V0695/24
12/26/2024 17:48
08/29/2025 23:59
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) AMENDMENT RWYS 09/27 TAKEOFF RWY 27: CLIMB ON HEADING 266 TO 4000, THENCE...
Start Date UTC
12/26/2024 17:48
End Date UTC
08/29/2025 23:59
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) AMENDMENT RWYS 09/27 TAKEOFF RWY 27: CLIMB ON HEADING 266 TO 4000, THENCE...
V0696/24
12/26/2024 21:52
08/29/2025 23:59
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) AMENDMENT RWY 09/27 CHANGE WORDING TAKEOFF RWY 27: CLIMB ON HEADING 266 TO 4000, THENCE.
Start Date UTC
12/26/2024 21:52
End Date UTC
08/29/2025 23:59
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) AMENDMENT RWY 09/27 CHANGE WORDING TAKEOFF RWY 27: CLIMB ON HEADING 266 TO 4000, THENCE.
V0697/24
12/26/2024 22:04
08/29/2025 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED RNP RWY 09 CHANGE LNAV/VNAV MINIMA TO READ CAT A 1383-1200M 359 (400-1200M), CAT B 1393-1300M 369 (400-1300M), CAT C 1403-1300M 379 (400-1300M), CAT D 1413-1400M 389 (400-1400M)
Start Date UTC
12/26/2024 22:04
End Date UTC
08/29/2025 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED RNP RWY 09 CHANGE LNAV/VNAV MINIMA TO READ CAT A 1383-1200M 359 (400-1200M), CAT B 1393-1300M 369 (400-1300M), CAT C 1403-1300M 379 (400-1300M), CAT D 1413-1400M 389 (400-1400M)
V0698/24
12/26/2024 22:05
08/29/2025 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED RNP RWY 09 CHANGE LNAV MINIMA TO READ CAT A 1504-1500M 480 (500-1500M), CAT B 1504-1500M 480 (500-1500M), CAT C 1504-1800M 480 (500-1800M), CAT D 1504-1800M 480 (500-1800M)
Start Date UTC
12/26/2024 22:05
End Date UTC
08/29/2025 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED RNP RWY 09 CHANGE LNAV MINIMA TO READ CAT A 1504-1500M 480 (500-1500M), CAT B 1504-1500M 480 (500-1500M), CAT C 1504-1800M 480 (500-1800M), CAT D 1504-1800M 480 (500-1800M)
V0699/24
12/26/2024 22:07
08/29/2025 23:59
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED RNP RWY 09 CHANGE INOP LIGHTING NOTES *LNAV/VNAV DA: WHEN ALS INOP INCREASE CAT AB VIS TO 1500M; CAT C VIS TO 1700M; CAT D VIS TO 1800M **LNAV MDA: WHEN ALS INOP INCREASE CAT CD VIS TO 2200M
Start Date UTC
12/26/2024 22:07
End Date UTC
08/29/2025 23:59
Conditions
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED RNP RWY 09 CHANGE INOP LIGHTING NOTES *LNAV/VNAV DA: WHEN ALS INOP INCREASE CAT AB VIS TO 1500M; CAT C VIS TO 1700M; CAT D VIS TO 1800M **LNAV MDA: WHEN ALS INOP INCREASE CAT CD VIS TO 2200M
A0477/25
01/31/2025 21:38
02/03/2025 21:38
A0477/25 NOTAMC A0430/25
Q) EDGG/QMXXX/IV/BO /A /000/999/4913N00707E005
A) EDDR B) 2501312138
E) TWY C REOPENED.
Start Date UTC
01/31/2025 21:38
End Date UTC
02/03/2025 21:38
Conditions
A0477/25 NOTAMC A0430/25
Q) EDGG/QMXXX/IV/BO /A /000/999/4913N00707E005
A) EDDR B) 2501312138
E) TWY C REOPENED.
A1295/23
03/22/2023 13:31
PERM
ILS RWY 27 SECTOR DME DSB IS NOT COLLOCATED WITH ILS LOC DSB.
Start Date UTC
03/22/2023 13:31
Conditions
ILS RWY 27 SECTOR DME DSB IS NOT COLLOCATED WITH ILS LOC DSB.
A1915/23
04/25/2023 15:49
PERM
CHANGES TO SID PROC DUE TO DECOMMISSIONING OF SR NDB:
RWY 09:
GTQ 1E: AMEND ON COURSE 086 DEG SR TO READ ON R264 ZWN.
TOMPI 6E: AMEND ON COURSE 086 DEG SR TO READ ON HEADING 086 DEG.
REF AD 2 EDDR 5-7-1 EFF 05 NOV 2020, 5-7-2 EFF 01 MAR 2018.
Start Date UTC
04/25/2023 15:49
Conditions
CHANGES TO SID PROC DUE TO DECOMMISSIONING OF SR NDB:
RWY 09:
GTQ 1E: AMEND ON COURSE 086 DEG SR TO READ ON R264 ZWN.
TOMPI 6E: AMEND ON COURSE 086 DEG SR TO READ ON HEADING 086 DEG.
REF AD 2 EDDR 5-7-1 EFF 05 NOV 2020, 5-7-2 EFF 01 MAR 2018.
A1917/23
04/25/2023 15:50
PERM
CHANGES TO APCH PROC DUE TO DECOMMISSIONING OF SR NDB:
RWY 27:
NDB APCH TEMPO SUSPENDED.
REF AD 2 EDDR 4-4-1 EFF 05 NOV 2020.
Start Date UTC
04/25/2023 15:50
Conditions
CHANGES TO APCH PROC DUE TO DECOMMISSIONING OF SR NDB:
RWY 27:
NDB APCH TEMPO SUSPENDED.
REF AD 2 EDDR 4-4-1 EFF 05 NOV 2020.
A1961/23
04/26/2023 11:57
PERM
LOCATOR OUTER SR 360KHZ U/S.
Start Date UTC
04/26/2023 11:57
Conditions
LOCATOR OUTER SR 360KHZ U/S.
A4592/23
09/13/2023 14:34
PERM
SAARBRUECKEN DME DSB ASSOCIATED WITH ILS 27:
LOC COVERAGE UP TO 25NM IN SECTOR 8.5DEG(L) TO 9.0DEG(R) IN RELATION
TO RCL.
MNM INTERCEPTION ALT IN THESE AREAS: 3500FT AMSL.
MNM INTERCEPTION ALT AT LESS THAN 10.1NM FROM ANTENNA: 2510FT AMSL.
Start Date UTC
09/13/2023 14:34
Conditions
SAARBRUECKEN DME DSB ASSOCIATED WITH ILS 27:
LOC COVERAGE UP TO 25NM IN SECTOR 8.5DEG(L) TO 9.0DEG(R) IN RELATION
TO RCL.
MNM INTERCEPTION ALT IN THESE AREAS: 3500FT AMSL.
MNM INTERCEPTION ALT AT LESS THAN 10.1NM FROM ANTENNA: 2510FT AMSL.
A5058/23
10/05/2023 07:06
PERM
CHG TO MAPCH PROC, DUE TO DECOMMISSIONING OF SR NDB:
ILS OR LOC AND VOR RWY 27 - CLIMB STRAIGHT AHEAD TO 4000 AND EXP
VECTORING BY ATC.
CROSS 11.2 DME SAD AT OR ABV 3500. PDG 3.9 PER CENT (236FT/NM).
IN CASE OF RADIO COM FAILURE, DIVERT TO ALTN. RNP MAPCH PROC REMAINS
UNCHANGED.
REF AD 2 EDDR 4-2-1 EFF 05 OCT 2023, 4-3-2 ALL EFF 05 NOV 2020.
Start Date UTC
10/05/2023 07:06
Conditions
CHG TO MAPCH PROC, DUE TO DECOMMISSIONING OF SR NDB:
ILS OR LOC AND VOR RWY 27 - CLIMB STRAIGHT AHEAD TO 4000 AND EXP
VECTORING BY ATC.
CROSS 11.2 DME SAD AT OR ABV 3500. PDG 3.9 PER CENT (236FT/NM).
IN CASE OF RADIO COM FAILURE, DIVERT TO ALTN. RNP MAPCH PROC REMAINS
UNCHANGED.
REF AD 2 EDDR 4-2-1 EFF 05 OCT 2023, 4-3-2 ALL EFF 05 NOV 2020.