A0334/25
01/27/2025 05:30
04/27/2025 13:00
ATC TRG TAKING PLACE ON APP 124.3 MHZ.
Start Date UTC
01/27/2025 05:30
End Date UTC
04/27/2025 13:00
Conditions
ATC TRG TAKING PLACE ON APP 124.3 MHZ.
A0336/25
01/27/2025 06:12
04/27/2025 13:00
PROCEDURAL TRG TAKING PLACE ON APP 124.3 MHZ.
Start Date UTC
01/27/2025 06:12
End Date UTC
04/27/2025 13:00
Conditions
PROCEDURAL TRG TAKING PLACE ON APP 124.3 MHZ.
A0147/25
01/13/2025 06:34
04/11/2025 10:00
IAC VOR-01 VOR RWY 02 DATED 11 DEC 2014 SUSPENDED.
IAC VOR-02 VOR RWY 20 DATED 11 DEC 2014 SUSPENDED.
Start Date UTC
01/13/2025 06:34
End Date UTC
04/11/2025 10:00
Conditions
IAC VOR-01 VOR RWY 02 DATED 11 DEC 2014 SUSPENDED.
IAC VOR-02 VOR RWY 20 DATED 11 DEC 2014 SUSPENDED.
A0791/25
02/21/2025 00:00
03/19/2025 23:59
PETRA QUARRY, BLOEMFONTEIN, FREE STATE (290332S 0261415E, 290335S
0261506E, 290410S 0261503E, 290407S 0261421E): UNMANNED AERIAL
VEHICLE (UAV) OPS (400FT AGL) TAKING PLACE BEYOND VISUAL LINE OF
SIGHT (BVLOS). FUA REF/GN 17/02-8.
Start Date UTC
02/21/2025 00:00
End Date UTC
03/19/2025 23:59
Conditions
PETRA QUARRY, BLOEMFONTEIN, FREE STATE (290332S 0261415E, 290335S
0261506E, 290410S 0261503E, 290407S 0261421E): UNMANNED AERIAL
VEHICLE (UAV) OPS (400FT AGL) TAKING PLACE BEYOND VISUAL LINE OF
SIGHT (BVLOS). FUA REF/GN 17/02-8.
A4179/24
12/18/2024 12:13
03/17/2025 18:00
TWR 120.8 MHZ OPS HR CHG TO:
MON-FRI 0445-1800
SAT 0700-1400
SUN 0700-1800.
Start Date UTC
12/18/2024 12:13
End Date UTC
03/17/2025 18:00
Conditions
TWR 120.8 MHZ OPS HR CHG TO:
MON-FRI 0445-1800
SAT 0700-1400
SUN 0700-1800.
A4180/24
12/18/2024 12:14
03/17/2025 18:00
APP 124.3 MHZ OPS HR CHG TO:
MON-FRI 0445-1800
SAT 0700-1400
SUN 0700-1800
Start Date UTC
12/18/2024 12:14
End Date UTC
03/17/2025 18:00
Conditions
APP 124.3 MHZ OPS HR CHG TO:
MON-FRI 0445-1800
SAT 0700-1400
SUN 0700-1800
A4069/24
12/11/2024 13:16
03/14/2025 10:00
SID DEP-01 RNAV (GNSS) RWY 02 OKTIG 1B DATED 30 MAR 2017 SUSPENDED.
AERONAUTICAL DATA TABULATION DEP-01A RNAV (GNSS) RWY 02 OKTIG 1B
DATED 30 MAR 2017 SUSPENDED.
Start Date UTC
12/11/2024 13:16
End Date UTC
03/14/2025 10:00
Conditions
SID DEP-01 RNAV (GNSS) RWY 02 OKTIG 1B DATED 30 MAR 2017 SUSPENDED.
AERONAUTICAL DATA TABULATION DEP-01A RNAV (GNSS) RWY 02 OKTIG 1B
DATED 30 MAR 2017 SUSPENDED.
A4072/24
12/11/2024 13:19
03/14/2025 10:00
STAR ARR-01 RNAV (GNSS) RWY 02 UTONU 1A DATED 30 MAR 2017
SUSPENDED.
AERONAUTICAL DATA TABULATION ARR-01A RNAV (GNSS) RWY 02 UTONU 1A
DATED 30 MAR 2017 SUSPENDED.
Start Date UTC
12/11/2024 13:19
End Date UTC
03/14/2025 10:00
Conditions
STAR ARR-01 RNAV (GNSS) RWY 02 UTONU 1A DATED 30 MAR 2017
SUSPENDED.
AERONAUTICAL DATA TABULATION ARR-01A RNAV (GNSS) RWY 02 UTONU 1A
DATED 30 MAR 2017 SUSPENDED.
A0834/25
02/28/2025 08:00
02/28/2025 08:30
BREBNER HIGH SCHOOL, BLOEMFONTEIN (290433S 0261354E): 300 HELIUM
BALLOON RELEASE TAKING PLACE.
Start Date UTC
02/28/2025 08:00
End Date UTC
02/28/2025 08:30
Conditions
BREBNER HIGH SCHOOL, BLOEMFONTEIN (290433S 0261354E): 300 HELIUM
BALLOON RELEASE TAKING PLACE.
A0826/25
02/21/2025 12:12
02/24/2025 12:12
A0826/25 NOTAMC A0807/25
Q) FAJA/QMNAK/IV/BO/A/000/999/2906S02618E005
A) FABL B) 2502211210
E) APN A RESUMED NML OPS.
Start Date UTC
02/21/2025 12:12
End Date UTC
02/24/2025 12:12
Conditions
A0826/25 NOTAMC A0807/25
Q) FAJA/QMNAK/IV/BO/A/000/999/2906S02618E005
A) FABL B) 2502211210
E) APN A RESUMED NML OPS.
A0822/25
02/21/2025 08:43
02/24/2025 08:00
NIL MET UPDATES AVBL.
Start Date UTC
02/21/2025 08:43
End Date UTC
02/24/2025 08:00
Conditions
NIL MET UPDATES AVBL.
A0797/25
02/22/2025 14:00
02/22/2025 22:00
WIP ON HLDG POINTS FOR TWY B (RWY 02/20), TWY A (RWY 12/30) AND TWY
C (RWY 12/30).
Start Date UTC
02/22/2025 14:00
End Date UTC
02/22/2025 22:00
Conditions
WIP ON HLDG POINTS FOR TWY B (RWY 02/20), TWY A (RWY 12/30) AND TWY
C (RWY 12/30).
A0829/25
02/22/2025 14:00
02/22/2025 20:00
BLOEMFONTEIN MSSR (290248.02452S 0261617.57559E) U/S.
Start Date UTC
02/22/2025 14:00
End Date UTC
02/22/2025 20:00
Conditions
BLOEMFONTEIN MSSR (290248.02452S 0261617.57559E) U/S.
F0013/23
01/20/2023 11:49
PERM
HAND AMEND AIP AMDT 01/2023 DATED 15 JAN 2023 CONTROL SHEET PAGE-3,
UNDER AD SECTION COLUMN 2: TO ONLY READ FABL PAGES 13 TO 16, AS PAGES
1 TO 4 WERE NOT PUBLISHED AND GEN 0.4-13 FABL AD PAGES 1 TO 4, DATE
TO READ 15 JUL 21.
Start Date UTC
01/20/2023 11:49
Conditions
HAND AMEND AIP AMDT 01/2023 DATED 15 JAN 2023 CONTROL SHEET PAGE-3,
UNDER AD SECTION COLUMN 2: TO ONLY READ FABL PAGES 13 TO 16, AS PAGES
1 TO 4 WERE NOT PUBLISHED AND GEN 0.4-13 FABL AD PAGES 1 TO 4, DATE
TO READ 15 JUL 21.
A4060/24
12/11/2024 12:18
PERM
IMPLEMENTATION OF THE REPORTING OF PAVEMENT BEARING STRENGTH USING
THE ACR - PCR METHODOLOGY
RWY 02/20 AND 12/30 PCR 377/F/A/X/U
TWY A, B, C PCR 377/F/A/X/U
APN A1 - A4 PCR 377/R/A/W/U.
Start Date UTC
12/11/2024 12:18
Conditions
IMPLEMENTATION OF THE REPORTING OF PAVEMENT BEARING STRENGTH USING
THE ACR - PCR METHODOLOGY
RWY 02/20 AND 12/30 PCR 377/F/A/X/U
TWY A, B, C PCR 377/F/A/X/U
APN A1 - A4 PCR 377/R/A/W/U.