT FIRST 150 FT SOUTH OF FOXTROT, MARKED BY LOW LEVEL LIGHTED BARACADES
Start Date UTC
09/10/2024 19:58
End Date UTC
11/15/2024 20:00
Conditions
MIKE TAXIWAY CLOSED TO AIRCRAFT FIRST 150 FT SOUTH OF FOXTROT, MARKED BY LOW LEVEL LIGHTED BARACADES
M0979/24
09/10/2024 20:02
11/15/2024 20:00
LP NORTH RAMP CONSTRUCTION AREA MARKED BY LIGHTED BARRICADE
Start Date UTC
09/10/2024 20:02
End Date UTC
11/15/2024 20:00
Conditions
LP NORTH RAMP CONSTRUCTION AREA MARKED BY LIGHTED BARRICADE
M0980/24
09/10/2024 20:05
11/15/2024 20:00
EAST LINE CLSD LGTD AND BARRICADED CLSD TO TAXIING AIRCRAFT.
Start Date UTC
09/10/2024 20:05
End Date UTC
11/15/2024 20:00
Conditions
EAST LINE CLSD LGTD AND BARRICADED CLSD TO TAXIING AIRCRAFT.
M0981/24
09/10/2024 20:06
11/15/2024 20:00
TWY E -1 AND HELIPAD C-1 CLOSED
Start Date UTC
09/10/2024 20:06
End Date UTC
11/15/2024 20:00
Conditions
TWY E -1 AND HELIPAD C-1 CLOSED
M0982/24
09/10/2024 20:12
11/01/2024 12:00
AIRCRAFT PARKING IVO LP-1 IS UNAVAILABLE DUE TO CONSTRUCTION. ALL PPR'S FOR LP-1 WILL UTILIZE THE AMC TERMINAL RAMP. NO TRANSIENT HOT FUEL AVAILABLE.
Start Date UTC
09/10/2024 20:12
End Date UTC
11/01/2024 12:00
Conditions
AIRCRAFT PARKING IVO LP-1 IS UNAVAILABLE DUE TO CONSTRUCTION. ALL PPR'S FOR LP-1 WILL UTILIZE THE AMC TERMINAL RAMP. NO TRANSIENT HOT FUEL AVAILABLE.
M0985/24
09/10/2024 22:04
10/14/2024 12:00
KNHU HELIPORT LF AREA: RWY 9/27, LF PARKING RAMP AND LF HELIPORT HOT PIT CLOSED FOR CONSTRUCTION.
Start Date UTC
09/10/2024 22:04
End Date UTC
10/14/2024 12:00
Conditions
KNHU HELIPORT LF AREA: RWY 9/27, LF PARKING RAMP AND LF HELIPORT HOT PIT CLOSED FOR CONSTRUCTION.
M1095/24
10/10/2024 12:00
10/10/2024 19:00
UAS OPS IVO CRANEY ISLAND, SFC-400' AGL. TERMINAL BLVD AND PIER TRANSITIONS ARE UNAVAILABLE.
Start Date UTC
10/10/2024 12:00
End Date UTC
10/10/2024 19:00
Conditions
UAS OPS IVO CRANEY ISLAND, SFC-400' AGL. TERMINAL BLVD AND PIER TRANSITIONS ARE UNAVAILABLE.
M1094/24
10/09/2024 18:00
10/09/2024 20:00
UAS OPS IVO N & S ISLAND HRBT, SFC-250' AGL. PRIDE TWO DEP AND POINT ALPHA ARE UNAVAILABLE.
Start Date UTC
10/09/2024 18:00
End Date UTC
10/09/2024 20:00
Conditions
UAS OPS IVO N & S ISLAND HRBT, SFC-250' AGL. PRIDE TWO DEP AND POINT ALPHA ARE UNAVAILABLE.
M1093/24
10/09/2024 12:00
10/09/2024 19:00
UAS OPS IVO CRANEY ISLAND, SFC-400' AGL. TERMINAL BLVD AND PIER TRANSITIONS ARE UNAVAILABLE.
Start Date UTC
10/09/2024 12:00
End Date UTC
10/09/2024 19:00
Conditions
UAS OPS IVO CRANEY ISLAND, SFC-400' AGL. TERMINAL BLVD AND PIER TRANSITIONS ARE UNAVAILABLE.
M1090/24
10/09/2024 13:00
10/09/2024 18:00
S-4 RESERVED FOR LSE OPERATIONS
Start Date UTC
10/09/2024 13:00
End Date UTC
10/09/2024 18:00
Conditions
S-4 RESERVED FOR LSE OPERATIONS
M1092/24
10/08/2024 12:00
10/08/2024 19:00
UAS OPS IVO CRANEY ISLAND, SFC-400' AGL. TERMINAL BLVD AND PIER TRANSITIONS ARE UNAVAILABLE.
Start Date UTC
10/08/2024 12:00
End Date UTC
10/08/2024 19:00
Conditions
UAS OPS IVO CRANEY ISLAND, SFC-400' AGL. TERMINAL BLVD AND PIER TRANSITIONS ARE UNAVAILABLE.
M1088/24
10/07/2024 20:30
10/08/2024 02:30
S-4 RESERVED FOR VERTREPS.
Start Date UTC
10/07/2024 20:30
End Date UTC
10/08/2024 02:30
Conditions
S-4 RESERVED FOR VERTREPS.
M1096/24
10/07/2024 21:00
10/08/2024 01:00
SAR JUMPS IVO POINT JULIET J, 2/H60 OPERATING 500 FT AGL AND BELOW.
Start Date UTC
10/07/2024 21:00
End Date UTC
10/08/2024 01:00
Conditions
SAR JUMPS IVO POINT JULIET J, 2/H60 OPERATING 500 FT AGL AND BELOW.
M1091/24
10/07/2024 18:00
10/07/2024 20:00
UAS OPS IVO N & S ISLAND HRBT, SFC-250' AGL. PRIDE TWO DEP AND POINT ALPHA ARE UNAVAILABLE.
Start Date UTC
10/07/2024 18:00
End Date UTC
10/07/2024 20:00
Conditions
UAS OPS IVO N & S ISLAND HRBT, SFC-250' AGL. PRIDE TWO DEP AND POINT ALPHA ARE UNAVAILABLE.