A3145/24
09/30/2024 05:00
12/29/2024 17:00
LIFEX MINE, MPUMALANGA (255335S 0290926E, 255342S 0291046E, 255513S
0291037E, 255549S 0290901E): REMOTELY PILOTED AIRCRAFT SYSTEMS (RPAS)
OPS (1000FT AGL) TAKING PLACE BEYOND VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/30/2024 05:00
End Date UTC
12/29/2024 17:00
Conditions
LIFEX MINE, MPUMALANGA (255335S 0290926E, 255342S 0291046E, 255513S
0291037E, 255549S 0290901E): REMOTELY PILOTED AIRCRAFT SYSTEMS (RPAS)
OPS (1000FT AGL) TAKING PLACE BEYOND VISUAL LINE OF SIGHT (BVLOS).
A3022/24
09/17/2024 10:25
12/13/2024 10:00
IAC ILS-02 ILS Y RWY 03L DATED 18 AUG 2016 SUSPENDED.
IAC ILS-05 ILS X RWY 03R DATED 21 AUG 2014 SUSPENDED.
IAC ILS-06 ILS W RWY 03R DATED 21 AUG 2014 SUSPENDED.
IAC VOR-01 VOR Z RWY 21R DATED 04 APR 2013 SUSPENDED.
IAC VOR-02 VOR Y RWY 21R DATED 10 JAN 2013 SUSPENDED.
Start Date UTC
09/17/2024 10:25
End Date UTC
12/13/2024 10:00
Conditions
IAC ILS-02 ILS Y RWY 03L DATED 18 AUG 2016 SUSPENDED.
IAC ILS-05 ILS X RWY 03R DATED 21 AUG 2014 SUSPENDED.
IAC ILS-06 ILS W RWY 03R DATED 21 AUG 2014 SUSPENDED.
IAC VOR-01 VOR Z RWY 21R DATED 04 APR 2013 SUSPENDED.
IAC VOR-02 VOR Y RWY 21R DATED 10 JAN 2013 SUSPENDED.
A3023/24
09/17/2024 10:26
12/13/2024 10:00
STAR ARR-01 RWY 03 AVAGO 2 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-02 RWY 03R NIBEX 2 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-03 RWY 03R STANDERTON 6 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-05 RWY 03R WITBANK 4 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-07 RWY 03R AVILO 1 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-12 RWY 03R RNAV (GNSS) AVILO 1B DATED 31 DEC 2020 SUSPENDED.
AERONAUTICAL DATA TABULATION ARR-12A RNAV (GNSS) RWY 03R AVILO 1 B
DATED 10 JAN 2013 SUSPENDED.
STAR ARR-13 RWY 21 AVAGO 2 B DATED 31 DEC 2020 SUSPENDED.
STAR ARR-14 RWY 21L NIBEX 2 C DATED 31 DEC 2020 SUSPENDED.
STAR ARR-15 RWY 21L STANDERTON 5 B DATED 31 DEC 2020 SUSPENDED.
STAR ARR-17 RWY 21L WITBANK 3 C DATED 31 DEC 2020 SUSPENDED.
Start Date UTC
09/17/2024 10:26
End Date UTC
12/13/2024 10:00
Conditions
STAR ARR-01 RWY 03 AVAGO 2 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-02 RWY 03R NIBEX 2 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-03 RWY 03R STANDERTON 6 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-05 RWY 03R WITBANK 4 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-07 RWY 03R AVILO 1 A DATED 31 DEC 2020 SUSPENDED.
STAR ARR-12 RWY 03R RNAV (GNSS) AVILO 1B DATED 31 DEC 2020 SUSPENDED.
AERONAUTICAL DATA TABULATION ARR-12A RNAV (GNSS) RWY 03R AVILO 1 B
DATED 10 JAN 2013 SUSPENDED.
STAR ARR-13 RWY 21 AVAGO 2 B DATED 31 DEC 2020 SUSPENDED.
STAR ARR-14 RWY 21L NIBEX 2 C DATED 31 DEC 2020 SUSPENDED.
STAR ARR-15 RWY 21L STANDERTON 5 B DATED 31 DEC 2020 SUSPENDED.
STAR ARR-17 RWY 21L WITBANK 3 C DATED 31 DEC 2020 SUSPENDED.
A3025/24
09/17/2024 10:28
12/13/2024 10:00
SID DEP-01 RWY 03L EGMEN 2 A DATED 10 JAN 2013 SUSPENDED.
SID DEP-02 RWY 03L APDAK 3 A DATED 18 AUG 2016 SUSPENDED.
SID DEP-06 RWY 03L/R NESAN 1 A DATED 10 JAN 2013 SUSPENDED.
SID DEP-07 RWY 03L/R GRASMERE 5 B DATED 21 AUG 2014 SUSPENDED.
SID DEP-10 RNAV (GNSS) RWY 03L EGMEN 1 C DATED 10 JAN 2013 SUSPENDED.
AERONAUTICAL DATA TABULATION DEP-10A RNAV (GNSS) RWY 03L EGMEN 1 C
DATED 10 JAN 2013 SUSPENDED.
SID DEP-12 RWY 21R EGMEN 2 B DATED 10 JAN 2013 SUSPENDED.
SID DEP-13 RWY 21R APDAK 2 B DATED 21 AUG 2014 SUSPENDED.
SID DEP-16 RWY 21L/R OVALA 1 B DATED 21 AUG 2014 SUSPENDED.
SID DEP-17 RWY 21R GRASMERE 6 C DATED 21 AUG 2014 SUSPENDED.
SID DEP-19 RWY 21L/R HEIDELBERG 5 D DATED 21 AUG 2014 SUSPENDED.
SID DEP-20 RWY 21R LANSERIA 1 C DATED 31 MAR 2016 SUSPENDED.
SID DEP-21 RNAV (GNSS) RWY 21R EGMEN 1 D DATED 10 JAN 2013 SUSPENDED.
AERONAUTICAL DATA TABULATION DEP-21A RNAV (GNSS) RWY 21R EGMEN 1 D
DATED 10 JAN 2013 SUSPENDED.
SID DEP-22 RNAV (GNSS) RWY 21R APDAK 1 D DATED 21 AUG 2014 SUSPENDED.
AERONAUTICAL DATA TABULATION DEP-22A RNAV (GNSS) RWY 21R APDAK 1 D
DATED 10 JAN 2013 SUSPENDED.
Start Date UTC
09/17/2024 10:28
End Date UTC
12/13/2024 10:00
Conditions
SID DEP-01 RWY 03L EGMEN 2 A DATED 10 JAN 2013 SUSPENDED.
SID DEP-02 RWY 03L APDAK 3 A DATED 18 AUG 2016 SUSPENDED.
SID DEP-06 RWY 03L/R NESAN 1 A DATED 10 JAN 2013 SUSPENDED.
SID DEP-07 RWY 03L/R GRASMERE 5 B DATED 21 AUG 2014 SUSPENDED.
SID DEP-10 RNAV (GNSS) RWY 03L EGMEN 1 C DATED 10 JAN 2013 SUSPENDED.
AERONAUTICAL DATA TABULATION DEP-10A RNAV (GNSS) RWY 03L EGMEN 1 C
DATED 10 JAN 2013 SUSPENDED.
SID DEP-12 RWY 21R EGMEN 2 B DATED 10 JAN 2013 SUSPENDED.
SID DEP-13 RWY 21R APDAK 2 B DATED 21 AUG 2014 SUSPENDED.
SID DEP-16 RWY 21L/R OVALA 1 B DATED 21 AUG 2014 SUSPENDED.
SID DEP-17 RWY 21R GRASMERE 6 C DATED 21 AUG 2014 SUSPENDED.
SID DEP-19 RWY 21L/R HEIDELBERG 5 D DATED 21 AUG 2014 SUSPENDED.
SID DEP-20 RWY 21R LANSERIA 1 C DATED 31 MAR 2016 SUSPENDED.
SID DEP-21 RNAV (GNSS) RWY 21R EGMEN 1 D DATED 10 JAN 2013 SUSPENDED.
AERONAUTICAL DATA TABULATION DEP-21A RNAV (GNSS) RWY 21R EGMEN 1 D
DATED 10 JAN 2013 SUSPENDED.
SID DEP-22 RNAV (GNSS) RWY 21R APDAK 1 D DATED 21 AUG 2014 SUSPENDED.
AERONAUTICAL DATA TABULATION DEP-22A RNAV (GNSS) RWY 21R APDAK 1 D
DATED 10 JAN 2013 SUSPENDED.
V0223/24
08/13/2024 00:00
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z RWY 21L
Start Date UTC
08/13/2024 00:00
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z RWY 21L
V0224/24
08/13/2024 00:00
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z RWY 03L
Start Date UTC
08/13/2024 00:00
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z RWY 03L
V0225/24
08/13/2024 00:00
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z RWY 03R
Start Date UTC
08/13/2024 00:00
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS Z RWY 03R
V0226/24
08/13/2024 00:00
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS RWY 21R
Start Date UTC
08/13/2024 00:00
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED ILS RWY 21R
V0227/24
08/11/2024 14:47
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED VOR Z RWY 21R
Start Date UTC
08/11/2024 14:47
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE NOT AUTHORIZED VOR Z RWY 21R
V0229/24
08/13/2024 00:00
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] IFR TAKE-OFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES NOT AUTHORIZED
Start Date UTC
08/13/2024 00:00
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] IFR TAKE-OFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES NOT AUTHORIZED
V0230/24
08/13/2024 00:00
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED EXOBI 1A
Start Date UTC
08/13/2024 00:00
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED EXOBI 1A
V0231/24
08/11/2024 14:57
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED VASUR 3B
Start Date UTC
08/11/2024 14:57
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED VASUR 3B
V0232/24
08/13/2024 00:00
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED VASUR 3A
Start Date UTC
08/13/2024 00:00
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED VASUR 3A
V0233/24
08/11/2024 14:59
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED GRASMERE 6C
Start Date UTC
08/11/2024 14:59
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED GRASMERE 6C
V0234/24
08/11/2024 15:00
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED GRASMERE 5B
Start Date UTC
08/11/2024 15:00
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED GRASMERE 5B
V0235/24
08/11/2024 15:00
12/11/2024 23:59
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED EXOBI 3B
Start Date UTC
08/11/2024 15:00
End Date UTC
12/11/2024 23:59
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED EXOBI 3B
A2591/24
09/01/2024 00:01
11/30/2024 23:59
AREA BOUNDED BY (261731S 0280754E, 261703S 0280841E, 261707S
0280845E, 261734S 0280756E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 00:01
End Date UTC
11/30/2024 23:59
Conditions
AREA BOUNDED BY (261731S 0280754E, 261703S 0280841E, 261707S
0280845E, 261734S 0280756E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2585/24
09/01/2024 19:00
11/30/2024 05:00
AREA BOUNDED BY (261817S 0280645E, 261757S 0280704E, 261841S
0280733E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 19:00
End Date UTC
11/30/2024 05:00
Conditions
AREA BOUNDED BY (261817S 0280645E, 261757S 0280704E, 261841S
0280733E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2592/24
09/01/2024 19:00
11/30/2024 05:00
AREA BOUNDED BY (261756S 0280703E, 261720S 0280724E, 261733S
0280755E, 261801S 0280706E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 19:00
End Date UTC
11/30/2024 05:00
Conditions
AREA BOUNDED BY (261756S 0280703E, 261720S 0280724E, 261733S
0280755E, 261801S 0280706E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2593/24
09/01/2024 21:00
11/30/2024 05:00
AREA BOUNDED BY (261833S 0281038E, 261804S 0281123E, 261806S
0281121E, 261834S 0281036E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 21:00
End Date UTC
11/30/2024 05:00
Conditions
AREA BOUNDED BY (261833S 0281038E, 261804S 0281123E, 261806S
0281121E, 261834S 0281036E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2607/24
09/01/2024 21:00
11/30/2024 05:00
AREA BOUNDED BY (261833S 0281038E, 261804S 0281123E, 261806S
0281121E, 261834S 0281036E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 21:00
End Date UTC
11/30/2024 05:00
Conditions
AREA BOUNDED BY (261833S 0281038E, 261804S 0281123E, 261806S
0281121E, 261834S 0281036E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A3034/24
10/01/2024 16:00
11/30/2024 04:00
AECI MODDERFONTEIN, GAUTENG (260328S 0280933E, 260513S 0281120E,
260608S 0281024E, 260510S 0280822E): REMOTELY PILOTED AIRCRAFT
SYSTEMS (RPAS) OPS (400FT AGL) TAKING PLACE BEYOND VISUAL LINE OF
SIGHT (BVLOS). CAMU REF:GN 12/09-8.
Start Date UTC
10/01/2024 16:00
End Date UTC
11/30/2024 04:00
Conditions
AECI MODDERFONTEIN, GAUTENG (260328S 0280933E, 260513S 0281120E,
260608S 0281024E, 260510S 0280822E): REMOTELY PILOTED AIRCRAFT
SYSTEMS (RPAS) OPS (400FT AGL) TAKING PLACE BEYOND VISUAL LINE OF
SIGHT (BVLOS). CAMU REF:GN 12/09-8.
A2582/24
09/01/2024 00:00
11/29/2024 23:59
AREA BOUNDED BY (262143S 0281423E, 262146S 0281427E, 262232S
0281440E, 262205S 0281419E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 00:00
End Date UTC
11/29/2024 23:59
Conditions
AREA BOUNDED BY (262143S 0281423E, 262146S 0281427E, 262232S
0281440E, 262205S 0281419E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2583/24
09/01/2024 00:00
11/29/2024 23:59
AREA BOUNDED BY (262105S 0281346E, 262143S 0281423E, 262137S
0281404E, 262106S 0281323E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 00:00
End Date UTC
11/29/2024 23:59
Conditions
AREA BOUNDED BY (262105S 0281346E, 262143S 0281423E, 262137S
0281404E, 262106S 0281323E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2584/24
09/01/2024 00:00
11/29/2024 23:59
AREA BOUNDED BY (261721S 0280818E, 261731S 0280811E, 261741S
0280855E, 261729S 0280818E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 00:00
End Date UTC
11/29/2024 23:59
Conditions
AREA BOUNDED BY (261721S 0280818E, 261731S 0280811E, 261741S
0280855E, 261729S 0280818E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2586/24
09/01/2024 00:00
11/29/2024 23:59
AREA BOUNDED BY (261727S 0280916E, 261758S 0280954E, 261801S
0280951E, 261734S 0280910E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 00:00
End Date UTC
11/29/2024 23:59
Conditions
AREA BOUNDED BY (261727S 0280916E, 261758S 0280954E, 261801S
0280951E, 261734S 0280910E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2590/24
09/01/2024 00:00
11/29/2024 23:59
AREA BOUNDED BY (261800S 0280953E, 261832S 0281038E, 261834S
0281035E, 261802S 0280951E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 00:00
End Date UTC
11/29/2024 23:59
Conditions
AREA BOUNDED BY (261800S 0280953E, 261832S 0281038E, 261834S
0281035E, 261802S 0280951E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2758/24
09/01/2024 00:00
11/29/2024 23:59
WATLOO TO KORTLAAGTE (261615S 0290159E, 255049S 0291059E, 254247S
0281838E, 254316S 0281818E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 00:00
End Date UTC
11/29/2024 23:59
Conditions
WATLOO TO KORTLAAGTE (261615S 0290159E, 255049S 0291059E, 254247S
0281838E, 254316S 0281818E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2886/24
09/01/2024 00:00
11/29/2024 23:59
GREENSIDE, GAUTENG (255848S 0291313E, 255740S 0291602E, 255347S
0291222E, 255507S 0291912E, 255719S 0290806E, 255925S 0290909E,
255811S 0291158E): UAS OPS (400FT AGL) TAKING PLACE BEYOND VISUAL
LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 00:00
End Date UTC
11/29/2024 23:59
Conditions
GREENSIDE, GAUTENG (255848S 0291313E, 255740S 0291602E, 255347S
0291222E, 255507S 0291912E, 255719S 0290806E, 255925S 0290909E,
255811S 0291158E): UAS OPS (400FT AGL) TAKING PLACE BEYOND VISUAL
LINE OF SIGHT (BVLOS).
A2888/24
09/01/2024 00:00
11/29/2024 23:59
KROMDAAI, GAUTENG (254431S 0290549E, 254544S 0290333E, 254850S
0290400E, 254925S 0290440E, 254933S 0290513E, 254807S 0290637E,
254553S 0290652E): UAS OPS (400FT AGL) TAKING PLACE BEYOND VISUAL
LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 00:00
End Date UTC
11/29/2024 23:59
Conditions
KROMDAAI, GAUTENG (254431S 0290549E, 254544S 0290333E, 254850S
0290400E, 254925S 0290440E, 254933S 0290513E, 254807S 0290637E,
254553S 0290652E): UAS OPS (400FT AGL) TAKING PLACE BEYOND VISUAL
LINE OF SIGHT (BVLOS).
A2669/24
09/01/2024 19:00
11/29/2024 03:00
DSV LOGISTICS (260335S 0281701E): UAS OPS (400FT AGL) TAKING PLACE
BEYOND VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 19:00
End Date UTC
11/29/2024 03:00
Conditions
DSV LOGISTICS (260335S 0281701E): UAS OPS (400FT AGL) TAKING PLACE
BEYOND VISUAL LINE OF SIGHT (BVLOS).
A2762/24
09/01/2024 19:00
11/29/2024 03:00
DSV LOGISTICS, GAUTENG (260335S 0281701E): UAS OPS (400FT AGL)
TAKING PLACE BEYOND VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
09/01/2024 19:00
End Date UTC
11/29/2024 03:00
Conditions
DSV LOGISTICS, GAUTENG (260335S 0281701E): UAS OPS (400FT AGL)
TAKING PLACE BEYOND VISUAL LINE OF SIGHT (BVLOS).
A2927/24
09/03/2024 08:46
11/25/2024 11:00
MULTIPLE AIRFIELD SIGNAGE LGT U/S:
1. TWY E BTN RWY 03R/21L AND 03L/21R
2. TWY A NORTH OF TWY H.
Start Date UTC
09/03/2024 08:46
End Date UTC
11/25/2024 11:00
Conditions
MULTIPLE AIRFIELD SIGNAGE LGT U/S:
1. TWY E BTN RWY 03R/21L AND 03L/21R
2. TWY A NORTH OF TWY H.
A2928/24
09/03/2024 08:46
11/25/2024 11:00
TWY A CL LGT (FM TWY E TO HLDG POINT RWY 21R) EV SECOND LGT IS U/S.
TWY E CL LGT (WEST OF TWY A) U/S.
Start Date UTC
09/03/2024 08:46
End Date UTC
11/25/2024 11:00
Conditions
TWY A CL LGT (FM TWY E TO HLDG POINT RWY 21R) EV SECOND LGT IS U/S.
TWY E CL LGT (WEST OF TWY A) U/S.
A2929/24
09/03/2024 08:47
11/25/2024 11:00
1)TWY H EDGE LGT (FM TWY Y TO TWY C) EV SECOND LGT U/S.
2)TWY E EDGE LGT EV SECOND LGT U/S.
Start Date UTC
09/03/2024 08:47
End Date UTC
11/25/2024 11:00
Conditions
1)TWY H EDGE LGT (FM TWY Y TO TWY C) EV SECOND LGT U/S.
2)TWY E EDGE LGT EV SECOND LGT U/S.
A2930/24
09/03/2024 08:47
11/25/2024 11:00
TWY B (BTN CAT I HLDG POINT AND RWY 03L THR) CLSD. CODE F ACFT
DEPARTING FM RWY 03L TO ACCESS AVBL TAKE-OFF RUN FM TWY J EAST, OTHER
ACFT ACCESS IS FM TWY J WEST. TORA 4207M.
Start Date UTC
09/03/2024 08:47
End Date UTC
11/25/2024 11:00
Conditions
TWY B (BTN CAT I HLDG POINT AND RWY 03L THR) CLSD. CODE F ACFT
DEPARTING FM RWY 03L TO ACCESS AVBL TAKE-OFF RUN FM TWY J EAST, OTHER
ACFT ACCESS IS FM TWY J WEST. TORA 4207M.
A2931/24
09/03/2024 08:47
11/15/2024 11:00
1.08NM NE OF RWY 21R THR (260549.2S 0281511.35E): 1 CRANE (30M AGL
EST) ERECTED.
Start Date UTC
09/03/2024 08:47
End Date UTC
11/15/2024 11:00
Conditions
1.08NM NE OF RWY 21R THR (260549.2S 0281511.35E): 1 CRANE (30M AGL
EST) ERECTED.
A2658/24
08/13/2024 00:01
11/10/2024 23:59
AREA BOUNDED BY (262140S 0281514E, 261634S 0280925E, 262924S
0282808E, 262749S 0280904E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
08/13/2024 00:01
End Date UTC
11/10/2024 23:59
Conditions
AREA BOUNDED BY (262140S 0281514E, 261634S 0280925E, 262924S
0282808E, 262749S 0280904E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2508/24
07/30/2024 11:37
10/26/2024 23:59
JETPARK, GAUTENG (260922S 0281203E, 260938S 0281256E, 261003S
0281228E, 260937S 0281158E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
Start Date UTC
07/30/2024 11:37
End Date UTC
10/26/2024 23:59
Conditions
JETPARK, GAUTENG (260922S 0281203E, 260938S 0281256E, 261003S
0281228E, 260937S 0281158E): UAS OPS (400FT AGL) TAKING PLACE BEYOND
VISUAL LINE OF SIGHT (BVLOS).
A2457/24
07/27/2024 08:00
10/24/2024 18:00
ULANA PARK, GERMISTON, GAUTENG (261150S 0281212E, 261155S 0281237E,
261215S 0281235E, 261222S 0281203E): REMOTELY PILOTED AIRCRAFT
SYSTEMS (RPAS) OPS (1000FT AGL) TAKING PLACE.
Start Date UTC
07/27/2024 08:00
End Date UTC
10/24/2024 18:00
Conditions
ULANA PARK, GERMISTON, GAUTENG (261150S 0281212E, 261155S 0281237E,
261215S 0281235E, 261222S 0281203E): REMOTELY PILOTED AIRCRAFT
SYSTEMS (RPAS) OPS (1000FT AGL) TAKING PLACE.
A2413/24
07/19/2024 17:10
10/16/2024 10:00
SID DEP-14 RWY 21L/R VASUR 3B DATED 31 MAR 2016 SUSPENDED.
SID DEP-15 RWY 21L/R RAGUL 3B DATED 21 AUG 2014 SUSPENDED.
SID DEP-18 RWY 21L/R EXOBI 3B DATED 10 JAN 2013 SUSPENDED.
Start Date UTC
07/19/2024 17:10
End Date UTC
10/16/2024 10:00
Conditions
SID DEP-14 RWY 21L/R VASUR 3B DATED 31 MAR 2016 SUSPENDED.
SID DEP-15 RWY 21L/R RAGUL 3B DATED 21 AUG 2014 SUSPENDED.
SID DEP-18 RWY 21L/R EXOBI 3B DATED 10 JAN 2013 SUSPENDED.
A2418/24
07/19/2024 18:04
10/16/2024 10:00
STAR ARR-16 RWY 21L OKPIT 4B DATED 31 DEC 2020 SUSPENDED.
STAR ARR-18 RNAV (GNSS) RWY 21L AVAGO 1D DATED 31 DEC 2020 SUSPENDED.
AERONAUTICAL DATA TABULATION ARR-18A RNAV (GNSS) RWY 21L AVAGO 1D
DATED 10 JAN 2013 SUSPENDED.
STAR ARR-20 RNAV (GNSS) RWY 21L STANDERTON 1D DATED 31 DEC 2020
SUSPENDED.
AERONAUTICAL DATA TABULATION ARR-20A RNAV (GNSS) RWY 21L STANDERTON
1D DATED 10 JAN 2013 SUSPENDED.
Start Date UTC
07/19/2024 18:04
End Date UTC
10/16/2024 10:00
Conditions
STAR ARR-16 RWY 21L OKPIT 4B DATED 31 DEC 2020 SUSPENDED.
STAR ARR-18 RNAV (GNSS) RWY 21L AVAGO 1D DATED 31 DEC 2020 SUSPENDED.
AERONAUTICAL DATA TABULATION ARR-18A RNAV (GNSS) RWY 21L AVAGO 1D
DATED 10 JAN 2013 SUSPENDED.
STAR ARR-20 RNAV (GNSS) RWY 21L STANDERTON 1D DATED 31 DEC 2020
SUSPENDED.
AERONAUTICAL DATA TABULATION ARR-20A RNAV (GNSS) RWY 21L STANDERTON
1D DATED 10 JAN 2013 SUSPENDED.
A2991/24
09/15/2024 06:10
10/15/2024 12:40
SWEEPING OPS ON TXL I AND L (BTN PRKG STAND C5/C19 AND C8). 5MIN PN
TO VACATE.
Start Date UTC
09/15/2024 06:10
End Date UTC
10/15/2024 12:40
Conditions
SWEEPING OPS ON TXL I AND L (BTN PRKG STAND C5/C19 AND C8). 5MIN PN
TO VACATE.
A2391/24
07/18/2024 11:40
10/14/2024 10:00
1.94NM SW OF RWY 03L (260805.23S 0281202.56E) : 1 CRANE (213.3FT
AGL) ERECTED.
Start Date UTC
07/18/2024 11:40
End Date UTC
10/14/2024 10:00
Conditions
1.94NM SW OF RWY 03L (260805.23S 0281202.56E) : 1 CRANE (213.3FT
AGL) ERECTED.
A2964/24
10/11/2024 14:00
10/11/2024 19:00
GLENDOWER GOLF ESTATE, EDENVALE, GAUTENG (260935S 0280832E):
TETHERED HOT AIR BALLOON OPS (100FT AGL) TAKING PLACE.
Start Date UTC
10/11/2024 14:00
End Date UTC
10/11/2024 19:00
Conditions
GLENDOWER GOLF ESTATE, EDENVALE, GAUTENG (260935S 0280832E):
TETHERED HOT AIR BALLOON OPS (100FT AGL) TAKING PLACE.
A2599/24
08/06/2024 14:40
10/10/2024 11:00
1)TWY Y EDGE LGT (FM TWY E TO RWY 03R) EV SECOND LGT U/S.
2)TWY H EDGE LGT (FM TWY Y TO TWY C) LGT U/S.
3)TWY E EDGE LGT EV SECOND LGT U/S.
Start Date UTC
08/06/2024 14:40
End Date UTC
10/10/2024 11:00
Conditions
1)TWY Y EDGE LGT (FM TWY E TO RWY 03R) EV SECOND LGT U/S.
2)TWY H EDGE LGT (FM TWY Y TO TWY C) LGT U/S.
3)TWY E EDGE LGT EV SECOND LGT U/S.
A2609/24
08/07/2024 13:30
10/10/2024 11:00
1)TWY H EDGE LGT (FM TWY Y TO TWY C) EV SECOND LGT U/S.
2)TWY E EDGE LGT EV SECOND LGT U/S.
Start Date UTC
08/07/2024 13:30
End Date UTC
10/10/2024 11:00
Conditions
1)TWY H EDGE LGT (FM TWY Y TO TWY C) EV SECOND LGT U/S.
2)TWY E EDGE LGT EV SECOND LGT U/S.
A2311/24
07/10/2024 14:17
10/07/2024 11:00
TWY Y EDGE LGT (FM TWY E TO RWY 03R) EV SECOND LGT U/S.
TWY H EDGE LGT (FM TWY Y TO TWY C) EV SECOND LGT U/S.
TWY E EDGE LGT U/S.
Start Date UTC
07/10/2024 14:17
End Date UTC
10/07/2024 11:00
Conditions
TWY Y EDGE LGT (FM TWY E TO RWY 03R) EV SECOND LGT U/S.
TWY H EDGE LGT (FM TWY Y TO TWY C) EV SECOND LGT U/S.
TWY E EDGE LGT U/S.
A2312/24
07/10/2024 14:19
10/07/2024 11:00
REF FAOR AIP AD 2.15 (3) BLW TWY DO NOT HAVE CL FOR CAT II LVP. OPS
BELOW RVR 350M, FOLLOW ME VEHICLE WILL BE PROVIDED O/R FOR ARRIVING
ACFT.
1. TWY Y.
Start Date UTC
07/10/2024 14:19
End Date UTC
10/07/2024 11:00
Conditions
REF FAOR AIP AD 2.15 (3) BLW TWY DO NOT HAVE CL FOR CAT II LVP. OPS
BELOW RVR 350M, FOLLOW ME VEHICLE WILL BE PROVIDED O/R FOR ARRIVING
ACFT.
1. TWY Y.
A2313/24
07/10/2024 14:20
10/07/2024 11:00
TWY A CL LGT (FM TWY E TO HLDG POINT RWY 21R) EV SECOND LGT IS U/S.
TWY E CL LGT (WEST OF TWY A) U/S.
Start Date UTC
07/10/2024 14:20
End Date UTC
10/07/2024 11:00
Conditions
TWY A CL LGT (FM TWY E TO HLDG POINT RWY 21R) EV SECOND LGT IS U/S.
TWY E CL LGT (WEST OF TWY A) U/S.
A2314/24
07/10/2024 14:21
10/07/2024 11:00
EV 3RD ROW (WHITE LGT) OF PALS CAT II RWY 03R U/S.
Start Date UTC
07/10/2024 14:21
End Date UTC
10/07/2024 11:00
Conditions
EV 3RD ROW (WHITE LGT) OF PALS CAT II RWY 03R U/S.
A2315/24
07/10/2024 14:23
10/07/2024 11:00
1.08NM NE OF RWY 21R THR (260549.2S 0281511.35E): 1 CRANE (30M AGL
EST) ERECTED.
Start Date UTC
07/10/2024 14:23
End Date UTC
10/07/2024 11:00
Conditions
1.08NM NE OF RWY 21R THR (260549.2S 0281511.35E): 1 CRANE (30M AGL
EST) ERECTED.
A2316/24
07/10/2024 14:23
10/07/2024 11:00
MULTIPLE AIRFIELD SIGNAGE LGT U/S:
1. TWY Y SOUTH OF TWY E
2. TWY E BTN RWY 03R/21L AND 03L/21R
3. RWY EXIT SIGN FOR TWY T
4. TWY A NORTH OF TWY H.
Start Date UTC
07/10/2024 14:23
End Date UTC
10/07/2024 11:00
Conditions
MULTIPLE AIRFIELD SIGNAGE LGT U/S:
1. TWY Y SOUTH OF TWY E
2. TWY E BTN RWY 03R/21L AND 03L/21R
3. RWY EXIT SIGN FOR TWY T
4. TWY A NORTH OF TWY H.
A2611/24
08/07/2024 13:30
10/07/2024 11:00
MULTIPLE AIRFIELD SIGNAGE LGT U/S:
1. TWY E BTN RWY 03R/21L AND 03L/21R
2. TWY A NORTH OF TWY H.
Start Date UTC
08/07/2024 13:30
End Date UTC
10/07/2024 11:00
Conditions
MULTIPLE AIRFIELD SIGNAGE LGT U/S:
1. TWY E BTN RWY 03R/21L AND 03L/21R
2. TWY A NORTH OF TWY H.
A3135/24
09/28/2024 12:38
10/01/2024 12:38
A3135/24 NOTAMC A3124/24
Q) FAJA/QITAK/I/NBO/A/000/999/2608S02815E005
A) FAOR B) 2409281237
E) ILS CAT II RWY 03L RESUMED NML OPS.
Start Date UTC
09/28/2024 12:38
End Date UTC
10/01/2024 12:38
Conditions
A3135/24 NOTAMC A3124/24
Q) FAJA/QITAK/I/NBO/A/000/999/2608S02815E005
A) FAOR B) 2409281237
E) ILS CAT II RWY 03L RESUMED NML OPS.
A3134/24
09/28/2024 12:37
10/01/2024 12:37
A3134/24 NOTAMC A3123/24
Q) FAJA/QITAK/I/NBO/A/000/999/2609S02814E005
A) FAOR B) 2409281144
E) ILS CAT II RWY 21R RESUMED NML OPS.
Start Date UTC
09/28/2024 12:37
End Date UTC
10/01/2024 12:37
Conditions
A3134/24 NOTAMC A3123/24
Q) FAJA/QITAK/I/NBO/A/000/999/2609S02814E005
A) FAOR B) 2409281144
E) ILS CAT II RWY 21R RESUMED NML OPS.
F0051/23
03/10/2023 10:56
PERM
HAND AMEND FAOR AD-04 CHART DATED 04 JAN 2018 AS FOLLOWS: MAG VAR
TO READ 20 DEG W (2023).
Start Date UTC
03/10/2023 10:56
Conditions
HAND AMEND FAOR AD-04 CHART DATED 04 JAN 2018 AS FOLLOWS: MAG VAR
TO READ 20 DEG W (2023).
F0054/23
03/10/2023 10:55
PERM
HAND AMEND FAOR AD-08 CHART DATED 04 FEB 2016 AS FOLLOWS: MAG VAR
TO READ 20 DEG W (2023).
Start Date UTC
03/10/2023 10:55
Conditions
HAND AMEND FAOR AD-08 CHART DATED 04 FEB 2016 AS FOLLOWS: MAG VAR
TO READ 20 DEG W (2023).
F0118/24
09/06/2024 15:15
PERM
HAND AMEND FAOR ARR-09 RWY 03R RNAV (GNSS) NIBEX 1B CHART DATED 31
DEC 2020 AS FLW:
AMEND PROCEDURE ALT AT JS012 TO READ AT OR ABOVE FL110.
Start Date UTC
09/06/2024 15:15
Conditions
HAND AMEND FAOR ARR-09 RWY 03R RNAV (GNSS) NIBEX 1B CHART DATED 31
DEC 2020 AS FLW:
AMEND PROCEDURE ALT AT JS012 TO READ AT OR ABOVE FL110.