A0821/24
10/31/2024 16:40
01/28/2025 23:59
CONSTRUCTION CRANE ERECTED AT HAFNARBRAUT 18:
640646.67N 0215613.40W
HEIGHT 135 FT MSL BOOM LENGTH 70M
OBSTRUCTION IS LIT WITH OBS LGT
Start Date UTC
10/31/2024 16:40
End Date UTC
01/28/2025 23:59
Conditions
CONSTRUCTION CRANE ERECTED AT HAFNARBRAUT 18:
640646.67N 0215613.40W
HEIGHT 135 FT MSL BOOM LENGTH 70M
OBSTRUCTION IS LIT WITH OBS LGT
A0719/24
09/23/2024 07:00
12/20/2024 17:00
MOBILE CRANE AT HAUKAHLID 14 REYKJAVIK
LATITUDE: 640802.91N
LONGITUDE: 0215555.24W
ELEV: 155 FEET
BOOM LENGTH 45M
THE CRANE IS LIT WITH OBSTRUCTION LIGHTS
Start Date UTC
09/23/2024 07:00
End Date UTC
12/20/2024 17:00
Conditions
MOBILE CRANE AT HAUKAHLID 14 REYKJAVIK
LATITUDE: 640802.91N
LONGITUDE: 0215555.24W
ELEV: 155 FEET
BOOM LENGTH 45M
THE CRANE IS LIT WITH OBSTRUCTION LIGHTS
A0673/24
09/04/2024 08:00
12/04/2024 23:59
CONSTRUCTION CRANE AT LANDSPITALI BURKNAGATA
LATITUDE: 640812.1795N
LONGITUDE: 0215542.4172W
HEIGHT 145 FEET
BOOM LENGTH 65M
THE CRANE IS LIT WITH OBSTRUCTION LIGHTS
Start Date UTC
09/04/2024 08:00
End Date UTC
12/04/2024 23:59
Conditions
CONSTRUCTION CRANE AT LANDSPITALI BURKNAGATA
LATITUDE: 640812.1795N
LONGITUDE: 0215542.4172W
HEIGHT 145 FEET
BOOM LENGTH 65M
THE CRANE IS LIT WITH OBSTRUCTION LIGHTS
V0410/24
08/08/2024 00:01
11/28/2024 00:01
CAUTION: DAFIF AND PUBLISHED AIRFIELD ELEVATION DIFFERS FROM HOST NATION. HOST NATION PUBLISHED AIRFIELD ELEVATION IS 45 FT. THIS IS APPLICABLE TO ALL INSTRUMENT PROCEDURES PUBLISHED IN DOD FLIP.
Start Date UTC
08/08/2024 00:01
End Date UTC
11/28/2024 00:01
Conditions
CAUTION: DAFIF AND PUBLISHED AIRFIELD ELEVATION DIFFERS FROM HOST NATION. HOST NATION PUBLISHED AIRFIELD ELEVATION IS 45 FT. THIS IS APPLICABLE TO ALL INSTRUMENT PROCEDURES PUBLISHED IN DOD FLIP.
V0515/24
10/31/2024 00:01
11/28/2024 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) COMPLETELY WITHDRAWN SID RWY 13.
Start Date UTC
10/31/2024 00:01
End Date UTC
11/28/2024 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) COMPLETELY WITHDRAWN SID RWY 13.
V0516/24
10/31/2024 00:01
11/28/2024 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) COMPLETELY WITHDRAWN SID RWY 19.
Start Date UTC
10/31/2024 00:01
End Date UTC
11/28/2024 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) COMPLETELY WITHDRAWN SID RWY 19.
V0517/24
10/31/2024 00:01
11/28/2024 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) COMPLETELY WITHDRAWN SID RWY 31.
Start Date UTC
10/31/2024 00:01
End Date UTC
11/28/2024 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) COMPLETELY WITHDRAWN SID RWY 31.
V0518/24
10/31/2024 00:01
11/28/2024 00:01
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) COMPLETELY WITHDRAWN SID RWY 01.
Start Date UTC
10/31/2024 00:01
End Date UTC
11/28/2024 00:01
Conditions
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) COMPLETELY WITHDRAWN SID RWY 01.
A0878/24
11/18/2024 12:39
11/24/2024 23:00
APPROACH LIGHTS FOR RWY 19 MAY VARY IN
LIGHT INTENSITY, DUE TO MAINTENANCE
Start Date UTC
11/18/2024 12:39
End Date UTC
11/24/2024 23:00
Conditions
APPROACH LIGHTS FOR RWY 19 MAY VARY IN
LIGHT INTENSITY, DUE TO MAINTENANCE
A0644/22
12/01/2022 00:00
PERM
REF: AD 2 BIRK 5 - 3 BIRK RNAV STAR RWY 19 - ROUTE DESCRIPTION
CLEARANCE LIMIT FOR TIBRA 1N SHOULD READ KUSUR
Start Date UTC
12/01/2022 00:00
Conditions
REF: AD 2 BIRK 5 - 3 BIRK RNAV STAR RWY 19 - ROUTE DESCRIPTION
CLEARANCE LIMIT FOR TIBRA 1N SHOULD READ KUSUR
A0716/24
09/20/2024 11:16
PERM
BIRK STANDARD DEPARTURE CHARTS (SID) FOR RWY 01, 19, 13 AND 31
NOT AVAILABLE.
REF AIP BIRK: AD 2 BIRK 7-1, AD 2 BIRK 7-3, AD 2 BIRK 7-5 AND AD
2 BIRK 7-7.
Start Date UTC
09/20/2024 11:16
Conditions
BIRK STANDARD DEPARTURE CHARTS (SID) FOR RWY 01, 19, 13 AND 31
NOT AVAILABLE.
REF AIP BIRK: AD 2 BIRK 7-1, AD 2 BIRK 7-3, AD 2 BIRK 7-5 AND AD
2 BIRK 7-7.